Table of Contents

 

 

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

WASHINGTON, D.C. 20549

 

FORM 10-K

 

x

ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

 

For the fiscal year ended December 31, 2011

 

o

TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

 

For the transition period from                            to                           

 

Commission file number:  001-32986

 

GENERAL MOLY, INC.

(Exact Name of Registrant as Specified in Its Charter)

 

Delaware

 

91-0232000

(State or Other Jurisdiction of Incorporation or
Organization)

 

(I.R.S. Employer Identification No.)

 

 

 

1726 Cole Blvd., Suite 115

Lakewood, CO

 

80401

(Address of principal executive offices)

 

(Zip Code)

 

Registrant’s telephone number, including area code: (303) 928-8599

 

Securities registered pursuant to Section 12(b) of the Act:

 

Common Stock, par value $0.001 per share

 

NYSE Amex and Toronto Stock Exchange

(Title of Each Class)

 

(Name of each Exchange on Which Registered)

 

Securities registered pursuant to Section 12(g) of the Act:  None

 

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes o No x

 

Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act. Yes o No x

 

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes x No o

 

Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Website, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§ 232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files). Yes x No o

 

Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K (§ 229.405) is not contained herein, and will not be contained, to the best of registrant’s knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K. x

 

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company.  See definitions of “large accelerated filer”, “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act.

 

Large accelerated filer o

 

Accelerated filer x

 

 

 

Non-accelerated filer o

 

Smaller reporting company o

 

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes o No x

 

As of June 30, 2011, the aggregate market value of the registrant’s common stock held by non-affiliates of the registrant was $144,709,686 based on the closing price as reported on the NYSE Amex.

 

As of February 28, 2012, 91,185,249 shares of the registrant’s common stock, par value of $0.001 per share, were outstanding.

 

 

 



Table of Contents

 

DOCUMENTS INCORPORATED BY REFERENCE

 

Certain portions of the registrant’s definitive proxy statement to be used in connection with its Annual Meeting of Stockholders and to be filed within 120 days of December 31, 2011 are incorporated by reference into Part III, Items 10-14, of this report on Form 10-K.

 

TABLE OF CONTENTS

 

 

 

Page

 

 

 

 

Part I

 

 

 

 

ITEMS 1 & 2.

BUSINESS AND PROPERTIES

3

 

 

 

ITEM 1A.

RISK FACTORS

25

 

 

 

ITEM 1B.

UNRESOLVED STAFF COMMENTS

34

 

 

 

ITEM 3.

LEGAL PROCEEDINGS

34

 

 

 

ITEM 4.

MINE SAFETY DISCLOSURES

34

 

 

 

 

Part II

 

 

 

 

ITEM 5.

MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES

35

 

 

 

ITEM 6.

SELECTED FINANCIAL DATA

37

 

 

 

ITEM 7.

MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

37

 

 

 

ITEM 7A.

QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

47

 

 

 

ITEM 8.

FINANCIAL STATEMENTS

50

 

 

 

ITEM 9.

CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE

75

 

 

 

ITEM 9A.

CONTROLS AND PROCEDURES

76

 

 

 

ITEM 9B.

OTHER INFORMATION

76

 

 

 

 

Part III

 

 

 

 

ITEM 10.

DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE

77

 

 

 

ITEM 11.

EXECUTIVE COMPENSATION

77

 

 

 

ITEM 12.

SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS

77

 

 

 

ITEM 13.

CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE

77

 

 

 

ITEM 14.

PRINCIPAL ACCOUNTING FEES AND SERVICES

77

 

 

 

 

Part IV

 

 

 

 

ITEM 15.

EXHIBITS AND FINANCIAL STATEMENT SCHEDULES

78

 

 

 

SIGNATURES

82

 



Table of Contents

 

PART I

 

ITEMS 1 & 2.                 BUSINESS AND PROPERTIES

 

The Company

 

References made in this Annual Report on Form 10-K to “we,” “our,” “us,” “GMI,” and the “Company” refer to General Moly, Inc. and its consolidated subsidiary Eureka Moly, LLC.

 

We are a development stage company in the business of the exploration, development and mining of properties primarily containing molybdenum.  Our primary asset is an 80% interest in the Mt. Hope Project (“Mt. Hope Project”), a primary molybdenum property, located in Eureka County, Nevada.  The Mt. Hope Project has contained proven and probable molybdenum reserves totaling 1.3 billion pounds (1.1 billion pounds owned by GMI) of which 1.1 billion pounds (0.9 billion pounds owned by GMI) are estimated to be recoverable.  We are currently in the process of acquiring regulatory approvals and project financing for the Mt. Hope Project.  In 2006, we acquired a second significant molybdenum project, the Liberty Property (“Liberty Property”), located in Nye County, Nevada, which we wholly own.  The Liberty Property is anticipated to become our second molybdenum operation, after commencement of commercial production at the Mt. Hope Project, with initial production dependent on market conditions.

 

Mt. Hope Project.  In August, 2007, we completed a Bankable Feasibility Study (“Bankable Feasibility Study” or “BFS”) that provided data on the viability, expected economics, and production and cost estimates of the project.  Since publication of the BFS, we have revised several estimates, based primarily on engineering progress, which is currently 60% complete.  Our current estimates for the Mt. Hope Project capital cost requirements are referred to as the “Project Capital Estimate” and our current estimates for the Mt. Hope Project operating costs are referred to as the “Project Operating Cost Estimate”.

 

Estimated costs for construction, equipment, owner’s cost, pre-stripping and contingency are $1,039 million.  Additionally, financial assurance and pre-paid items are estimated at $115 million, resulting in a total Project Capital Estimate of $1,154 million.  The Project Capital Estimate is based on 2009 constant dollars and is subject to escalation.  We anticipate updating the Project Capital Estimate later this year.  These amounts do not include financing costs or amounts necessary to fund operating working capital and potential capital overruns.  Through December 31, 2011, we have made deposits of $66.5 million on $119.4 million in equipment orders, have spent approximately $110.5 million for the development of the Mt. Hope Project and have pre-paid $12.0 million into an escrow arrangement for electricity transmission services.  Approximately $38.8 million of the $119.4 million in outstanding equipment orders is attributed to a non-binding purchase order for 2 electric shovels.  This amount will not become a liability of the Company until such time as a binding purchase order is placed.

 

Our Project Operating Cost Estimate projects (on a 100% basis) molybdenum production of approximately 40 million pounds per year for the first five years of operations at projected average direct operating costs of $5.29 per pound, based on $80 per barrel oil equivalent energy prices.  The Costs Applicable to Sales (“CAS”) per pound, including anticipated royalties calculated at a market price of $15 per pound molybdenum, are anticipated to average $6.00 per pound.  For a reconciliation of direct operating costs, a non-GAAP measure, see page 19.  We currently estimate that, for each $10 per barrel change in oil-equivalent energy costs, the Mt. Hope Project’s direct operating costs will change by approximately $0.10 per pound.  These cost estimates are based on 2009 constant dollars and are subject to cost inflation or deflation.  In the past several years, operating costs in the mining industry have escalated on a world-wide basis as a result of major factors beyond our control, including the cost of energy and labor.  We anticipate updating these operating cost estimates later this year.

 

Processed ore grades are expected to average 0.103% over the first five years.  The mine is anticipated to have a 44-year life with 32 years of open pit mining and processing operations followed by 12 years of processing lower grade stockpiled ore.

 

The Company continues to operate under a cash conservation plan implemented in March 2009 designed to reduce expenditures and conserve cash in order to maximize financial flexibility until the Company acquires regulatory approvals and project financing.  Engineering efforts related to the Mt. Hope Project were restarted in January 2012 following the publication of the Draft Environmental Impact Statement (“DEIS”) on December 2, 2011.  We expect that the Record of Decision (“ROD”) will be received between June and September 2012.

 

3



Table of Contents

 

As of March 2009, the Company had issued purchase orders for mining and milling process equipment.  Some orders for mining equipment were cancelled, while orders for electric shovels and haul trucks were modified to become cancellable or non-binding.  Most equipment orders for the custom-built grinding and other milling process equipment are being completed by the manufacturers and the equipment is being stored.  The grinding and milling process equipment required the longest lead times and maintaining these orders was critical to the Company’s ability to rapidly restart the Mt. Hope Project development.  The Company completed negotiations with other equipment manufacturers to suspend or terminate fabrication of other milling equipment.  As funding becomes available and equipment procurement is restarted, agreements that were suspended or terminated will be renegotiated under new market terms and conditions, as necessary.

 

Based on our current plan, we expect to make additional payments on milling process equipment orders of approximately $3.7 million in 2012 and $13.0 million in 2013.  We will own the gyratory crusher, semi-autogenous grinding and ball mills and related electric mill drives, and some other long-lead equipment based on payments previously made and the final payments expected to be made in 2012 and early 2013.  Also, at December 31, 2011, we have a contract to purchase two electric shovels that is cancellable, has no firm schedule of payments, and includes a $3.4 million deposit that is forfeitable if an additional $13.0 million deposit is not made by June 30, 2012.  The Company continues to need this equipment for construction phase mine development and post-construction mining, and is committed to either renegotiate the timing and amount of the contractual deposit terms to provide more payment flexibility or obtaining additional funding sources in order to make this payment without impacting our liquidity position.

 

On February 28, the Company issued a firm purchase order for 18 haul trucks to Cashman Equipment Company, the Nevada-based dealer for Caterpillar.  The order provides for delivery of those haul trucks required to perform initial mine development, currently scheduled for the second half of 2013.  A non-refundable down-payment of $0.6 million was made at the time of order with an additional $0.6 million due 12 months prior to truck shipment, but the contract is cancellable with no further liability to the LLC up until the time of truck shipment.  An additional 6 haul trucks are not required until after the commencement of commercial production, and will be ordered at a future date.

 

The cash conservation plan has reduced our total cash utilization for general administrative and overhead expenses to approximately $1 million per month, inclusive of maintenance costs at the Liberty Property.  Such ongoing costs, combined with the $3.7 million in process equipment commitments and the $9.0 million in construction royalty advances both described in Note 10, comprise the spending requirements the Company has in place through the end of 2012 without restarting the project.  Based on our current cash on hand and our ongoing cash conservation plan, the Company expects it will have adequate liquidity through the restart of the project and execution of the financing plan without needing to drawdown available funds from the second tranche of the Bridge Loan.

 

From October 2005 to January 2008, we owned the rights to 100% of the Mt. Hope Project.  Effective as of January 1, 2008, we contributed all of our interest in the assets related to the Mt. Hope Project, including our lease of the Mt. Hope Project into a newly formed entity, Eureka Moly, LLC (“LLC”), a Delaware limited liability company, and in February 2008 (“Closing Date”) entered into an agreement (“LLC Agreement”) for the development and operation of the Mt. Hope Project with POS-Minerals Corporation (“POS-Minerals”) an affiliate of POSCO, a large Korean steel company.  Under the LLC Agreement, POS-Minerals owns a 20% interest in the LLC and General Moly, through a wholly-owned subsidiary, owns an 80% interest.  The ownership interests and/or required contributions under the LLC Agreement can change as discussed below.

 

Pursuant to the terms of the LLC Agreement, POS-Minerals made its first and second cash contributions to the LLC totaling $100.0 million during the year ended December 31, 2008 (“Initial Contributions”).  Additional amounts will be due from POS-Minerals within 15 days after the date (“ROD Contribution Date”) that specified conditions (“ROD Contribution Conditions”) have been satisfied.  The ROD Contribution Conditions are (i) the receipt of major operating permits for the Mt. Hope Project, (ii) confirmation that the Record of Decision (“ROD”) from the United States Bureau of Land Management (“BLM”) for the Mt. Hope Project has become effective, and (iii) any administrative or judicial appeals with respect thereto are final.  We are currently targeting the effectiveness of the ROD and the satisfaction of the other ROD Contribution Conditions to occur between June and September 2012.  However, circumstances beyond our control, including reviewing agency delays or requests for additional information or studies, and requests for review or appeals of the BLM decision, could cause the effectiveness of the ROD and/or the satisfaction of the other ROD Contribution Conditions to be delayed beyond that estimated time.  Once the ROD is effective and financing is in place, we expect that production will begin approximately 20 months following initiation of project construction.

 

To maintain its 20% interest in the LLC, POS-Minerals will be required to make an additional $56.0 million contribution plus its 20% share of all Mt. Hope Project costs incurred from the Closing Date to the ROD Contribution Date

 

4



Table of Contents

 

within 15 days after the ROD Contribution Date.  If POS-Minerals does not make its additional $56.0 million contribution when due after the ROD Contribution Date, its interest will be reduced to 10%.

 

In addition, as commercial production at the Mt. Hope Project was not achieved by December 31, 2011, the LLC may be required to return to POS-Minerals $36.0 million of its contributions to the LLC, with no corresponding reduction in POS-Minerals’ ownership percentage.  Based on our current plan and assuming POS-Minerals has made its additional $56.0 million contribution, a payment to POS-Minerals of $36.0 million will be due 20 days after the commencement of commercial production, as defined in the LLC Agreement.  We currently anticipate such payment being made during 2014.  If POS-Minerals does not make its additional $56.0 million contribution when due, no return of contributions is required by us.  Our wholly-owned subsidiary and 80% owner of the LLC, Nevada Moly, LLC (“Nevada Moly”), is obligated under the terms of the LLC Agreement to make capital contributions to fund the return of contributions to POS-Minerals, if required.  If Nevada Moly does not make these capital contributions, POS-Minerals has an election to either make a secured loan to the LLC to fund the return of contributions, or receive an additional interest in the LLC of approximately 5%.  In the latter case, our interest in the LLC is subject to dilution by a percentage equal to the ratio of 1.5 times the amount of the unpaid contributions over the aggregate amount of deemed capital contributions (as determined under the LLC Agreement) of both parties to the LLC (“Dilution Formula”).  At December 31, 2011, the aggregate amount of deemed capital contributions of both parties was $880.0 million.

 

Furthermore, the LLC Agreement permits POS-Minerals to put its interest in the LLC to Nevada Moly after a change of control of Nevada Moly or the Company, as defined in the LLC Agreement, followed by a failure to use standard mining industry practice in connection with development and operation of the Mt. Hope Project as contemplated by the parties for a period of twelve consecutive months.  If POS-Minerals puts its interest, Nevada Moly or its transferee or surviving entity would be required to purchase the interest for 120% of POS-Minerals’ contributions to the LLC plus 10% interest per annum.

 

The Initial Contributions of $100.0 million that were made by POS-Minerals during 2008 were expended by the second quarter of 2009 in accordance with the program and budget requirements of the Mt. Hope Project.  Nevada Moly is required, pursuant to the terms of the LLC Agreement, to advance funds required to pay costs for the development of the Mt. Hope Project that exceed the Initial Contributions until the ROD Contribution Date, at which point the contributions described above to be made by POS-Minerals will be applied to reimburse us for POS-Minerals’ share of such development costs.  All costs incurred after the ROD Contribution Date will be allocated and funded pro rata based on each party’s ownership interest.  POS-Minerals’ share of such development costs amounted to approximately $37.5 million as of December 31, 2011.  The interest of a party in the LLC that does not make its pro rata capital contributions to fund costs incurred after the ROD Contribution Date is subject to dilution based on the Dilution Formula.

 

Agreements with Hanlong (USA) Mining Investment Inc.

 

We have signed a series of agreements (the “Hanlong Transaction”) with Hanlong (USA) Mining Investment, Inc. (“Hanlong”), an affiliate of Sichuan Hanlong Group, a large privately held Chinese company.  The agreements described below form the basis of a $745 million transaction that is intended to provide the Company with adequate capital to develop the Mt. Hope Project.  The agreements include:  (a) a Securities Purchase Agreement that provides for the sale to Hanlong of shares of our common stock in two tranches that will aggregate 25% of our outstanding stock on a fully diluted basis for $80 million ($40 million per tranche), conditioned upon us receiving permits for Mt. Hope and Hanlong’s use of commercially reasonable efforts to procure a $665 million loan from a Prime Chinese Bank for our use in constructing Mt. Hope; (b) a Bridge Loan whereby Hanlong will provide up to $20 million to the Company to preserve liquidity until permits are received; (c) a Stockholder Agreement that provides Hanlong representation on our Board of Directors and the LLC management committee, governs how Hanlong will vote its shares of the Company and limits Hanlong’s ability to purchase or dispose of our securities; and (d) a long-term molybdenum supply off-take agreement.

 

The Securities Purchase Agreement (“Purchase Agreement”)

 

Stock Purchase.  The Purchase Agreement provides, subject to its terms and conditions, for the purchase by Hanlong of $80.0 million of our common stock, or approximately 27.6 million shares, which will equal 25% of our outstanding common stock on a fully-diluted basis.

 

The Purchase Agreement has been amended four times including:  (1) July 30, 2010 amendment extending the deadline for obtaining Chinese government approvals by two months to October 13, 2010, as well as extending the Company’s deadline for publishing its DEIS and receiving its ROD to February 28, 2011, and November 30, 2011, respectively.  Hanlong has received Chinese government approvals for its equity investment in us and our DEIS has been

 

5



Table of Contents

 

published; (2) an October 26, 2010 amendment setting the closing of Hanlong’s purchase of the first $40.0 million tranche of equity for December 20, 2010 and eliminating the condition that required us to have our DEIS published prior to closing this funding; (3) a December 20, 2010 amendment that made certain non-substantive changes in connection with the Tranche 1 closing; and (4) July 7, 2011 amendment that eliminated the deadline for publication of the DEIS, extended the ROD deadline from November 30, 2011 to the earlier of nine months following DEIS publication or September 30, 2012, extended Hanlong’s commitment to make available the Term Loan from two months following ROD to nine months following the ROD, and extended the maturity date of the Bridge Loan to the earlier of (i) 270 days after the issuance of the ROD, (ii) the date on which the Purchase Agreement terminates, and (iii) the earlier of December 31, 2012 and the availability of the Term Loan.

 

The ROD deadline is extendable by up to three months to December 31, 2012, as discussed below.  The Purchase Agreement may be terminated by either party (provided the terminating party is not in default) if the closing of the second tranche (“Tranche 2”) has not occurred on or before the earlier of September 30, 2012 (unless the parties have agreed to the ROD Condition Extension date of December 31, 2012) or twelve months after the issuance of the ROD.

 

As discussed above, the second tranche will also be for a purchase price of an additional $40.0 million.  Significant conditions to the closing of Tranche 2 include issuance of the ROD for the Mt. Hope Project by the BLM, approval of the plan of operations for the Mt. Hope Project (the “POO”) by the BLM, and the completion of documentation for and satisfaction of conditions precedent for the availability of funding under the Term Loan, described below.

 

Hanlong will have the right to purchase a portion of any additional shares of common stock that we issue so that it can maintain its percentage ownership, unless its ownership is at the time below 5% at the earlier of the closing of Tranche 2 or closing of the Term Loan.  It may also acquire additional shares so that it maintains a 20% indirect interest in the Mt. Hope Project if our interest in the LLC is reduced below 80%.  If we issue shares to fund the Mt. Hope Project under certain circumstances, and on or before the date of commercial production, and Hanlong exercises its rights to maintain its percentage interest, we will be obligated to refund to Hanlong the cost of such shares over a three-year period up to an aggregate of $9.0 million.

 

Break Fees.  A break fee is payable by both the Company and Hanlong if the Purchase Agreement terminates because of the failure of certain conditions.  A break fee of $10.0 million is payable to the Company if the Purchase Agreement is terminated because Hanlong fails to obtain necessary Chinese government approvals, which may be offset against any balances owed by the Company under the Bridge Loan.  A break fee of $5.0 million is payable to Hanlong if the ROD is not timely received or the condition waived and the Purchase Agreement is terminated.  The Company’s break fee may be increased by $5.0 million if the Purchase Agreement is terminated and the Company has violated the “no-shop” provisions of the Purchase Agreement.  The break fees may also be increased by up to $2.0 million if the Company requests and Hanlong grants an extension concerning the ROD (the “Extension Fee”).  Any such fee will be credited against the arrangement fee described below.  The break fee payable by the Company to Hanlong may be paid in cash, or, in certain circumstances, in shares of our common stock at our option.  If paid in shares, the price would be the volume weighted average of our common stock on the NYSE Amex for the five days ending six days after the announcement of the termination.  On January 9, 2012, the Company and Hanlong executed an option agreement concerning the Purchase Agreement for no consideration.  The option must be exercised on or before December 31, 2012.  If the option is exercised, the parties will amend the Purchase Agreement to extend payment of the Extension Fee from December 2012 until April 30, 2013.

 

Chinese Bank Term Loan.  Hanlong is obligated to use commercially reasonable efforts to procure a Term Loan in an amount of at least $665.0 million with a term of at least 14 years after commercial production begins at the Mt. Hope Project.  The Term Loan will bear interest at a rate tied to the London Interbank Offered Rate (“LIBOR”) plus a spread of between 2% and 4% per annum.  The Purchase Agreement provides that the Term Loan will have customary covenants and conditions; however, the terms of the Term Loan have not yet been negotiated with the lender and we have no assurance as to the final terms of the Term Loan.  On February 16, 2012, the Company announced China Development Bank (“CDB”) had confirmed the basic terms underlying a proposed $665 million term loan to finance the Mt. Hope project, including a CDB commitment to lend $399 million and arrange a consortium of Chinese and international banks to fund the balance.  The term loan is anticipated to carry a maturity of 12 years including a 30 month grace period to allow for the construction of the Mt. Hope project.  The interest rate will remain subject to market conditions and Chinese government policy.  The Company and Hanlong are continuing to work with CDB with a target of having the loan completed, approved and available to the Company upon receipt of Mt. Hope’s operating permits.  Hanlong or an affiliate is obligated to guarantee the Term Loan.  When funds can be drawn by the Company under the Term Loan, the Company will pay a $15.0 million arrangement fee to Hanlong who will pay fees and expenses associated with the Term Loan before the Term Loan Closing, including those charged by the Chinese bank.

 

6



Table of Contents

 

Bridge Loan

 

Hanlong agreed to provide a $20.0 million Bridge Loan to the Company, available in two equal $10.0 million tranches.  On April 28, 2010, we drew down the first $10.0 million tranche.  The second tranche became available after receiving stockholder approval of the Hanlong Transaction.  The first tranche of the Bridge Loan bears interest at LIBOR plus 2% per annum.  The second tranche of the Bridge Loan will bear interest at 10% per annum and is undrawn.  The Bridge Loan will be repaid from the proceeds of the Term Loan.  The second tranche may also be repaid at the Company’s election, in shares of the Company’s common stock.  If paid in shares, the price would be the volume weighted average of the Company’s shares on the NYSE Amex for a five-day period after public announcement of the event that required repayment.  The Company may offset its right to receive the break fee against its obligations to repay borrowings under the Bridge Loan.  On January 9, 2012, the Company and Hanlong executed an option agreement concerning the Bridge Loan Agreement.  The option must be exercised on or before December 31, 2012.  If exercised, the parties will amend the Bridge Loan Agreement to extend the maturity date of the Bridge Loan from December 31, 2012 to April 30, 2013.  This option also has the effect of potentially extending the availability of the undrawn $10.0 million second tranche to April 30, 2013 since the availability of the second tranche ends the earliest of the Tranche 2 closing date, the maturity date of the Bridge Loan and the first borrowing under the Term Loan.

 

The outstanding balance of the Bridge Loan and related accrued interest are recorded as a current liability as of December 31, 2011 as the Company anticipates the Term Loan will become available within the next twelve months.  The Bridge Loan and our obligation to pay a break fee to Hanlong under the Purchase Agreement are secured by a pledge by us of a 10% interest in the LLC.

 

Stockholder Agreement

 

In connection with Hanlong’s purchase of our shares, Hanlong signed a Stockholder Agreement with the Company that limits Hanlong’s future acquisitions of our common stock, provides for designation of up to two directors to our Board and representation on the LLC management committee, and places some restrictions on Hanlong’s voting and disposition of our shares.

 

After the Tranche 1 closing, Hanlong became entitled to nominate one director to serve on our Board and one representative to the LLC management committee.  Nelson Chen currently serves in both of these capacities.  After the Tranche 2 closing, Hanlong will be entitled to nominate a second director.  The Company will include and recommend the election of Hanlong’s nominees in the Board’s slate of nominees submitted to our stockholders, subject to the Board’s fiduciary obligations concerning nomination of directors and compliance by the nominee with applicable law and Company requirements concerning disclosure of information.  The Hanlong nominees may also serve on committees for which they are eligible.

 

Hanlong has agreed not to purchase additional shares, except as permitted by the Purchase Agreement, without the Company’s prior consent, and has agreed that it will not solicit proxies, join a group with respect to our equity securities, solicit or encourage an offer from another person for the Company, call a meeting of the Company’s stockholders or make a proposal to the Company’s stockholders, except to the Board.  If our Board receives an offer for the Company, for its assets or a merger that the Board determines is in the best interests of the Company’s stockholders, Hanlong is required to vote in favor of such a transaction or tender its shares unless it proposes an alternative transaction that our Board determines is more favorable to our stockholders than the offer received.

 

Hanlong may not, without the prior written consent of the Board, transfer ownership of their securities if the recipient would acquire beneficial ownership of more than 5% of our common stock as of the date of such transfer.  The restrictions on Hanlong’s share ownership, voting, disposition and drag-along rights will terminate on the earlier of the time that Hanlong owns less than 10% of our common stock, the date that is 6 months after the date that commercial production begins at the Mt. Hope Project, and June 30, 2014.

 

7



Table of Contents

 

ArcelorMittal n/k/a APERAM Participation

 

The Company’s November 2007 private placement of 8.257 million shares with ArcelorMittal, included certain anti-dilution rights.  Pursuant to those rights, ArcelorMittal had an option to participate in the Tranche 1 and Tranche 2 equity issuances.  On April 16, 2010, the Company and ArcelorMittal entered into a Consent and Waiver Agreement (the “Agreement”) whereby ArcelorMittal waived its anti-dilution rights with respect to the Company’s proposed issuance of stock under the Hanlong investment.  ArcelorMittal will retain anti-dilution rights for future issuances of Company stock outside of shares sold under the Hanlong investment.  On January 25, 2011, the boards of directors of ArcelorMittal S.A. and APERAM each approved the transfer of the assets comprising ArcelorMittal’s stainless and specialty steels businesses from its carbon steel mining businesses to APERAM, a separate entity incorporated in the Grand Duchy of Luxembourg.  This transfer included the off-take agreement the Company had in place with ArcelorMittal and the shares of the Company’s common stock previously owned by ArcelorMittal.

 

Liberty Property

 

In March 2006, we purchased the Liberty Property in Nye County, Nevada, including water rights, mineral and surface rights, buildings and certain equipment, from High Desert Winds LLC.  The Liberty Property includes the former Hall molybdenum and copper deposit that was mined by open pit methods between 1982 and 1985 by the Anaconda Minerals Company (“Anaconda”) and, between 1988 and 1991, by Cyprus Metals Company (“Cyprus”).  In addition, Equatorial Tonopah, Inc. mined copper from 1999 to 2000 on this property, although their operations were in a separate open pit.  Much of the molybdenum deposit was drilled but not developed or mined by these previous owners.

 

In January 2007, we purchased the corporation that owned a 12% net smelter royalty on the Liberty Property, effectively eliminating all third party royalties on the property.  Additionally in 2007, we purchased all outstanding mineral claims associated with this property that were not previously owned by us, thus giving us control over all mineral rights within the boundary of the Liberty Property.

 

Since purchasing the Liberty Property, we completed two drilling programs that, combined with previous evaluation work performed by former owners, identified mineralization totaling 541.4 million tons with ore grades averaging 0.067% molybdenum and 0.08% copper.  In April 2008 we completed a pre-feasibility study outlining project viability, expected economics, and production and cost estimates.  On October 3, 2011 the Company released an updated National Instrument 43-101, Standards of Disclosure for Mineral Projects (“NI 43-101”) compliant resource estimate and on November 15, 2011 released an updated pre-feasibility study detailing updated resource estimates and project economics.  The NI 43-101 is a codified set of rules and guidelines for reporting and displaying information related to mineral properties owned by, or explored by, companies which report these results on stock exchanges within Canada. The completed report estimates molybdenum and copper reserves and resources, production, capital and operating cost parameters, along with project economics.  The Company spent approximately $0.9 million to complete the pre-feasibility study and NI 43-101.

 

Other Mining Properties

 

We also have mining claims and land purchased prior to 2006 which consist in part of (a) approximately 107 acres of fee simple land in the Little Pine Creek area of Shoshone County, Idaho, (b) six patented mining claims known as the Chicago-London group, located near the town of Murray in Shoshone County, Idaho, (c) 265 acres of private land with three unpatented claims in Josephine County, Oregon, known as the Turner Gold project, (d) an undivided 50% interest in the reserved mineral rights known as the Margaret Property and 105 unpatented mining claims comprising the Red Bonanza Property, situated in the St. Helens Mining District, Skamania County, Washington; and (e) 34 unpatented mining claims in Marion County, Oregon, known as the Detroit property.  Our efforts at these properties are minimal and consume no significant financial resources.

 

We have entered into option to purchase agreements on three of these properties.  See Note 4 for additional discussion on these agreements.

 

Corporate Information

 

The Company was initially incorporated in Idaho under the name “General Mines Corporation” in 1925.  We have gone through several name changes and on October 5, 2007, we reincorporated the Company in the State of Delaware (“Reincorporation”) through a merger of Idaho General Mines, Inc. with and into General Moly, Inc., a Delaware corporation that was a wholly owned subsidiary of Idaho General Mines, Inc. with General Moly being the surviving entity.  In

 

8



Table of Contents

 

connection with the Reincorporation, all of the outstanding securities of Idaho General Mines, Inc. were converted into securities of General Moly on a one-for-one basis.  For purposes of the Company’s reporting status with the U.S. Securities and Exchange Commission (“SEC”), General Moly is deemed a successor to Idaho General Mines, Inc. Our common stock is traded on the NYSE Amex under the symbol “GMO” and, in February 2008, the Company began trading on the Toronto Stock Exchange (“TSX”) under the same symbolOur registered and principal executive office is located at 1726 Cole Blvd., Suite 115, Lakewood, Colorado 80401 and the phone number for that office is (303) 928-8599.

 

We maintain a website at www.generalmoly.com, on which we will post free of charge our annual reports on Form 10-K, quarterly reports on Form 10-Q, Extensible Business Reporting Language (“XBRL”) documents, and any amendments to these reports under the heading “Investors” as soon as reasonably practicable after we electronically file such material with, or furnish it to, the SEC.  We also routinely post important information about the Company on our website under the heading “Investors.”  We do not incorporate the information on our website into this document and you should not consider any information on, or that can be accessed through, our website as part of this document.  You may read and copy any materials we file with the SEC at the Securities and Exchange Commission Public Reference Room at 100 F Street NE Washington, DC 20549.  Information regarding the operation of the Public Reading Room may be obtained by calling the SEC at 1.800.SEC.0330.  The SEC also maintains a website that contains our reports and other information at www.sec.gov.

 

Corporate Strategy and Objective

 

Our corporate strategy is to acquire and develop highly profitable advanced stage mineral deposits.  Our near-term corporate objective is to profitably develop and operate the Mt. Hope Project and to complete our evaluation and commence development of the Liberty Property.  In the short-term, we are focused on receiving permits and financing required to complete the development of the Mt. Hope Project based on our current schedule, while at the same time conserving our cash resources until such permits are received.

 

We believe we have the following business strengths that will enable us to achieve our objectives:

 

·                                          A strong, proven management team with experience in mine development, project financing, and operations.

 

·                                          The Mt. Hope Project, of which we own 80%, currently in the permitting and development stage, is anticipated to be one of largest and lowest cost primary molybdenum projects in the world, driven, in part, by high ore grades that will be processed early in the mine life.

 

·                                          Our Liberty Property has the potential to become a second, significant, molybdenum operation and is wholly-owned by the Company and royalty-free.

 

·                                          The Mt. Hope Project and the Liberty Property are located in Nevada, which has a long and ongoing history of large-scale, open pit mining operations.

 

·                                          Both the Mt. Hope Project and the Liberty Property have near-by infrastructure for power, access roads, and water and have an environmentally friendly design.

 

·                                          We have strong international support from the steel industry.

 

·                                          We anticipate favorable long-term market fundamentals for molybdenum.

 

Products

 

We do not currently produce any products.  When the Mt. Hope Project is developed, we expect production (on a 100% basis) of 40 million pounds of molybdenum per year over the first five years on average and approximately 1.1 billion pounds of molybdenum over the expected 44-year life of the project.  The Mt. Hope Project will primarily focus on producing Technical Grade Molybdenum Oxide (“TMO”), which is widely utilized by the steel industry.  In the future, we may also consider producing FerroMolybdenum (“FeMo”), and have designed the Mt. Hope Project plant to accommodate this process, which is also used by the steel industry and would make the Company a more complete supplier to the steel industry.

 

Molybdenum is a refractory metal with very unique properties.  Approximately 70% to 80% of molybdenum applications are in steel making.  Molybdenum, when added to plain carbon and low alloy steels, increases strength,

 

9



Table of Contents

 

corrosion resistance and high temperature properties of the alloy.  The major applications of molybdenum containing plain and low alloy steels are automotive body panels, construction steel and oil and gas pipelines.  When added to stainless steels, molybdenum imparts specialized corrosion resistance in severe corrosive environments while improving strength.  The major applications of stainless steels are in industrial chemical process plants, desalinization plants, nuclear reactor cooling systems and environmental pollution abatement.  When added to super alloy steels, such as those used in Jet turbine blades and other advance aerospace engine components, molybdenum dramatically improves high temperature strength, thermal expansion and contraction resistance and resistance to oxidation.  The effects of molybdenum additions to steels are not readily duplicated by other elements and as such are not significantly impacted by substitution of other materials.

 

Other significant molybdenum applications include lubrication, catalytic sulfur reduction in petrochemicals, lighting, LCD activation screens, x-ray generation, high temperature heat dissipation and high temperature conductivity.  These areas represent the highest technical and value-added applications of molybdenum, but are also the most readily replaceable in times of technical or economic downturns.

 

Competitive Conditions

 

Molybdenum exploration, development and production is a competitive business.  We anticipate competing with numerous molybdenum suppliers once the Mt. Hope Project achieves production.

 

The supply of molybdenum comes from both primary molybdenum mines, such as our proposed Mt. Hope Project, and as a byproduct of porphyry copper production.  Each source of supply represents approximately 50% of the molybdenum produced annually, which was forecast to grow to 535 million pounds in 2011, according to CPM Group, an industry consultant.  Although many companies produce molybdenum, many of which also mine other minerals, approximately two-thirds of global production is concentrated among ten companies.

 

After we commence production at both our Mt. Hope Project and Liberty Property, our competitive position will be based on the quality and grade of our ore bodies and our ability to manage costs compared with other producers.  Our costs are driven by the grade and nature of our ore bodies as well as input costs, including energy, labor and equipment.  Our ability to have a competitive position over the long-term will be based on, among other things, the large size of our combined ore resources and anticipated production rate capacity as well as our intention to hire and retain a skilled workforce, and manage our costs.

 

Employees

 

The Company had a total of 36 employees, including 32 exempt and 4 hourly employees, as of December 31, 2011.

 

Description of the Mt. Hope Project

 

Overview

 

The discussion in this section is based on the entire Project, of which we own an 80% interest. The LLC is proceeding with the permitting and development of the Mt. Hope Project.  The Project will include the development of an open pit mine, construction of a concentrator and a roaster, and construction of all related infrastructure to produce TMO, the most widely used molybdenum product.

 

From November 2004 through August 2007 we conducted numerous exploration, drilling and evaluation studies, culminating in the BFS for the Mt. Hope Project.  In 2005, we initiated the baseline studies necessary for development of an Environmental Impact Statement (“EIS”).  We completed an initial POO, which the BLM accepted in September 2006.  In December 2006, the BLM selected an environmental firm to complete the EIS for the Mt. Hope Project.  Since that time, the Company has been working with the environmental firm to complete the EIS.  We are currently targeting the effective date of the ROD and the satisfaction of the other ROD Contribution Conditions to occur between June and September of this year.  The public comment period for the DEIS commenced at its publication on December 2, 2011 and ended on March 1, 2012.  Circumstances beyond our control, including reviewing agency delays or requests for additional information or studies, and requests for review or appeals of the BLM decision, could cause the effectiveness of the ROD and/or the satisfaction of the other ROD Contribution Conditions to be delayed.  Once the ROD is effective and financing is in place, we can commence construction.  We estimate that production will begin approximately 20 months following initiation of project construction.

 

10



Table of Contents

 

In addition to working to complete the EIS, we are working to finalize the transfer of water rights to mining use.  In March 2009 we were granted our water applications in a Ruling by the State Engineer.  However, that Ruling was successfully appealed in April 2010 in Nevada District Court (“NDC”), remanding the matter for another hearing by the State Engineer.

 

On July 15, 2011, the State Engineer issued a second Ruling granting the Company’s water right applications.  In August 2011, Eureka County and two other parties comprised of three individual water rights holders in Diamond Valley and one in Kobeh Valley, filed Petitions and Amended and Supplemental Petitions (“Petitions”) with the NDC appealing the second Ruling of the State Engineer.  We continue to anticipate a favorable NDC decision, upholding the State Engineer’s second Ruling.  The appeal hearing is set for April 3, 2012 before the NDC.  A decision by the NDC is expected in mid-2012, although the NDC is not required to act under any specified timeline.  The appeal does not prevent the State Engineer from issuing the permits and as such, the State Engineer completed issuance of all permits on December 14, 2011 and certain amended permits on January 4, 2012 subject to the second Ruling.  The water will become available for consumptive use following the State Engineer’s approval of the Company’s Monitoring, Management and Mitigation Plan (“3M Plan”), developed with the input and cooperation of Eureka County. The Company is continuing to work with the State Engineer and Eureka County following our prior submissions, to finalize the 3M Plan and we anticipate the State Engineer will approve the 3M Plan prior to commencement of construction, in the second half of 2012.

 

On August 19, 2010, the LLC entered into an agreement with the Eureka Producers’ Cooperative (the “EPC”) whereby the LLC will fund a Sustainability Trust (the “Trust”) in exchange for the cooperation of the EPC with respect to the LLC’s water rights and permitting of the Mt. Hope Project.  The Trust will be tasked with developing and implementing programs that will serve to enhance the sustainability and well-being of the agricultural economy in the Diamond Valley Hydrographic Basin through reduced water consumption.

 

The Trust may be funded by the LLC over several years based on the achievement of certain milestones.  The achievement of these milestones is considered to be probable, and as such $4.0 million is accrued in the Company’s December 31, 2011, financial statements and is included in mining properties, land, and water rights.

 

In addition to the ROD and the water rights, three state-issued permits are viewed as major environmental permits; the Water Pollution Control (“WPC”) Permit, the Air Quality Permit (“AQP”), and the Reclamation Permit.  The LLC continues to develop the applications and supporting information for these permits.  At the request of Eureka County, the Nevada Department of Environmental Protection, Bureau of Air Pollution Control (“NDEP-BAPC”) scheduled a public meeting on the Company’s draft AQP on February 28, 2012 in Eureka, Nevada.  These permits are anticipated to be received on or before the date that the ROD is received (see “Permitting- Mt. Hope Permitting Requirements” below).

 

The Mt. Hope Project — the LLC

 

The Mt. Hope Project is owned and will be operated by the LLC under the LLC Agreement.  The LLC currently has a 30-year renewable lease (“Mt. Hope Lease”) with Mount Hope Mines, Inc. (“MHMI”) for the Mt. Hope Project.  Located in Eureka County, Nevada, the Mt. Hope Project consists of 13 patented lode claims and one millsite claim, which are owned by MHMI and leased to the LLC, and 1,521 unpatented lode claims, including 109 unpatented lode claims owned by MHMI and leased to the LLC and 1,412 unpatented lode claims owned by the LLC.  Patented claims are owned real property and unpatented claims are held subject to the paramount title of the United States and remain valid for as long as the claim contains a discovery of valuable minerals as defined by law and the holder pays the applicable fees.

 

The Mt. Hope Lease is subject to the payment of certain royalties.  See “Business—Description of the Mt. Hope Project—Royalties, Agreement and Encumbrances” below.  In addition to the royalty payments, the LLC is obligated to maintain the property and its associated water rights, including the payment of all property taxes and claim maintenance fees.  The LLC must also indemnify MHMI against any and all losses incurred as a result of any breach or failure to satisfy any of the terms of the Mt. Hope Lease or any activities or operations on the Mt. Hope property.

 

The LLC is not permitted to assign or otherwise convey its obligations under the Mt. Hope Lease to a third party without the prior written consent of MHMI, which consent may be withheld at its sole discretion.  If, however, the assignment takes the form of a pledge of our interest in the Mt. Hope Project for the purpose of obtaining financing, MHMI’s consent may not be unreasonably withheld.  The Mt. Hope Lease further requires the LLC to keep the property free and clear of all liens, encumbrances, claims, charges and burdens on production except as allowed for a project financing.

 

The Mt. Hope Lease requires that the terms of any project financing must provide that: (i) any principal amount of debt can only be repaid after payment of the periodic payments as set out in the Mt. Hope Lease; (ii) the lenders may not

 

11



Table of Contents

 

prohibit or interfere with any advance royalty payments due to MHMI under the Mt. Hope Lease; and (iii) no cash sweeps or payments of excess cash flow may be made to the lenders in priority of such advance royalty payments.

 

The Mt. Hope Lease also contains an after acquired property clause, which requires that any property acquired by the LLC within two miles of the boundary of the Mt. Hope Project be conveyed to MHMI if requested within a certain time period following notification of such acquisition.  MHMI has requested that we maintain ownership of all new claims filed by the LLC, which now includes 1,412 unpatented lode claims.

 

The Mt. Hope Lease is for a term of 30 years, but is extended beyond 30 years if the Mt. Hope Project is in production or intends to resume production (and has provided notice to MHMI accordingly).  The lease may be terminated at the election of the LLC, or upon a material breach and failure to cure such breach.  If the LLC terminates the lease, the termination is effective 30 days after receipt by MHMI of written notice to terminate the Mt. Hope Lease.  If MHMI terminates the lease, termination is effective upon receipt of a notice of termination of a material breach, representation, warranty, covenant or term contained in the Mt. Hope Lease and followed by failure to cure such breach within 90 days of receipt of a notice of default.  MHMI may also elect to terminate the Mt. Hope Lease if the LLC has not cured the non-payment of obligations under the lease within 10 days of receipt of a notice of default.

 

Property Description and Location

 

The Mt. Hope Project is located on the eastern flank of Mt. Hope approximately 21 miles north of Eureka, Nevada.  The Mt. Hope Project is located at the southern end of the northwest-trending Battle Mountain-Eureka mineral belt.  Mt. Hope is approximately 2.6 miles due west of State Route 278, and the Mt. Hope Project centers in sections 1 and 12, T22N-R51E and sections 12 and 13, T22N-R51½E.

 

GRAPHIC

 

Royalties, Agreements and Encumbrances

 

Advance Royalty

 

The Mt. Hope Lease is for a period of 30 years from October 19, 2005 and for so long thereafter as operations are being conducted on the property.  The lease may be terminated earlier at the election of the LLC, or upon a material breach of the agreement and failure to cure such breach.  If the LLC terminates the lease, termination is effective 30 days after receipt by MHMI of written notice to terminate the Mt. Hope Lease and no further payments would be due to MHMI.  In order to maintain the lease, the LLC must pay certain deferral fees and advance royalties as discussed below.

 

12



Table of Contents

 

The Mt. Hope Lease requires a royalty advance (“Construction Royalty Advance”) of 3% of certain construction capital costs, as defined in the Mt. Hope Lease.  The LLC is obligated to pay a portion of the Construction Royalty Advance each time capital is raised for the Mt. Hope Project based on 3% of the expected capital to be used for those certain construction capital costs defined in the Mt. Hope Lease.  Through December 31, 2011, we have paid $13.7 million of the total Construction Royalty Advance, including $9.0 million paid on October 19, 2011.  Based on our Mt. Hope Project capital budget we estimate that an additional $9.0 million must be paid on or before October 19, 2012, which has been accrued.

 

Once the Construction Royalty Advance has been paid in full, the LLC is obligated to pay an advance royalty (“Annual Advance Royalty”) each October 19 thereafter in the amount of $0.5 million per year.  The Construction Royalty Advance and the Annual Advance Royalty are collectively referred to as the “Advance Royalties.”  All Advance Royalties are credited against the MHMI production royalties once the mine has achieved commercial production.  After the mine begins production, the LLC estimates that the Production Royalties will be in excess of the Annual Advance Royalties for the life of the Mt. Hope Project and, further, that the Construction Royalty Advance will be fully recovered (credited against MHMI production royalties) by the end of the third year of commercial production.

 

Production Royalty

 

Following commencement of commercial production, the LLC will be required to pay a production royalty to MHMI and Exxon Corporation (“Exxon”) as follows:

 

(a)                                 MHMI Production Royalty

 

After commencement of commercial production at the Mt. Hope Project, the LLC will be required to pay to MHMI a production royalty equal to the greater of: (i) $0.25 per pound of molybdenum metal (or the equivalent of some other product) sold or deemed to be sold from the Mt. Hope Project; or (ii) 3.5% of net returns (“Base Percentage”), if the average gross value of products sold is equal or lower than $12.00 per pound, or the Base Percentage plus 1% of net returns if the average gross value of products sold is higher than $12.00 per pound but equal or lower than $15.00 per pound, or the Base Percentage plus 1.5% of net returns if the average gross value of products sold is higher than $15.00 per pound (“MHMI Production Royalties”).  As used in this paragraph, the term “products” refers to ores, concentrates, minerals or other material removed and sold (or deemed to be sold) from the Mt. Hope Project; the term “gross value” refers generally to proceeds received by us or our affiliates for the products sold (or deemed to be sold); and the term “net returns” refers to the gross value of all products, less certain direct out of pocket costs, charges and expenses actually paid or incurred by us in producing the products.

 

(b)                                 Exxon Production Royalty

 

Exxon will receive a perpetual 1% royalty interest in and to all ores, metals, minerals and metallic substances mineable or recoverable from the Mt. Hope Project in kind at the mine or may elect to receive cash payment equal to 1% of the total amount of gross payments received from the purchaser of ores mined/removed/sold from property net of certain deductions.

 

Environmental Regulations and Permits

 

The Mt. Hope Project is subject to numerous state and federal environmental regulations and permits.  See “Applicable Mining Laws” and “Permitting” below for a detailed description of these requirements.

 

Accessibility, Climate, Local Resources, Infrastructure and Physiography

 

Access

 

The Mt. Hope Project has year-round access from Nevada State Route 278 (“Route 278”).  The land package includes the land between the project site and Route 278 making the project accessible from existing roads.

 

Climate

 

Climate in the area is moderate, with average highs in July of about 86 degrees Fahrenheit and lows in January of about 13 degrees Fahrenheit.  Precipitation in the area is relatively low with annual precipitation averages of about 12 inches.  Operations at the site are planned to continue year-round.

 

13



Table of Contents

 

Local Resources and Infrastructure

 

The town of Eureka, Nevada is approximately 21 miles to the south of the Mt. Hope Project, via Route 278.  The infrastructure requirements to support the mine and concentrator consist of bringing power and water to the property,  commensurate with the operational requirements, including developing a water well field within the Kobeh Valley, constructing site access roads, and constructing maintenance shops for the mine and plant administrative offices.  A 230kV power line is expected to be developed from the Machacek substation near the town of Eureka to the mine site.

 

Water Rights and Surface Rights

 

Planned water wells, located approximately 6 miles to the southwest of the planned operating facilities, are anticipated to supply approximately 7,000 gallons per minute (“gpm”) to the Mt. Hope Project.  Exploration for water is sufficiently advanced to identify the source of water that will be used for all project water needs, with final fresh water development to occur during the construction of the project.  (See “Permitting — Mt. Hope Permitting Requirements — Water Appropriation Permits-Nevada Division of Water Resources” below for a discussion of the current status of our applications for water rights for use in the Mt. Hope Project).

 

Surface rights on the Mt. Hope Project include BLM open range grazing rights and stock water rights.  Two power line easements cross within the property boundaries.  An existing easement for a 345kV transmission line runs north-south on the western edge of the property and the other existing easement is a medium-voltage power line that runs east along the main existing access road that connects to Route 278 to the eastern property boundary.

 

Physiography

 

The Mt. Hope area lies within an area of north-south trending mountains separated by alluvial valleys.  The primary mountain ranges in the Mt. Hope area include the Roberts Mountains, Sulphur Spring Range, Diamond Mountains, Simpson Park Range, and the Cortez Mountains.  Elevations of the mountains range from approximately 6,800 feet for the crests of the Sulphur Spring range to over 10,000 feet for the Roberts Mountains.

 

The major valleys in the Mt. Hope region are Diamond Valley to the east, Pine Valley to the north, and Kobeh Valley to the west.  Diamond and Pine Valleys are elongated in a north-south direction.  Kobeh Valley is located to the west and southwest of the Mt. Hope Project.

 

The upper portions of the valleys are similar in nature and are characterized by slightly incised stream channels with no significant associated floodplain.  The uplands and mountains have slopes ranging from moderate to steep (over 30 percent) with shallow to deep, moderately alkaline to medium acidic soils.  Bedrock is often within 0.5 meters of the surface, particularly on the steep upland slopes.

 

Lake sediments make up the largest areas in the valleys.  The slopes range from smooth to rolling (0 to 15 percent), and the soils vary from shallow to deep and mildly to strongly alkaline.  The surface textures range from silty clay loams to gravelly sandy loams and local sand.  The permeability of these soils ranges from slow to rapid.

 

The natural vegetation of the region consists of pinion juniper and sagebrush with grass.  The pinion juniper occupies the higher elevations of the mountain slopes, with the lower areas in the valley covered predominantly with sagebrush and shrubs with perennial bunchgrasses.

 

Mt. Hope, located in the lower foothills of the southeast flank of the Roberts Mountains, stands approximately 8,400 feet in elevation.  Areas to the east and southeast slope gently to elevations from 6,400 to 7,900 feet.  Diamond Valley, situated to the south and east, is approximately 6,000 feet in elevation.

 

History

 

Prior Ownership and Results of Exploration Work

 

Lead-zinc ores were discovered at Mt. Hope in 1870, and small-scale mining was carried out sporadically until the 1970s.  Zinc and adjacent copper mineralization were the focus of drilling activities by Phillips Petroleum in the early 1970s and by ASARCO and Gulf (“ASARCO”) in the mid-1970s, which outlined further zinc mineralization.  The last drill hole of this series encountered significant molybdenum mineralization at depth west of the zinc deposits.  The significance of this

 

14



Table of Contents

 

mineralization was first recognized by ASARCO in 1976, but ASARCO did not reach an agreement with MHMI to test this potential.

 

Exxon recognized molybdenum potential at Mt. Hope in 1978 and acquired an option on the property from MHMI.  By 1982, Exxon had completed 69 holes, which partially defined a major molybdenum deposit underlying the east flank of the Mt. Hope property.  Exxon conducted a +/-25% feasibility study of the Mt. Hope project in 1982.  A draft EIS was completed on the project and public hearings were held in early 1985.  Exxon drilled an additional 60 holes on the property between 1983 and 1988 but did not update their deposit block model with data from the post-1982 holes.  Cyprus drilled four holes on the property in 1989-90 under an agreement with Exxon but did not pursue the project.

 

We established an agreement with MHMI in 2004 pursuant to which we obtained access to the work completed by previous companies that had evaluated the property, including drill core and drill data.  We used this data as the basis for developing an evaluation of the Mt. Hope deposit.  The evaluation provided the basic engineering, plant design and other aspects of analysis of the Mt. Hope Project and outlined a positive operating process, waste disposal, mine design and plan, preliminary Environmental Assessment (“EA”), permitting plan, operating and capital cost estimates, and the corresponding estimates of mineralized material.

 

Geology

 

Mt. Hope is located in north-central Nevada on the eastern edge of a mineral belt linking ore deposits of diverse ages. The Battle Mountain-Eureka mineral belt, a northwest-southeast trending corridor about 250 miles long, has localized major deposits of gold, silver, copper, and molybdenum.

 

The Mt. Hope molybdenum ore deposit occurs in an area of about two square miles of elevated igneous rocks.  The mineralized complex includes a variety of igneous rocks derived from a common volcanic source.  Quartz porphyry, the primary molybdenum host rock, is commonly veined with molybdenite.  Subordinate molybdenum mineralization also occurs in hornfels. The known orebody occurs in two zones of the quartz porphyry stock and hornfels wallrocks.

 

The ore deposit is a molybdenum porphyry, which is classified as a “Climax—type” deposit.  This type of deposit has well zoned molybdenum mineralization.  The molybdenum mineral content, termed grade zoning, surrounds the central area of the deposit and forms geometries that are circular in plan and arch shaped in section. The mineral zones or “shells” consist of quartz porphyry and hornfels cross-cut by quartz stockwork veining containing molybdenite.  Drilling has proven strong ore grades near the surface and indications of deeper ore grade zones.

 

Mineralization

 

The main form of molybdenum mineralization that occurs within the orebody is molybdenite (MoS2 - molybdenum disulfide).  Much of the known molybdenite is distributed around two lobes and apophyses of the main quartz porphyry stock and within two separate mineralized zones.  A concentration of higher-grade mineralization, averaging 0.15% molybdenum, is present between the eastern and western mineral zones.  Referred to as the Mt. Hope Fault Zone, this area is approximately 1,300 feet in diameter and varies from 325 to 985 feet deep.  This zone will be the target of open pit mining in the first 32 years.  Lower grade ore will also be mined and stockpiled during the first 32 years and will be processed in the succeeding 12 years.

 

Exploration

 

Since acquiring access to the Mt. Hope Project, we have completed additional exploration drilling for molybdenum for the purposes of supporting our BFS and obtaining engineering information for items such as geotechnical design, hydrology, and condemnation for waste dumps and tailing ponds as well as infill drilling for ore calculation purposes.

 

The Mt. Hope property has been extensively drilled and all core and assay results are available to the Company.  Accordingly, this data has been used to analyze and quantify the mineral resource based on an extensive high quality database.  The drilling at the Mt. Hope Project has been predominately performed by utilizing diamond core methods, and some reverse circulation (“RC”) in areas of condemnation and water well drilling.  To date, 311 holes have been drilled into the property for a total of 357,177 feet of drilling; 234,402 feet of which is core, the remaining 122,775 feet is RC.

 

15



Table of Contents

 

Ore to Be Mined

 

The table below summarizes the ore grades we expect to mill under our BFS mine plans for Mt. Hope.

 

Mill Feed Ore Statistics

 

 

 

 

Average

 

 

 

 

 

 

 

Grade

 

Mo

 

Category

 

Ktons

 

Mo%

 

Recovery %

 

Ore in Years 1-5

 

110,346

 

0.103

 

87.7

 

Ore in Years 1-10

 

220,737

 

0.094

 

87.3

 

Ore in Years 1-20

 

439,195

 

0.086

 

86.2

 

 

The modeled pit, including the above mineralized material and waste, contains an estimated 2.7 billion tons of total material.  Based on these estimates, from the inception of production through year 32, the mill will process 702,953 thousand tons of ore at an average ore grade of 0.078%.  During this time period low-grade ore totaling 262,973 thousand tons with an average ore grade of 0.042% will be stockpiled for later feed into the mill from years 32 through 44.  Waste material totaling 1,741,815 thousand tons will also be mined and disposed of on site.  The total production is based on estimated life of mine and has a 0.034% Mo cutoff grade.

 

Mining

 

The Mt. Hope Project is planned for production by conventional large-scale, hardrock, open-pit mining methods.  The current mine plan provides for primary loading with a fleet of two electric cable shovels, one hydraulic shovel, and two front-end loaders.  The mine fleet is expected to include 24 240-ton trucks by the end of the first full year of production.  The Company anticipates engaging a contractor to perform approximately 10 months of pre-production stripping concurrent with the initial phases of construction of the Mt. Hope Project.

 

Ore will be hauled directly to the crusher at the southeast side of the pit.  Waste will be delivered to one of four waste sites located around the mine.  One low grade stockpile will be located to the east of the pit.  The low-grade material will be re-handled and processed through the plant following the initial 32 years of mining.  The planned storage of low-grade ores is 263 million tons at a grade of 0.042% Mo.

 

Process Overview

 

The process circuit will include:

 

·                                          Primary Crusher & Coarse Ore Stockpile—The primary crusher (60x89 superior gyratory) will be located adjacent to the pit and crushed ore will be fed to a 70,000 ton live capacity stockpile.

 

·                                          Semi-Autogenous Grinding (“SAG”) & Ball Mill Circuit—Ore will be reclaimed from the stockpile from up to four feeders and fed by conveyor to the SAG mill.  The design will allow for the addition of a pebble crusher.  Following the SAG mill, the ore will be ground to 80% passing 150 microns in the two ball mills at an average daily processing rate of 60,625 tons.

 

·                                          Flotation Circuit—Following the grinding circuit, the ore will be processed in a conventional flotation plant.  The molybdenum ore will be treated through two banks of rougher/scavenger flotation, one stage of first cleaners followed by regrind, and four additional stages of cleaner flotation.  Some molybdenum concentrates with higher levels of included metals will be treated through a concentrate leach facility to produce the cleaned, final molybdenum concentrate.  Metallurgical results have indicated that an estimated mill recovery of approximately 85.8% is achievable across grades ranging from 0.04% through 0.1% Mo with final concentrate grades of approximately 54% to 56% Mo.  The initial 32 years of higher-grade ores will achieve recoveries of about 87%.

 

·                                          Roaster Circuit—Molybdenum concentrate will be further processed in two multi-hearth roasters to produce technical grade molybdenum trioxide product.  The roasting facility will provide a fully integrated process.

 

16



Table of Contents

 

Tailing Facility

 

The proposed mining and processing operation is expected to produce approximately 22 million tons of tailing (including SO2 scrubber residue) per year.  Approximately 966 million tons of tailing will be produced under the current mine plan.  The Tailing Storage Facility layout provides for the construction of one tailing impoundment that will contain the first 30 plus years of operations.  A second facility is planned for the remaining years of the mine life.  Both tailing impoundments will be constructed with HDPE plastic liners to provide for greater groundwater protection.

 

Bankable Feasibility Study

 

On August 30, 2007, we completed the BFS, which established proven reserves totaling 189,675 thousand tons of ore at an average grade of 0.083% molybdenum and probable reserves totaling 776,251 thousand tons of ore at an average grade of 0.065% molybdenum summarized as follows:

 

Statement of Reserves and Mineralized Material

Units = Short Tons

 

Reserves

 

Cutoff Grade

 

Proven Reserves

 

Probable Reserves

 

Proven+Probable Reserves

 

K$Net/hr

 

%Mo Sulfide

 

Ktons

 

Mo 
Grade%

 

Ktons

 

Mo 
Grade%

 

Ktons

 

Mo Grade%

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

$

3.000

 

0.034

%

189,675

 

0.083

 

776,251

 

0.065

 

965,926

 

0.068

 

 

Additional Mineralized Material

 

Cutoff Grade

 

Measured

 

Indicated

 

Measured+Indicated

 

K$Net/hr

 

%Mo

 

Ktons

 

Mo 
Grade%

 

Ktons

 

Mo 
Grade%

 

Ktons

 

Mo Grade%

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

$

0.001

 

0.024

%

11,089

 

0.029

 

98,552

 

0.030

 

109,641

 

0.030

 

 

Footnotes to Statements of Reserves and Mineralized Material

 

The cutoff grades are determined by optimizing the net present value based on process costs combined with throughput estimates of recoverable molybdenum included in each phase of the mining and milling processes.  The derived income, based on assumed molybdenum prices, net of processing costs is calculated on a per ton basis and on a per hour milled basis and is expressed in units of thousands of dollars (“K$Net/hr”).

 

Mineralized material is tabulated at the cutoff grade of 0.024% Mo.  Breakeven cutoff covers the cost to mine and process the material.  The Moly cutoff grades in sulfide form are close approximations to K$Net/hr.

 

The final reserve pit design was based on a molybdenum price of $10/lb molybdenum in the saleable form of moly tri-oxide.  As of December 31, 2011, the approximate three year backward average price for molybdenum was $14.19/lb, according to Ryan’s Notes, a ferro-alloy industry news and pricing publication.  The spot price for molybdenum on the same date was approximately $13.40/lb, also according to Ryan’s Notes.  The pit design price is below the 3-year backward average and below current spot prices.

 

The reserve at Mt. Hope is based on a block model that utilized the statistical process of Ordinary Linear Kriging constrained by appropriate rock type and grade boundaries.  Base metal models that utilize these common techniques generally account for mining dilution and recovery so that additional factors are not required to be applied to the block model.

 

The metallurgical recovery applied to the determination of reserves was 90% in the flotation mill and 99.2% in the molybdenum roaster.  More detailed process testing and design work later in the feasibility study resulted in a revised average flotation recovery estimate of 85.8%.  This recovery difference is not material because the final open pit design is a practical plan with access roads and mine equipment working room.  The final design is consequently a conservative representation of the mathematical economic pit that was guided by the initial estimates.

 

17



Table of Contents

 

Capital Cost Estimates

 

Our current estimate of the initial capital cost estimate is $1,039 million.  Additionally, we estimate approximately $115 million in cash financial assurance requirements and pre-paid items, resulting in a total of $1,154 million.  Many of these cost estimates are based on 2009 constant dollars and are subject to cost inflation or deflation.  In the past several years, costs associated with capital expenditures have escalated on an industry-wide basis as a result of major factors beyond our control, including the prices of oil, steel and other commodities.  We anticipate updating the capital estimate during the second half of 2012 in conjunction with the expected restart of the Mt. Hope Project.  Furthermore, ongoing replacement and sustaining mine equipment and process plant capital over the expected 44-year operating life plus the three-year reclamation period is currently estimated to be approximately $642 million.  These amounts do not include financing costs or amounts necessary to fund operating working capital.  We expect that these cost estimates will continue to evolve over time based on changes in the industry-wide cost structure as well as changes in our operating strategies and initiatives for the project.  The Mt. Hope Project’s current anticipated capital requirements are broken down in the following table:

 

Estimated Capital Costs

 

$ Millions

 

Mining Equipment

 

$

134

 

Milling Equipment

 

$

176

 

Construction

 

$

347

 

Owners Costs, Pre-Stripping

 

$

169

 

Taxes, freight, spares

 

$

68

 

Engineering, Procurement, and Construction Management

 

$

59

 

Contingency

 

$

86

 

Total Capital

 

$

1,039

 

Financial Assurance and pre-paid items

 

$

115

 

Total Capital Requirement

 

$

1,154

 

Sustaining Capital (40+ years)

 

$

642

 

 

Pricing

 

The worldwide molybdenum price fluctuated between $5.33 per pound in 2003 to over $40.00 per pound in 2005 and traded in the mid-$30s per pound prior to October 2008, when prices fell from approximately $33.50 per pound to $7.70 per pound in April 2009 as a result of the global financial crisis.  Subsequent to April 2009, prices slowly rose finishing 2009 at $12.00 per pound and further increasing to finish 2010 at $16.40 per pound.  During 2011, prices traded in a relatively narrow range between $12.85 and $17.70 per pound, finishing the year at $13.40 per pound, according to Ryan’s Notes.  Since the beginning of 2012, prices have traded slightly higher and are currently trading at $14.70 per pound as of late February 2012.

 

In our BFS and for a portion of our financial evaluations, we use molybdenum prices prepared by an independent commodities research company, CPM Group.  Their research is a comprehensive look at both the supply and demand side of the molybdenum market.  Through their research, they forecast global growth rates for molybdenum for both supply and demand.  CPM Group continues to forecast prices in excess of current spot prices over the long-term.  In August 2011, CPM Group forecast that molybdenum prices would average $20.00 in 2012, $23.55 in 2013; $22.00 in 2014; $13.50 in 2015; $11.15 in 2016; $12.50 in 2017, $13.50 in 2018, $16.15 in 2019 and $17.20 thereafter.

 

Production

 

Production over the life of the project is estimated to be 1.1 billion pounds of saleable molybdenum on a 100% basis.  Production over the first full five years is estimated at 40 million pounds of molybdenum.  Direct operating costs for the Mt. Hope Project over the first full five years of operation are anticipated to average $5.29 per pound, using $80 per barrel oil equivalent energy costs, and CAS per pound over the first full five years of operation, including anticipated royalties calculated at $15 per pound molybdenum, are anticipated to average $6.00 per pound.  For each $10 change in per barrel oil costs, Mt. Hope’s anticipated direct operating cost changes approximately $0.10 per pound.  Life of mine CAS are estimated to be approximately $7.94 per pound of molybdenum at $80 per barrel oil, inclusive of anticipated royalty payments calculated at $15 per pound molybdenum.  These cost estimates are based on 2009 constant dollars and are subject to cost inflation or deflation.  In the past several years, operating costs in the mining industry have escalated on a world-wide

 

18



Table of Contents

 

basis as a result of major factors beyond our control, including the cost of energy and labor.  We anticipate updating these operating cost estimates later this year.

 

Reconciliation between CAS, a measure based on accounting principles generally accepted in the United States of America (“GAAP”), and direct operating costs, a non-GAAP measure, is provided in the table below.

 

Description

 

First Five Years

 

Life of Mine

 

Direct operating costs

 

$

5.29

 

$

7.13

 

Royalty payments (1)

 

.71

 

.81

 

Total

 

$

6.00

 

$

7.94

 

 


(1)         Royalty payments are a function of assumed molybdenum prices realized.

 

Description of the Liberty Property

 

On March 17, 2006, we purchased the Liberty Property, an approximately ten square mile property in Nye County, Nevada, including water rights, mineral and surface rights, buildings and certain equipment from High Desert Winds LLC (“High Desert”).  The property includes the former Hall molybdenum and copper deposit that was mined for molybdenum by open pit methods between 1982 and 1985 by Anaconda and between 1988 and 1991 by Cyprus.  Equatorial Tonopah, Inc. mined copper from 1999 to 2000 on this property, although their operations were in a separate open pit also located on the property.  Much of the molybdenum deposit was drilled but not developed or mined by these previous owners.  At closing, we paid High Desert a cash payment of $4.5 million for a portion of the property, and in November 2006, made an additional payment of $1.0 million for the remainder of the property.

 

On January 30, 2007, we purchased Equatorial Mining North America, Inc. and its two subsidiaries, which owned a 12% net smelter returns royalty on the Liberty Property, from Equatorial Mining Pty. Limited, effectively eliminating all third party royalties on the property.  The consideration paid for the Equatorial acquisition was $4.8 million with an additional deferred payment of $6.0 million due upon commencement of commercial operation of the property.  In connection with the transaction, we acquired $1.2 million in cash accounts and assumed all environmental liabilities on the reclaimed site.  Additionally in 2007, we purchased all outstanding mineral claims associated with this property that were not previously owned by us thus giving the Company 100% control over all mineral rights within the boundary of the property, as well as claims on BLM property adjacent to the patented grounds.

 

Since purchasing the Liberty Property, we completed two drilling programs that, combined with previous evaluation work performed by former owners, identified mineralization totaling 541.4 million tons with ore grades averaging 0.067% molybdenum and 0.08% copper.  We completed a pre-feasibility study on the Liberty Property in April 2008 that detailed initial capital and operating costs, anticipated mining and milling rates and permitting requirements.  On October 3, 2011 the Company released an updated NI 43-101 compliant resource estimate and on November 15, 2011 released a pre-feasibility study detailing updated resource estimates and project economics.  The completed report estimates molybdenum and copper reserves and resources, production, capital and operating cost parameters, along with project economics.  The Liberty Property is viewed by the Company as a follow-on project to the Mt. Hope Project that we intend to actively pursue following development of the Mt. Hope Project, and dependent on market conditions.

 

History

 

In 1955, Anaconda leased and optioned the Liberty molybdenum prospect and mine in order to evaluate extensive molybdenum and copper occurrences.  From 1956 through 1966, Anaconda explored or delineated molybdenum mineralization over an approximate one square mile area.  Drilling indicated extensive mineralization from the surface to a depth of approximately 2,000 feet.  Drilling delineated approximately 200 million tons of mineralization grading 0.091 percent molybdenum, which was included in a long term mining plan.  Mine construction began in 1979 with production from the Hall Mine starting in 1981.  Anaconda ceased operations in 1985 due to low metal prices.  Between 1982 and 1991, Anaconda and successor operator Cyprus Minerals mined a total of 50 million tons of ore grading 0.11 percent molybdenum.  No further molybdenum mining took place after 1991, leaving an estimated 150 million tons of un-mined ore at a grade of 0.09 percent molybdenum.

 

19



Table of Contents

 

A 100 million ton copper ore zone independent of the molybdenum was the subject of a copper leach operation by Equatorial between 1995 and 2002.  Approximately 10 million tons were mined before operations ceased in 2002.  The copper zone is not currently being evaluated.

 

The molybdenum mine open pit remains easily accessible for mining.  Various facilities and improvements continue to exist on the property that may be of future use for molybdenum operations including a power supply, water rights, water and well system, offices, truck and vehicle shops, thickening tanks, water and fuel tanks, roads and other structures.  All of the mobile equipment was removed from the property.  Much of the plant area was reclaimed after the 2002 closure with most of the crushing, conveying, grinding, concentrator equipment and other milling equipment being removed from the property.

 

Our combined purchases of the assets and mineral rights at the Liberty Property included all of the lands required for future operations and all of the mineral rights.  The initial years for a new molybdenum operation and mine on this property could be entirely on fee lands owned by us.  As a result, initial permitting is anticipated to be through state agencies, including the Nevada Department of Environmental Protection (“NDEP”).  There are minor BLM landholdings in the footprint of planned waste stockpiles and the open pit, and at some future time we will pursue acquisition of these lands or perform Federal National Environmental Policy Act (“NEPA”) evaluations to permit use of these lands.  Based on this and the project’s previous operations, we expect to have an expedited permitting schedule as compared to other greenfield start-up projects, such as Mt. Hope.

 

Geology

 

The ore body at the Liberty Property is geometrically displayed as a cylinder, roughly coincident with and draped across, the igneous contact of a Cretaceous quartz porphyry stock and the metamorphosed volcanic host rock.  The cylinder plunges -35° to the southeast.  Molybdenite occurs as selvages on stockwork quartz veins and on bedding planes and tensional shears in the country rock with the majority of the molybdenum resource located in the intrusive.  Host rocks consist of fine-grained volcaniclastic rocks, formerly identified as schists and quartzites, intruded by Cretaceous coarse-grained quartz-feldspar porphyry.  These are overlain by Tertiary volcanic rocks varying from rhyolitic-welded ash-flow tuffs to dacitic and basaltic lava flows.  Tertiary andesite dikes intrude the welded tuffs.

 

The Cretaceous quartz-feldspar porphyry is extensively altered by quartz-muscovite and K-spar flooding.  Internal textures are often obscured by overprinting alteration.

 

The deposit is crosscut and offset by a number of post mineral faults.  Major structural trends are north-south and east by northeast-west by southwest.

 

Molybdenum mineralization is concentrated in molybdenite, molybdenum di-sulfide, with lesser amounts of molybdenum oxide.  Copper is concentrated in a blanket of chalcocite above the oxidation boundary and in chalcopyrite below the oxide zone.  Pyrite is a common constituent of most of the ore body.

 

Environmental Investigation - Shoshone County, Idaho

 

The Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended (“CERCLA”), imposes strict, joint, and several liability on parties associated with releases or threats of releases of hazardous substances.  Liable parties include, among others, the current owners and operators of facilities at which hazardous substances were disposed or released into the environment and past owners and operators of properties who owned such properties at the time of such disposal or release.  This liability could include response costs for removing or remediating the release and damages to natural resources.  We are unaware of any reason why our undeveloped properties would currently give rise to any potential CERCLA liability.  We cannot predict the likelihood of future CERCLA liability with respect to our properties, or to surrounding areas that have been affected by historic mining operations.

 

Our mineral property holdings in Shoshone County, Idaho include lands contained in mining districts that have been designated as a “Superfund Site” pursuant to CERCLA.  This “Superfund Site” was established to investigate and remediate primarily the Bunker Hill properties of Smelterville, Idaho, a small portion of Shoshone County where a large smelter was located.  However, because of the extent of environmental impact caused by the historical mining in the mining districts, the Superfund Site covers the majority of Shoshone County including our Chicago-London and Little Pine Creek properties as well as many small towns located in Northern Idaho.  We have conducted a property environmental investigation of these properties, which revealed no evidence of material adverse environmental effects at either property.  We are unaware of any

 

20



Table of Contents

 

pending action or proceeding relating to any regulatory matters that would affect our financial position due to these inactive mining claims in Shoshone County.

 

Applicable Mining Laws

 

Mining in the State of Nevada is subject to federal and state law.  Three types of laws are of particular importance to the Mt. Hope Project: those affecting land ownership and mining rights; those regulating mining operations; and those relating to the environment.

 

The Mt. Hope Project is situated on lands owned by the United States (“federal lands”).  The LLC, as the owner or holder of the unpatented mining claims, has the right to conduct mining operations on the lands subject to the required operating permits and approvals, compliance with the terms and conditions of the Mt. Hope Lease, and compliance with applicable federal, state, and local laws, regulations and ordinances.  On federal lands, mining rights are governed by the General Mining Law of 1872, as amended, 30 U.S.C. UU 21-161 (various sections), which allows for the location of mining claims on certain federal lands upon the discovery of a valuable mineral deposit and on proper compliance with claim location requirements.

 

The operation of mines is governed by both federal and state regulatory programs.  The predominant non-environmental federal regulatory program affecting operation of the Mt. Hope Project is the mine safety regulations administered by the Mine Safety and Health Administration.  Additional federal laws, such as those governing the purchase, transport, storage or usage of explosives, and those governing communications systems, labor and taxes also apply.  State non-environmental regulatory programs affecting operations include the permitting programs for drinking water systems, sewage and septic systems, water rights appropriations, Department of Transportation, and dam safety (engineering design and monitoring).

 

Environmental regulations require various permits or approvals before any mining operations on the Mt. Hope Project can begin.  Federal environmental regulations are administered primarily by the BLM.  The Environmental Protection Agency (“EPA”) has delegated authority for the Clean Water Act and Clean Air Act to the State of Nevada.  The NDEP, therefore, has primacy for these programs and is responsible for administering the associated permits for the Mt. Hope Project.  The Bureau of Mining Regulations and Reclamation (“BMRR”) within NDEP administers the WPC and Reclamation permits.  The Bureau of Air Pollution Control (“BAPC”) within NDEP administers the Air Quality Permit.  The NDEP also administers the permit program for onsite landfills.  The Nevada Division of Wildlife administers the artificial industrial pond permit program.  Local laws and ordinances may also apply to such activities as waste disposal, road use and noise levels.  Both our Mt. Hope and Liberty properties will be subject to these various environmental laws and regulations.

 

Permitting

 

Permit Acquisition and Fundamental Environmental Permitting Considerations

 

We are working to obtain the required principal environmental operating permits for the Mt. Hope Project in anticipation of a possible construction start upon receipt of the permits and availability of financing for the project.  Baseline studies and data acquisition to support permitting were initiated in the fourth quarter of 2005.  Facility designs and operational plans have been refined as data was collected and reviewed to minimize environmental impacts and facilitate the permitting process.  The planned mining and processing operations are consistent with numerous other permitted projects in Nevada, in terms of methods, facility design, equipment, and related engineering plans.

 

Permitting Process Overview

 

The development, operation, closure and reclamation of mining projects in the United States require numerous notifications, permits, authorizations, and public agency decisions.  This section does not attempt to exhaustively identify all of the permits and authorizations that need to be granted, but instead focuses on those that are considered to be critical for project start-up.

 

Environmental Inventories

 

There are certain environmental evaluations that routinely must be completed in order to provide the information against which project impacts are measured.  Both the BLM and the NDEP have requirements to profile existing conditions and to evaluate what effects will result from implementing the Mt. Hope Project.

 

21



Table of Contents

 

Background information on geology, air quality, soils, biology, water resources, wildlife, vegetation, noise, visual resources, social and economic conditions, and cultural resources have been assembled and have been submitted to the appropriate regulatory agencies.

 

Mt. Hope Permitting Requirements

 

The Mt. Hope Project will require both federal and state permits before it can commence construction and operations.  Major permits required for the Mt. Hope Project include the ROD, a BLM issued permit, water appropriation permits from the Nevada Division of Water Resources, the WPC permit and reclamation permit from the NDEP—BMRR, and an AQP from the NDEP—BAPC.  NDEP—BAPC held a public meeting on the Company’s draft AQP on February 28, 2012 in Eureka, Nevada.  Applications for other time-critical state permits have been submitted for agency review and approval.  The LLC continues to develop and evolve the information supporting these permits based on agency review and feedback.  We believe these other major operating permits will be received on or prior to the effective date of the ROD.

 

Although we currently are targeting the effectiveness of the ROD and the receipt of all major operating permits to occur between June and September 2012, circumstances beyond our control, including reviewing agency delays or requests for additional information or studies, and appeals of the BLM decision, could cause the effective date of the ROD to be delayed.  The occurrence of any or a combination of these adverse circumstances may increase the estimated costs of development, require us to obtain additional interim financing, and/or delay our ability to obtain project financing or other significant financing.  A delay in the ROD or the receipt of major operating permits also affects the satisfaction of the ROD Contribution Conditions as well as the conditions to Tranche 2 of Hanlong’s investment in our common stock.

 

Plan of Operations Approval—Bureau of Land Management

 

The BLM is preparing an EIS analyzing the environmental impacts of the Mt. Hope Project and alternatives in accordance with the NEPA.  Upon completion and approval of the EIS, the BLM will issue the ROD for the Mt. Hope Project.  The ROD will be effective on the date the BLM has recorded its decision to approve the EIS and POO for the Mt. Hope Project.  We currently expect to receive the ROD between June and September 2012.  In September 2006, the BLM determined that the POO met the regulatory requirements with respect to completeness and comprehensiveness.  Since that time, baseline technical reports have been submitted and approved by the BLM and POO updates have been submitted to accommodate additional detail based on progression of project design.  The BLM has also been working with its environmental firm to complete the EIS.  The DEIS was published in the Federal Register on December 2, 2011.  The public comment period for the DEIS commenced at its publication on December 2, 2011 and ended on March 1, 2012.

 

Potential environmental issues associated with the proposed operations have been identified and mitigation measures have been developed to minimize potential impacts.  These actions are anticipated to support permitting efforts and to reduce potential environmental liability, and promote good community and social responsibility.

 

Issues of concern are primarily related to geochemistry and the associated potential for acid generation from waste rock, the water quality in the post-mining pit lake, and the potential mobilization of constituents in the tailings.  Other significant potential impacts include effects of groundwater pumping on existing water rights and/or surface water flows, air emissions, reduction of wildlife habitat, including a federally listed sensitive species, and the socioeconomic impact to the community of Eureka.  Extensive laboratory testing has been conducted to fully evaluate the geochemistry of all material types that will be mined.  The waste rock disposal facilities and tailing impoundment designs incorporate components to minimize potential impacts, consistent with accepted and demonstrated industry practices.  Hydrological and geochemical computer modeling predicts that the post-mining pit lake water quality will not pose a threat to wildlife and will therefore not require treatment. Air emissions will be reduced by using control technology and leading industry practices.  A detailed reclamation plan has been developed to re-establish post-mining land uses, including wildlife habitat.  Other resource-specific mitigation plans have been developed, including those for wild horses and burros, cultural resources, the Pony Express Trail, sage grouse habitat, water resources, bats, and minimizing fugitive dust.  Environmental regulations related to reclamation require that the cost for a third party contractor to perform reclamation activities on the mine site be estimated.  This reclamation cost estimate, once approved by BLM and the NDEP will become the basis for the required financial assurance amount.  The LLC will be required to post a financial instrument in addition to the $0.8 million currently held by the BLM upon receiving the ROD to provide a guarantee that this amount will be available to BLM and NDEP for use in conducting reclamation should we become insolvent or default on our reclamation obligations.  Although the Reclamation Permit is administered by the NDEP-BMRR, BLM review is required and the reclamation cost estimate must be approved in conjunction with approval of the POO.  To accommodate this process, the reclamation permit application and reclamation cost estimate is included as part of the POO submittal.

 

22



Table of Contents

 

A phased reclamation cost estimate will address the anticipated activities for a three-year period from the point of POO approval.  The financial assurance estimate must then be recalculated every three years to include the current activities and those activities anticipated to be completed during the subsequent three-year period.  Preliminary estimates indicate that the project reclamation financial assurance requirements during the first three-year period will be approximately $71.9 million, and could be met with financial instruments other than cash.  Financial guarantees held by the BLM will increase with every three-year update in conjunction with the growth of the waste rock pile and the tailing impoundments.  It is estimated that financial assurance requirements could reach $171.8 million at the anticipated end of the project (year 44), assuming no concurrent reclamation activities occur.

 

Water Appropriation Permits—Nevada Division of Water Resources

 

The Mt. Hope Project is primarily centered between two water basins:  the Kobeh Valley Basin and the Diamond Valley Basin.  Operation of the Mt. hope Project is expected to require 7,000 gallons per minute of fresh water that will be sourced from wells located in Kobeh Valley, west of the Mt. Hope Project.  The Company has purchased from existing water rights holders essentially all available water rights in the Kobeh Valley Basin, totaling more than 16,000 acre feet annually.

 

In addition to working to complete the EIS, we are working to finalize the transfer of water rights to mining use.  In March 2009 we were granted our water applications in a Ruling by the State Engineer. However, that Ruling was successfully appealed in April 2010 in the NDC, remanding the matter for another hearing by the State Engineer.

 

On July 15, 2011, the State Engineer issued a second Ruling granting the Company’s water right applications.  In August 2011, Eureka County and two other parties comprised of three individual water rights holders in Diamond Valley and one in Kobeh Valley, filed Petitions and Amended and Supplemental Petitions (“Petitions”) with the NDC appealing the second Ruling of the State Engineer.  We continue to anticipate a favorable NDC decision, upholding the State Engineer’s second Ruling.  The appeal hearing is set for April 3, 2012 before the NDC.  A decision by the NDC is expected in mid-2012, although the NDC is not required to act under any specified timeline.  The appeal does not prevent the State Engineer from issuing the permits and as such, the State Engineer completed issuance of all permits on December 14, 2011 and certain amended permits on January 4, 2012 subject to the second Ruling.  The water will become available for consumptive use following the State Engineer’s approval of the Company’s Monitoring, Management and Mitigation Plan (“3M Plan”), developed with the input and cooperation of Eureka County. The Company is continuing to work with the State Engineer and Eureka County following our prior submissions, to finalize the 3M Plan and we anticipate the State Engineer will approve the 3M Plan prior to commencement of construction, in the second half of 2012.

 

Water Pollution Control Permit—Nevada Division of Environmental Protection—Bureau of Mining Regulation and Reclamation

 

The BMRR administers the programs for the WPC Permit and the Reclamation Permit, both of which are required for the Mt. Hope Project.  The WPC Permit program specifies design criteria for containment of process fluids and mandates development of monitoring, operational, and closure plans.  We believe that the standards for facility design are well-defined and we do not anticipate that the WPC permitting process will be delayed by technical issues.  In addition, the permit review process is well-defined, including timelines, and is codified in regulation.  The permit application was originally submitted in the third quarter of 2008.  We anticipate receiving the WPC Permit close to the BLM’s issuance of the ROD.

 

Air Quality Permit—Nevada Division of Environmental Protection—Bureau of Air Quality

 

Prior to the commencement of construction activities and in conjunction with facility operations, an AQP will be necessary.  The Nevada BAPC regulations categorize permit types as Class 1 or Class 2, based on the estimated emissions amounts.  The Mt. Hope Project is subject to a Class 2 permit (smaller emissions) based on emissions estimates.  The permit application included an emissions inventory and dispersion modeling to demonstrate that emissions from the project will not exceed established air quality standards.  Emissions are primarily associated with the crush/grind circuit (particulate matter) and the roaster (sulfur oxides).  Roaster emissions will be controlled with a 99.7% estimated removal efficiency for sulfur oxides. The permit application was originally submitted in the third quarter of 2008 and has been subsequently revised to address BAPC comments.  NDEP has issued a draft permit for the project and made the draft permit available for public review and comment.  At the request of Eureka County, NDEP scheduled a hearing in Eureka on February 28, 2012.  We anticipate receiving the permit close to the BLM’s issuance of the ROD.

 

23



Table of Contents

 

Liberty Property Permitting Requirements

 

We anticipate that the permitting schedule for the Liberty Property could be shorter than for the Mt. Hope Project, due to a relatively shorter permitting process under Nevada State regulations as opposed to the Federal NEPA process.  We control over 14,000 acres, including 5,054 acres of fee land, 946 acres of patented lode claims, 63 acres of patented mill site claims and 7,984 acres of unpatented lode claims.  Our ownership of the assets and mineral rights at the Liberty Property include most of the lands required for future operations and all of the mineral rights. Thus, we are evaluating the option of initiating a new molybdenum mine and ore processing operation completely on lands owned by us.  Based on the pre-feasibility study completed in November 2011, the initial three years for a new molybdenum operation and mine on this property will be completely on fee owned by us.  As a result, construction and initial production could occur simultaneously with federal permitting efforts.  State permits, including the water pollution control, reclamation and air quality permits comparable to those described in previous sections, would be required for the Liberty Property site and the level of analysis and time required is anticipated to be consistent with those described for the Mt. Hope Project.

 

In addition to land ownership, two other factors distinguish the Liberty property from Mt. Hope with respect to environmental permitting.  First, water consumption is not as significant an issue at Liberty.  Unlike Mt. Hope, the areas surrounding Liberty are not extensively irrigated.  In addition, we own significant water rights at the Liberty site and have water wells in place.  Second, the area has been mined previously which has resulted in significant surface disturbance.  By conducting exploration drilling on pre-existing disturbance to the extent possible, the amount of disturbance created by exploration drilling is greatly reduced, and permitting requirements to support exploration are reduced.  Furthermore, there is extensive environmental information developed to support permitting of the previous mine operation.  We anticipate that this information can be used to streamline the permitting process for us by reducing the amount of baseline studies and other technical information that must be developed.

 

Other United States Regulatory Matters

 

The Resource Conservation and Recovery Act (“RCRA”) and related state laws regulate generation, transportation, treatment, storage, or disposal of hazardous or solid wastes associated with certain mining-related activities.  RCRA also includes corrective action provisions and enforcement mechanisms, including inspections and fines for non-compliance.

 

Mining operations may produce air emissions, including dust and other air pollutants, from stationary equipment, such as crushers and storage facilities, and from mobile sources such as trucks and heavy construction equipment.  All of these sources are subject to review, monitoring, permitting, and/or control requirements under the federal Clean Air Act and related state air quality laws.  Air quality permitting rules may impose limitations on our production levels or create additional capital expenditures in order to comply with the permitting conditions.

 

Under the federal Clean Water Act and delegated state water-quality programs, point-source discharges into “Waters of the State” are regulated by the National Pollution Discharge Elimination System program, while Section 404 of the Clean Water Act regulates the discharge of dredge and fill material into “Waters of the United States,” including wetlands.  Stormwater discharges also are regulated and permitted under that statute.  All of those programs may impose permitting and other requirements on our operations.

 

NEPA requires an assessment of the environmental impacts of “major” federal actions.  The “federal action” requirement can be satisfied if the project involves federal land or if the federal government provides financing or permitting approvals.  NEPA does not establish any substantive standards; it merely requires the analysis of any potential impact.  The scope of the assessment process depends on the size of the project.  An EA may be adequate for smaller projects.  An EIS, which is much more detailed and broader in scope than an EA, is required for larger projects.  NEPA compliance requirements for any of our proposed projects could result in additional costs or delays.

 

The Endangered Species Act (“ESA”) is administered by the U.S. Department of Interior’s U.S. Fish and Wildlife Service (“USFWS”).  The purpose of the ESA is to conserve and recover listed endangered and threatened species and their habitat.  Under the ESA, “endangered” means that a species is in danger of extinction throughout all or a significant portion of its range.  “Threatened” means that a species is likely to become endangered within the foreseeable future.  Under the ESA, it is unlawful to “take” a listed species, which can include harassing or harming members of such species or significantly modifying their habitat.  We conduct wildlife and plant inventories required by regulatory agencies prior to initiating exploration or mining project permitting.  We currently are unaware of any endangered species issues at any of our projects.  A threatened species occurs in limited segments of two creeks approximately 10 miles to the north of the proposed well field for the Mt. Hope Project.  Although hydrologic modeling predicts no impacts to these stream segments,

 

24



Table of Contents

 

consultation with the USFWS was required.  Future identification of endangered species or habitat in our project areas may delay or adversely affect our operations.

 

We are committed to fulfilling or exceeding our requirements under applicable environmental laws and regulations.  These laws and regulations are continually changing and, as a general matter, are becoming more restrictive.  Our policy is to conduct our business in a manner that strives to safeguard public health and mitigates the environmental effects of our business activities.  To comply with these laws and regulations, we have made, and in the future may be required to make, capital and operating expenditures.

 

ITEM 1A. RISK FACTORS

 

You should carefully consider the risks described below and elsewhere in this report, which could materially and adversely affect our business, results of operations or financial condition.  If any of the following risks actually occurs, the market price of our common stock would likely decline.  The risks and uncertainties we have described below, however, are not the only ones we face.  Additional risks and uncertainties not presently known to us or that we currently deem immaterial may also affect our operations.

 

Our investors may lose their entire investment in our securities

 

An investment in our securities is speculative and the price of our securities has been and will likely continue to be volatile.  Only investors who are experienced in high risk investments and who can afford to lose their entire investment should consider an investment in our securities.

 

Our profitability depends largely on the success of the Mt. Hope Project, the failure of which would have a material adverse effect on our financial condition

 

We are focused primarily on the development of the Mt. Hope Project.  Accordingly, our profitability depends largely upon the successful development and operation of this project.  We are currently incurring losses and we expect to continue to incur losses until sometime after molybdenum production begins at the Mt. Hope Project.  The LLC may never achieve production at the Mt. Hope Project and may never be profitable even if production is achieved.  The failure to successfully develop the Mt. Hope Project would have a material adverse effect on our financial condition, results of operations and cash flows.  Even if the LLC is successful in achieving production, an interruption in operations at the Mt. Hope Project that prevents the LLC from extracting ore from the Mt. Hope Project for any reason would have a material adverse impact on our business.

 

If certain conditions are not met under the Hanlong transaction documents, our ability to begin construction of the Mt. Hope Project could be delayed further

 

The additional investments by Hanlong in our common stock and the related financing with a Chinese bank and the molybdenum supply agreement are subject to a number of conditions precedent, including receipt by us of required governmental permits, approval by Chinese government authorities for investment in us by Hanlong and loans expected to be made by a Chinese bank, and negotiation of acceptable loan terms with that bank.  These conditions may not be met, in which case our ability to begin construction of the Mt. Hope Project could be delayed further while we attempt to obtain alternative financing.  We may not be successful in obtaining acceptable financing since the current credit markets are difficult for development stage companies.  In addition, we may be subject to financial penalties under the Hanlong transaction if certain milestones are not met in accordance with the agreement as discussed in “The Securities Purchase Agreement — Break Fees” above.

 

We may require and may not be able to obtain substantial additional financing in order to fund the operations of the Company and the LLC and if we are successful in raising additional capital, it may have dilutive and other adverse effects on our stockholders

 

If the actual costs to complete the development of the Mt. Hope Project are significantly higher than we expect, we may not have enough funds to cover these costs and we may not be able to obtain other sources of financing.  The failure to obtain all necessary financing would prevent the LLC from achieving production at the Mt. Hope Project and impede our ability to become profitable.  Our financing plan assumes that POS-Minerals will make their required contributions as outlined in the LLC Agreement.  We may not be able to obtain additional financing necessary for achieving production at the Mt. Hope Project if these contributions are not made.

 

25



Table of Contents

 

We continue to review the technical merits of the Liberty Property, which will also require significant additional capital to permit and/or commence mining activities at this property.  We may not be able to obtain the financing necessary to develop the Liberty Property should we decide to do so.

 

If additional financing is not available, or available only on terms that are not acceptable to us, we may be unable to fund the development and expansion of our business, attract and retain qualified personnel, take advantage of business opportunities or respond to competitive pressures.  Any of these events may harm our business.  Also, if we raise funds by issuing additional shares of our common stock, preferred stock, debt securities convertible into preferred or common stock, or a sale of additional minority interests in our assets, our existing stockholders will experience dilution, which may be significant, to their ownership interest in us or our assets.  If we raise funds by issuing shares of a different class of stock other than our common stock or by issuing debt, the holders of such different classes of stock or debt securities may have rights senior to the rights of the holders of our common stock.

 

Our inability to satisfy certain conditions under the LLC Agreement required to be satisfied by December 31, 2011 may require the LLC to pay a penalty to our LLC partner, POS-Minerals

 

Commercial production at the Mt. Hope Project did not occur by December 31, 2011.  If POS-Minerals has made its additional $56.0 million contribution within 15 days after the ROD Contribution Date, the LLC Agreement with POS-Minerals requires the LLC to make a distribution to POS-Minerals of up to $36.0 million, 20 days after the commencement of commercial production, as defined by the LLC Agreement, as a penalty (“Penalty”) for the delay in commencement of production, with no corresponding reduction in POS-Minerals’ ownership interest in the LLC.

 

The LLC may not be able to satisfy the ROD Contribution Conditions at all.  The satisfaction of the ROD Contribution Conditions are subject to a number of factors that are beyond our control, including the issuance of the ROD by the BLM and the ability of third parties to initiate administrative or judicial appeals after the issuance of the ROD.  In addition, the Mt. Hope Project did not achieve commercial production by December 31, 2011, and may not achieve commercial production at all.  As a result, we expect that we will be required to pay the Penalty if POS-Minerals makes its additional $56.0 million contribution.

 

Because POS-Minerals has elected to retain its 20% interest in the LLC and we anticipate being required to make the Penalty payment to POS-Minerals, we may not be able to provide sufficient funding to the LLC to develop the Mt. Hope Project, which could have a material adverse effect on our financial condition, results of operations and cash flows.  In addition, in such cases we may be required to seek additional capital, which may not be available to us on commercially reasonable terms, if at all.  Any such additional financing could dilute or otherwise adversely impact the rights of our existing stockholders.

 

The LLC Agreement gives POS-Minerals the right to approve certain major decisions regarding the Mt. Hope Project

 

The LLC Agreement requires unanimous approval of the members for certain major decisions regarding the Mt. Hope Project.  This effectively provides either member with a veto right over the specified decisions.  These decisions include:

 

·                  Approval of the operations to be conducted and objectives to be accomplished by the Mt. Hope Project (“Program and Budget”);

 

·                  Approval of the budget for costs to be incurred by the LLC and the schedule of cash capital contributions to be made to the LLC (“Budget”);

 

·                  Approval of cost overruns in excess of 15% of the approved Program and Budget;

 

·                  Approval of an expansion or contraction of the average tons per day(“ tpd”) planned of 20% or more from the relevant tpd throughput schedule in the BFS;

 

·                  Approval of the LLC’s acquisition or disposition of significant real property, water rights or real estate assets;

 

·                  Approval of the incurrence of indebtedness by the LLC that requires (1) an asset of the LLC to be pledged as security, (2) the pledge of a membership interest in the LLC, or (3) a guaranty by either the Company or POS-

 

26



Table of Contents

 

Minerals, other than in each instance a purchase money security interest or other security interest in the LLC to finance the acquisition or lease of equipment; and

 

·                  Approval of the issuance by the LLC of an ownership interest to any person other than Nevada Moly or POS-Minerals.

 

The requirement that certain decisions be approved by POS-Minerals may make it more difficult for our stockholders to benefit from certain decisions or transactions that we would otherwise cause the LLC to make if they are opposed by POS-Minerals.

 

Fluctuations in the market price of molybdenum could adversely affect the value of our company and our securities

 

The profitability of our mining operations will be influenced by the market price of the metals we mine.  The market prices of metals such as molybdenum fluctuate widely and are affected by numerous factors including those beyond the control of any mining company.  These factors include fluctuations with respect to the rate of inflation, the exchange rates of the U.S. dollar and other currencies, interest rates, global or regional political and economic conditions and banking crises, global and regional demand, production costs in major molybdenum producing areas, and a number of other factors.  Sustained periods of low molybdenum prices would adversely impact our revenues, profits, and cash flows.  In particular, a sustained low molybdenum price could:

 

·                  Cause a continued delay and suspension of our development activities and, ultimately, mining operations at our Mt. Hope Project, if such operations become uneconomic at the then-prevailing molybdenum price;

 

·                  Prevent us from fulfilling our obligations under our agreements or under our permits and licenses which could cause us to lose our interests in, or be forced to sell our properties; and

 

·                  Have a continued negative impact on the availability of financing to us.

 

Furthermore, the need to reassess the feasibility of any of our projects if molybdenum prices were to significantly decline could cause substantial delays.  Mineral reserve calculations and life-of-mine plans using lower molybdenum prices could result in reduced estimates of mineral reserves and in material write-downs of our investment in mining properties and increased amortization, reclamation and closure charges.

 

The volatility in metals prices is illustrated by the quarterly average price range from January 2002 through February 2012 for molybdenum:  $2.73 - $35.37 per pound.  Average molybdenum prices are quoted in Platt’s Metals Week.  After a period of high, sustained molybdenum prices in 2004 through September 2008, where the price of molybdenum averaged $27.34 per pound, the price of molybdenum fell to approximately $7.70 per pound in April 2009.  Although we estimate the Mt. Hope Project’s average cost of production over the first five years to be approximately $6.00 per pound, a sustained period of lower molybdenum prices would have material negative impacts on the Company’s profitability.

 

Our profitability is subject to demand for molybdenum, and any decrease in that demand, or increase in the world’s supply, could adversely affect our results of operations

 

Molybdenum is used primarily in the steel industry.  The demand for molybdenum from the steel industry and other industries was extremely robust through the third quarter of 2008, primarily fueled by growth in Asia and other developing countries.  Beginning in the fourth quarter of 2008, the global financial crisis forced steel companies to substantially reduce their production levels with a corresponding reduction in the consumption of molybdenum, which contributed to the decline in the price of molybdenum.  Demand growth in 2011 has promoted a gradual increase in the price of molybdenum.  However, sustained low molybdenum demand resulting from a prolonged global financial crisis may cause prolonged periods of low molybdenum prices ultimately resulting in a continued suspension of our development or, in the future, a suspension of our mining operations at our Mt. Hope Project.

 

A sustained significant increase in molybdenum supply could also adversely affect our results.  The CPM Group estimate that during the next five years a total of 201.3 million annual pounds of production could be added to the supply of molybdenum (including 40 million of supply from our Mt. Hope Project).  In the event demand for molybdenum does not increase to consume the potential additional production, the price for molybdenum may be adversely affected.

 

27



Table of Contents

 

We are exposed to counter party risk, which may adversely affect our results of operations

 

The off-take agreements the Company has completed including contracts with APERAM, SeAH Besteel, Sojitz, and Hanlong contain provisions allowing for the sale of molybdenum at certain floor prices, or higher, over the life of the five year agreements.  During the past 18 months there have been periods where the spot molybdenum prices fell below the inflation-adjusted floor prices in the contracts.  During these time periods all four contracts would have provided for the Company to sell molybdenum at above-spot prices.  In the event that our contract parties choose not to honor their contractual obligations, our profitability may be adversely impacted.

 

We may not be able to obtain or renew licenses, rights and permits required to develop or operate our mines, or we may encounter environmental conditions or requirements that would adversely affect our business

 

In the ordinary course of business, mining companies are required to seek governmental permits for expansion of existing operations or for the commencement of new operations. The LLC will be required to obtain a ROD from the BLM authorizing implementation of the Mt. Hope Project POO.  This approval can be obtained only after successful completion of the process of environmental evaluation, which incorporates substantial public comment.  The LLC will also need to obtain various state and federal permits including water protection, air quality, water rights and reclamation permits.  In addition to requiring permits for the development of the Mt. Hope Project, we will need to obtain and modify various mining and environmental permits during the life of the project.  Obtaining, modifying, and renewing the necessary governmental permits is a complex and time-consuming process involving numerous jurisdictions and often involving public hearings and substantial expenditures.  The duration and success of our efforts to obtain, modify or renew permits will be contingent upon many variables, some of which are not within our control.  Increased costs or delays could occur, depending on the nature of the activity to be permitted and the interpretation of applicable requirements implemented by the permitting authority.  All necessary permits may not be obtained and, if obtained, may not be renewed, or the costs involved in each case may exceed those that we previously estimated.  It is possible that the costs and delays associated with compliance with such standards and regulations could become such that we would not proceed with the development or operation of the Mt. Hope Project.

 

The development of the Mt. Hope Project may be delayed, which could result in increased costs or an inability to complete its development

 

The LLC may experience delays in developing the Mt. Hope Project.  These could increase its development costs, affect its economic viability, or prevent us from completing its development.  The timing of development of the Mt. Hope Project depends on many factors, some of which are beyond our and the LLC’s control, including:

 

·                  Timely issuance of permits and licenses;

 

·                  Timely availability of equipment;

 

·                  Continued appeal or unfavorable order concerning the water rights ruling, 3M plan, or permits;

 

·                  Sustained low prices for molybdenum;

 

·                  Acquisition of surface land and easement rights required to develop and operate the project;

 

·                  Completion of advanced engineering;

 

·                  Timely execution of the remaining portions of the Hanlong transaction;

 

·                  Timely availability of the Term Loan; and

 

·                  Construction of the project.

 

In addition, factors such as sustained low prices of molybdenum and volatility in foreign exchange or interest rates, as well as international political unrest, could adversely affect our ability to obtain adequate financing to fund the development of the project on a timely basis.  Any delays caused by our inability to raise capital when needed may lead to the cancellation or extension of, or defaults under, agreements with equipment manufacturers or a need to sell equipment already purchased, any of which may adversely impact the Mt. Hope Project timeline.  Additionally, delays to the Mt. Hope Project

 

28



Table of Contents

 

schedule have consequences with regard to our LLC agreement with POS-Minerals, including potential claims by POS-Minerals, which may serve to increase our capital obligations and further enhance this risk factor.

 

Our mineralization and reserve estimates are uncertain, and any material inaccuracies in those estimates could adversely affect the value of our mineral reserves

 

There are numerous uncertainties inherent in estimating mineralization and reserves, including many factors beyond our control.  The estimation of mineralization and reserves is a subjective process and the accuracy of any such estimates is a function of the quality of available data and of engineering and geological interpretation and judgment.  Results of drilling, metallurgical testing, production, and the evaluation of mine plans subsequent to the date of any estimate may justify revision of such estimates.  The volume and grade of mineralization and reserves recovered and rates of production may be less than anticipated.  Assumptions about prices are subject to greater uncertainty and metals prices have fluctuated widely in the past.  Further declines in the market price of molybdenum and copper may render mineralization and reserves containing relatively lower grades of ore uneconomic to exploit, which may materially and adversely impact our reserve and mineralization estimates at our projects.  Changes in operating and capital costs and other factors including, but not limited to, short-term operating factors such as the need for sequential development of ore bodies and the processing of new or different ore grades, may also materially and adversely affect mineralization and reserves.

 

Any material inaccuracies in our production estimates could adversely affect our results of operations

 

We have prepared estimates of future molybdenum production.  We or the LLC may never achieve these production estimates or any production at all.  Our production estimates depend on, among other things:

 

·                  The accuracy of our mineralization and reserves estimates;

 

·                  The accuracy of assumptions regarding ore grades and recovery rates;

 

·                  Ground conditions and physical characteristics of the mineralization, such as hardness and the presence or absence of particular metallurgical characteristics;

 

·                  The accuracy of estimated rates and costs of mining and processing; and

 

·                  The ability to obtain all permits and construct a processing facility at Mt. Hope.

 

Our actual production may vary from our estimates if any of our assumptions prove to be incorrect.  With respect to the Mt. Hope Project, we do not have the benefit of actual mining and production experience in verifying our estimates, which increases the likelihood that actual production results will vary from the estimates.

 

Mining is inherently dangerous and subject to conditions or events beyond our control, and any operating hazards could have a material adverse effect on our business

 

Mining at the Mt. Hope Project will involve the potential for various types of risks and hazards, including: environmental hazards, industrial accidents, metallurgical and other processing problems, unusual or unexpected rock formations, structure cave-in or slides, flooding, fires, and interruption due to inclement or hazardous weather conditions.

 

These risks could result in damage to, or destruction of, mineral properties, production facilities or other properties, personal injury or death, environmental damage, delays in mining, increased production costs, monetary losses, and possible legal liability.  We may not be able to obtain insurance to cover these risks at economically feasible premiums and some types of insurance may be unavailable or too expensive to maintain.  We may suffer a material adverse effect on our business and the value of our securities may decline if we incur losses related to any significant events that are not covered by our insurance policies.

 

Our operations make us susceptible to environmental liabilities that could have a material adverse effect on us

 

Mining is subject to potential risks and liabilities associated with the potential pollution of the environment and the necessary disposal of mining waste products occurring as a result of mineral exploration and production.  Insurance against environmental risk (including potential liability for pollution or other hazards as a result of the disposal of waste products occurring from exploration and production) is not generally available to us or the LLC (or to other companies in the minerals

 

29



Table of Contents

 

industry) at a reasonable price.  To the extent that we become subject to environmental liabilities, the satisfaction of any such liabilities would reduce funds otherwise available to us and could have a material adverse effect on us.  Laws and regulations intended to ensure the protection of the environment are constantly changing, and are generally becoming more restrictive.

 

Legal title to the properties in which we have an interest may be challenged, which could result in the loss of our rights in those properties

 

The ownership and validity, or title, of unpatented mining claims are often uncertain and may be contested.  A successful claim contesting our title or interest to a property or, in the case of the Mt. Hope Project, the landowner’s title or interest to such property could cause us and/or the LLC to lose the rights to mine that property.  In addition, the success of such a claimant could result in our not being compensated for our prior expenditures relating to the property.

 

Climate change and climate change legislation or regulations may adversely impact General Moly’s planned future operations

 

Energy is anticipated to be a significant input in General Moly’s operations.  A number of governmental bodies have introduced or are contemplating legislative and regulatory change in response to the possible impacts of climate change. The United States (“U.S.”) Congress and several U.S. States have initiated legislation regarding climate change that could affect energy prices and demand.  In December 2009, the U.S. EPA issued an endangerment finding under the U.S. Clean Air Act indicating that current and projected concentrations of certain mixed greenhouse gases in the atmosphere, including carbon dioxide, threaten the public health and welfare.  It is possible that proposed regulation may be promulgated in the United States to address the concerns raised by the endangerment finding.

 

Legislation and increased regulation regarding climate change could impose increased costs on us, our partners and our suppliers, including increased energy, capital equipment, environmental monitoring and reporting and other costs to comply with such regulations.  Until the timing, scope and extent of any future regulation becomes known, we cannot predict the effect on our financial condition, financial position, results of operations and ability to compare.

 

The possible physical impacts of climate change on the Company’s planned future operations are highly uncertain and would be particular to the geographic circumstances in the area in which we operate. These may include changes in rainfall, storm patterns and intensities, shortages of water or other natural resources, changing sea levels, and changing temperatures. These effects may adversely impact the cost, production and financial performance of General Moly’s planned future operations.

 

Mineral exploration and mining activities require compliance with a broad range of laws and regulations, and compliance with or violation of these laws and regulations may be costly

 

Mining operations and exploration activities are subject to federal, state, and local laws and regulations governing prospecting, development, mining, production, exports, taxes, labor standards, occupational health and safety, waste disposal, toxic substances, land use, environmental protection, reclamation obligations, and mine safety.  In order to comply with applicable laws and regulations, we may be required to make capital and operating expenditures or to close an operation until a particular problem is remedied.  In addition, if our activities violate any such laws and regulations, we may be required to compensate those suffering loss or damage, and may be fined if convicted of an offense under such legislation.  We may also incur additional expenses and our projects may be delayed as a result of changes and amendments to such laws and regulations, including changes in local, state, and federal taxation.

 

Land reclamation requirements for exploration properties may be burdensome, may divert funds from our exploration programs and could have an adverse effect on our financial condition

 

Although variable, depending on location and the governing authority, land reclamation requirements are generally imposed on mineral exploration companies, as well as companies with mining operations, in order to minimize long term effects of land disturbance.  Reclamation may include requirements to control dispersion of potentially deleterious effluents and to reasonably re-establish pre-disturbance landforms and vegetation.  In order to carry out reclamation obligations imposed on us in connection with our mineral exploration, we and the LLC must allocate financial resources that might otherwise be spent on further exploration programs.  Such costs could also have an adverse effect on our financial condition.

 

30



Table of Contents

 

Non-compliance with our Mt. Hope Lease could result in loss of the LLC’s rights to develop the Mt. Hope Project and may adversely affect our business

 

The LLC leases the Mt. Hope Project from MHMI under the Mt. Hope Lease.  Failure to comply with the terms of the Mt. Hope Lease (which principally require us to make prescribed payments on or before certain prescribed dates) could result in loss of the LLC’s rights to develop the Mt. Hope Project.  Any loss of rights under the Mt. Hope Lease would have a material adverse effect on us and our ability to generate revenues.

 

Our ability to operate our Company effectively could be impaired if we lose key personnel or if we are not able to attract and retain the additional personnel we will need to develop any of our projects, including the Mt. Hope Project

 

We are a small company with a limited operating history and relatively few employees.  The development of any of our proposed projects, including the Mt. Hope Project, will place substantial demands on us.  We depend on the services of key executives and a small number of personnel, including our Chief Executive Officer, Chief Financial Officer, Chief Operating Officer, Corporate Counsel and Vice President of Human Resources, Mt. Hope General Manager, Controller and Treasurer, and Director of Environmental and Permitting.  We will be required to recruit additional personnel and to train, motivate and manage these new employees.  The number of persons skilled in the development and operation of mining properties is limited and significant competition exists for these individuals.  We may not be able to employ key personnel or to attract and retain qualified personnel in the future.  We do not maintain “key person” life insurance to cover our executive officers.  Due to the relatively small size of our company, the loss of any of our key employees or our failure to attract and retain key personnel may delay or otherwise adversely affect the development of the Mt. Hope Project, which could have a material adverse effect on our business.

 

We rely on independent contractors and experts and technical and operational service providers over whom we may have limited control

 

Because we are a small development stage company, we rely on independent contractors to assist us with technical assistance and services, contracting and procurement and other matters, including the services of geologists, attorneys, engineers and others.  Our limited control over the activities and business practices of these service providers or any inability on our part to maintain satisfactory commercial relationships with them may adversely affect our business, results of operations, and financial condition.

 

Changes to the General Mining Law of 1872 and related federal legislation that impact unpatented mining claims could adversely impact the Mt. Hope Project

 

The Mt. Hope Project is located substantially on unpatented mining claims administered by the BLM.  Mining on unpatented mining claims is conducted pursuant to the General Mining Law of 1872 and amendments thereto.  Legislation for the amendment of the mining laws applicable to mining property has been considered by the United States Congress, which may include imposition of a governmental royalty and new permitting and environmental rules.  Amendments to the mining laws could cause delays, increase the costs, and have an adverse effect on the returns anticipated from the Mt. Hope Project.

 

Increased costs could affect our ability to become profitable

 

Costs at any particular mining location frequently are subject to variation due to a number of factors, such as changing ore grade, changing metallurgy, and revisions to mine plans in response to the physical shape and location of the ore body.  In addition, costs are affected by the price of commodities, such as fuel, electricity, and labor.  Commodity costs are at times subject to volatile price movements, including increases that could make production at our projects less profitable or uneconomic.

 

We anticipate significant capital expenditures over the next several years in connection with the development of the Mt. Hope Project.  In the past several years, costs associated with capital expenditures have escalated on an industry-wide basis as a result of major factors beyond our control, including the prices of oil, steel and other commodities.  Increased costs for capital expenditures have an adverse effect on the returns anticipated from the Mt. Hope Project.

 

31



Table of Contents

 

Shortages of critical parts, equipment and skilled labor may adversely affect our development projects

 

The industry has been impacted at times by increased worldwide demand for critical resources such as input commodities, drilling equipment, tires, and skilled labor.  Shortages may cause unanticipated cost increases and delays in delivery times, potentially impacting operating costs, capital expenditures, and production schedules.

 

Cost estimates and timing of new projects are uncertain

 

The capital expenditures and time required to develop new mines or other projects are considerable and changes in costs or construction schedules can affect project economics.  There are a number of factors that can affect costs and construction schedules, including, among others:

 

·                  Availability of water, labor, power, transportation, commodities, and infrastructure;

 

·                  Increases in input commodity prices and labor costs;

 

·                  Fluctuations in exchange rates;

 

·                  Availability of financing;

 

·                  Difficulty of estimating construction costs over a period of years; and

 

·                  Delays in obtaining environmental or other government permits, including appeals of granted water applications.

 

Legislation, including the Sarbanes-Oxley Act of 2002 and the Dodd-Frank Wall Street Reform and Consumer Protection Act, may make it difficult for us to retain or attract officers and directors and increase the costs of doing business, which could adversely affect our financial position and results of operations

 

We may be unable to attract and retain qualified officers, directors and members of board committees required to provide for our effective management as a result of the recent changes and currently proposed changes in the rules and regulations, which govern publicly-held companies.  The Sarbanes-Oxley Act of 2002 has resulted in a series of rules and regulations by the SEC that increase responsibilities and liabilities of directors and executive officers.  The Dodd-Frank Wall Street Reform and Consumer Protection Act, adopted in July 2010, imposes significant additional obligations and disclosure requirements, as to which SEC rulemaking is ongoing.  We are a small company with a limited operating history and no revenues or profits, which may influence the decisions of potential candidates we may recruit as directors or officers.  The real and perceived increased personal risk associated with these requirements may deter qualified individuals from accepting these roles.  In addition, costs of compliance with such legislation, including several provisions specifically applicable to companies engaged in mining operations, could have a significant impact on our financial position and results of operations.

 

Provisions of Delaware law and our charter and bylaws may delay or prevent transactions that would benefit stockholders

 

Our certificate of incorporation and bylaws and the Delaware General Corporation Law contain provisions that may have the effect of delaying, deferring or preventing a change of control of the company.  These provisions, among other things:

 

·                  Provide for staggering the terms of directors by dividing the total number of directors into three groups;

 

·                  Authorize our board of directors to set the terms of preferred stock;

 

·                  Restrict our ability to engage in transactions with stockholders with 15% or more of outstanding voting stock;

 

·                  Authorize the calling of special meetings of stockholders only by the board of directors, not by the stockholders;

 

·                  Limit the business transacted at any meeting of stockholders to those purposes specifically stated in the notice of the meeting; and

 

32



Table of Contents

 

·                  Prohibit stockholder action by written consent without a meeting and provide that directors may be removed only at a meeting of stockholders.

 

Because of these provisions, persons considering unsolicited tender offers or other unilateral takeover proposals may be more likely to negotiate with our board of directors rather than pursue non-negotiated takeover attempts.  As a result, these provisions may make it more difficult for our stockholders to benefit from transactions that are opposed by an incumbent board of directors.

 

Forward-Looking Statements

 

Certain statements in this document may constitute forward-looking statements, which involve known and unknown risks, uncertainties and other factors, which may cause actual results, performance or achievements of our company, the Mt. Hope Project and our other projects, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements.  We use the words “may,” “will,” “believe,” “expect,” “anticipate,” “intend,” “future,” “plan,” “estimate,” “potential,” and other similar expressions to identify forward-looking statements.  Forward-looking statements may include, but are not limited to, statements with respect to the following:

 

·                  Our dependence on the success of the Mt. Hope Project;

 

·                  The ability to obtain all required permits, water rights, and approvals for the Mt. Hope Project and the Liberty Property;

 

·                  Issues related to the management of the Mt. Hope Project pursuant to the LLC Agreement;

 

·                  The dependence of additional investments by Hanlong and a loan from a Chinese bank on significant consents, approvals and conditions precedent which may not be obtained or met;

 

·                  Negotiation of acceptable loan terms with a Chinese bank in connection with the Hanlong transaction;

 

·                  Risks related to the failure of POS-Minerals to make contributions pursuant to the LLC Agreement;

 

·                  Fluctuations in the market price of, and demand for, molybdenum and other metals;

 

·                  The estimation and realization of mineral reserves and production estimates, if any;

 

·                  The timing of exploration, development and production activities and estimated future production, if any;

 

·                  Estimates related to costs of production, capital, operating and exploration expenditures;

 

·                  Requirements for additional capital and our ability to obtain additional capital in a timely manner and on acceptable terms;

 

·      Our ability to renegotiate, restructure, suspend, cancel or extend payment terms of contracts as necessary or appropriate in order to conserve cash;

 

·                  Government regulation of mining operations, environmental conditions and risks, reclamation and rehabilitation expenses;

 

·                  Title disputes or claims;

 

·                  Limitations of insurance coverage; and

 

·                  The future price of molybdenum, copper or other metals.

 

These forward-looking statements are based on our current expectations and are subject to a number of risks and uncertainties, including those identified under “Risk Factors” and “Management’s Discussion and Analysis of Financial Condition and Results of Operations.”  Although we believe that the expectations reflected in these forward-looking

 

33



Table of Contents

 

statements are reasonable, our actual results could differ materially from those expressed in these forward-looking statements, and any events anticipated in the forward-looking statements may not actually occur.

 

ITEM 1B.           UNRESOLVED STAFF COMMENTS

 

None.

 

ITEM 3.                    LEGAL PROCEEDINGS

 

On March 26, 2009, the Nevada State Engineer approved the Company’s water applications that requested mining and milling use of 11,300 acre feet annually of water to be drawn from a well field near the Mt. Hope Project.  Two appeals of the ruling were filed with the Seventh Judicial District Court of the State of Nevada (“NDC”) challenging the State Engineer’s decision.  On April 21, 2010, the District Court entered an order remanding the matter for another hearing by the State Engineer.  In June 2010, the Company filed a second set of applications with the State Engineer’s office requesting permits for mining and milling use of 11,300 acre feet annually of water to be drawn from a well field near the Mt. Hope Project.

 

On July 15, 2011, the State Engineer issued a second Ruling granting the Company’s water right applications.  In August 2011, Eureka County and two other parties comprised of three individual water rights holders in Diamond Valley and one in Kobeh Valley, filed Petitions and Amended and Supplemental Petitions (“Petitions”) with the NDC appealing the second Ruling of the State Engineer.  We continue to anticipate a favorable NDC decision, upholding the State Engineer’s second Ruling.  The appeal hearing is set for April 3, 2012 before the NDC.  A decision by the NDC is expected in mid-2012, although the NDC is not required to act under any specified timeline.  The appeal does not prevent the State Engineer from issuing the permits and as such, the State Engineer completed issuance of all permits on December 14, 2011 and certain amended permits on January 4, 2012 subject to the second Ruling.  The water will become available for consumptive use following the State Engineer’s approval of the Company’s Monitoring, Management and Mitigation Plan (“3M Plan”), developed with the input and cooperation of Eureka County. The Company is continuing to work with the State Engineer and Eureka County following our prior submissions, to finalize the 3M Plan and we anticipate the State Engineer will approve the 3M Plan prior to commencement of construction, in the second half of 2012.

 

ITEM 4.                    MINE SAFETY DISCLOSURES

 

Not applicable.

 

34



Table of Contents

 

PART II

 

ITEM 5.                    MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES

 

Market Information

 

On August 16, 2006 our common stock began trading on the American Stock Exchange (“NYSE Amex”) under the symbol “GMO.”  On February 14, 2008 our common stock began trading on the Toronto Stock Exchange (“TSX”), also under the symbol “GMO.”

 

The following table sets forth our common stock closing price as reported on the NYSE Amex:

 

Year

 

Quarter

 

High

 

Low

 

2011

 

First Quarter

 

$

6.52

 

$

4.82

 

 

 

Second Quarter

 

$

5.81

 

$

4.04

 

 

 

Third Quarter

 

$

4.78

 

$

2.81

 

 

 

Fourth Quarter

 

$

3.84

 

$

2.37

 

2010

 

First Quarter

 

$

3.99

 

$

2.12

 

 

 

Second Quarter

 

$

4.30

 

$

3.08

 

 

 

Third Quarter

 

$

3.66

 

$

2.90

 

 

 

Fourth Quarter

 

$

7.00

 

$

3.56

 

 

Holders

 

As of February 28, 2012, there were approximately 522 holders of record of our common stock.

 

Dividends

 

We have never declared or paid dividends on our common stock and we do not anticipate paying any dividends on our common stock in the foreseeable future.  We will pay dividends on our common stock only if and when declared by our board of directors.  Our board’s ability to declare a dividend is subject to limits imposed by Delaware corporate law.  In determining whether to declare dividends, the board will consider these limits, our financial condition, results of operations, working capital requirements, future prospects, and other factors it considers relevant.

 

Equity Compensation Plans

 

See Note 7 to the Financial Statements herein for information relating to our Equity Compensation Plan.

 

Stock Performance Graph

 

The performance graph covers the period from December 31, 2006 through December 31, 2011.  The graph compares the total return of our common stock (GMO) to the Dow Jones US Mining Index, the AMEX Russell 2000 Index and selected competitors in our industry, assuming an initial investment of $100.00.

 

35



Table of Contents

 

 

Company

 

31-Dec-06

 

31-Dec-07

 

31-Dec-08

 

31-Dec-09

 

31-Dec-10

 

31-Dec-11

 

General Moly (GMO)

 

$

100.00

 

$

399.66

 

$

40.41

 

$

71.23

 

$

221.92

 

$

105.82

 

Thompson Creek Metals (TCM)

 

100.00

 

172.04

 

49.65

 

124.92

 

147.92

 

70.52

 

Moly Mines (MOL)

 

100.00

 

316.35

 

25.96

 

77.88

 

155.77

 

28.85

 

Freeport McMoRan (FCX)

 

100.00

 

186.87

 

45.78

 

150.40

 

231.49

 

146.26

 

Augusta Resources (AZC)

 

100.00

 

204.19

 

21.40

 

112.56

 

177.21

 

144.19

 

iShares Dow Jones Basic Materials

 

100.00

 

131.59

 

64.67

 

106.28

 

139.24

 

118.00

 

iShares Russell 2000

 

100.00

 

98.23

 

64.69

 

83.13

 

105.51

 

100.83

 

 

36



Table of Contents

 

ITEM 6.                    SELECTED FINANCIAL DATA

 

 

 

 

(in millions, except per share data)

 

For the Years Ended December 31,

 

2011

 

2010

 

2009

 

2008

 

2007

 

Loss from operations

 

(15.2

)

(16.6

)

(10.5

)

(16.1

)

(39.0

)

Net loss

 

(14.8

)

(16.7

)

(10.5

)

(14.4

)

(37.7

)

Basic and diluted net loss per share

 

$

(0.16

)

$

(0.22

)

$

(0.14

)

$

(0.21

)

$

(0.71

)

 

At December 31,

 

2011

 

2010

 

2009

 

2008

 

2007

 

Total assets

 

$

271.1

 

$

273.2

 

$

209.6

 

$

220.9

 

$

110.3

 

Contingently redeemable noncontrolling interest

 

98.1

 

98.8

 

99.8

 

100.0

 

 

Total stockholders’ equity

 

$

143.1

 

$

136.4

 

$

104.9

 

$

113.0

 

$

102.1

 

 

ITEM 7.                    MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

 

The following discussion and analysis of our financial condition and results of operations constitutes management’s review of the factors that affected our financial and operating performance for the years ended December 31, 2011, 2010 and 2009.  This discussion should be read in conjunction with the consolidated financial statements and notes thereto contained elsewhere in this report.

 

Overview

 

We are a development stage company and began the development of the Mt. Hope Project on October 4, 2007.  During the year ended December 31, 2008 we also completed work on a pre-feasibility study of our Liberty Property, which we updated during 2011.

 

The development of the Mt. Hope Project has a Project Capital Estimate of $1,154 million including development costs of approximately $1,039 million (in 2008 dollars) and $115 million in cash financial assurance requirements and pre-payments.  The Project Capital Estimate is based on 2009 constant dollars and is subject to escalation.  We anticipate updating the Project Capital Estimate later this year.  These amounts do not include financing costs or amounts necessary to fund operating working capital and potential capital overruns.  From October 2007 through the year ended December 31, 2011, we have spent approximately $189.0 million on the Mt. Hope Project.

 

In 2009, because of declining molybdenum prices and unanticipated delays in the Mt. Hope Project permitting process, we implemented a cash conservation plan whereby total cash utilization, other than equipment purchases and permitting efforts, was reduced to approximately $1 million per month.  The Company has maintained its orders for grinding, milling, and other specialty long-lead equipment. However, other engineering, administrative and third party work was slowed or suspended.  We restarted some procurement and engineering efforts in January 2012 following the publication of the DEIS and our belief that we are getting closer to the commencement of actual Mt. Hope Project construction.  The Company had cash on hand as of December 31, 2011 of $40.7 million to meet its funding requirements for 2012.  Based on our current cash on hand and our ongoing cash conservation plan, the Company expects it will have adequate liquidity through the restart of the project and execution of the financing plan without needing to drawdown available funds from the second tranche of the Bridge Loan.

 

The worldwide molybdenum price fluctuated between $5.33 per pound in 2003 to over $40.00 per pound in 2005 and traded in the mid-$30s per pound prior to October 2008, when prices fell from approximately $33.50 per pound to $7.70 per pound in April 2009 as a result of the global economic collapse.  Subsequent to April 2009, prices slowly rose, finishing 2009 at $12.00 per pound and further increasing to finish 2010 at $16.40 per pound.  During 2011, prices traded in a relatively narrow range between $12.85 and $17.70 per pound, finishing the year at $13.40 per pound, according to Ryan’s Notes.  Since the beginning of 2012, prices have traded slightly higher and are currently trading at $14.70 per pound.

 

37



Table of Contents

 

The permitting process for the Mt. Hope Project has also had an impact on our activities because of delays experienced from extensive regulatory reviews and additional requests for information on environmental impacts.  Nevertheless, the process continues to move toward completion, and our efforts in this regard have continued full-time.  Once the major operating permits and the ROD from the BLM are effective, and financing is available, it is expected that Mt. Hope can be constructed and in production within approximately 20 months.

 

Restructuring and Suspension of Project Development

 

As discussed above, in March 2009, we implemented a cash conservation plan to reduce expenditures and conserve cash in order to maximize financial flexibility.  Engineering efforts related to the Mt. Hope Project, which currently are approximately 60% complete, were restarted in January 2012 following the publication of the DEIS.

 

As of March 2009, the LLC had purchase orders for mining and milling process equipment.  Some orders for mining equipment were cancelled, while orders for electric shovels and haul trucks were modified to become cancellable or non-binding.  Most equipment orders for the custom-built grinding and other milling process equipment are being completed by the manufacturers, and this equipment is being or will be stored pending commencement of construction.  The grinding and milling process equipment require the longest lead times and maintaining these orders is critical to the Company’s ability to rapidly restart the Mt. Hope Project development.  The LLC completed negotiations with other equipment manufacturers to suspend or terminate fabrication of other milling equipment.  As funding becomes available and equipment procurement is restarted, agreements that were suspended or terminated will be renegotiated under new market terms and conditions, as necessary.

 

Based on our current plan, expected timetable, and the results of such negotiations, we expect to make additional payments on milling process equipment orders of approximately $3.7 million in 2012 and $13.0 million in 2013.  For the gyratory crusher, SAG and ball mills and related electric mill drives, and some other long-lead equipment, we will own the equipment upon final payments forecasted to occur in 2012 and early 2013.  Also, at December 31, 2011, we have a contract to purchase two electric shovels that is cancellable, has no firm schedule of payments, and includes a $3.4 million deposit that is forfeitable if an additional $13.0 million deposit is not made by June 30, 2012.  The LLC continues to need this equipment for construction phase mine development and post-construction mining, and is committed to either renegotiate the timing and amount of the contractual deposit terms to provide more payment flexibility or obtaining additional funding sources in order to make this payment without impacting our liquidity position.

 

On February 28, the LLC issued a firm purchase order for 18 haul trucks to Cashman Equipment Company, the Nevada-based dealer for Caterpillar.  The order provides for delivery of those haul trucks required to perform initial mine development, currently scheduled for the second half of 2013.  A non-refundable down-payment of $0.6 million was made at the time of order with an additional $0.6 million due 12 months prior to truck shipment, but the contract is cancellable with no further liability to the LLC up until the time of truck shipment.  An additional 6 haul trucks are not required until after the commencement of commercial production, and will be ordered at a future date.

 

The cash conservation plan reduced our total cash utilization for general administrative and overhead expenses to approximately $1 million per month, inclusive of maintenance costs at the Liberty Property.  Based on our current cash on hand and our cash conservation plan, the Company expects it will have adequate liquidity through the restart of the project and execution of the financing plan.

 

The Mt. Hope LLC Agreement

 

Effective as of January 1, 2008, we contributed all of our interest in the assets related to the Mt. Hope Project, including our lease of the Mt. Hope Project into a newly formed entity, Eureka Moly, LLC, a Delaware limited liability company (“LLC”), and in February 2008 (“Closing Date”) entered into an agreement (“LLC Agreement”) for the development and operation of the Mt. Hope Project with POS-Minerals Corporation (“POS-Minerals”) an affiliate of POSCO, a large Korean steel company.  Under the LLC Agreement, POS-Minerals owns a 20% interest in the LLC and General Moly, through a wholly-owned subsidiary, owns an 80% interest.  The ownership interests and/or required contributions under the LLC Agreement can change as discussed below.

 

Pursuant to the terms of the LLC Agreement, POS-Minerals made its first and second cash contributions to the LLC totaling $100.0 million during the year ended December 31, 2008 (“Initial Contributions”).  Additional amounts will be due from POS-Minerals within 15 days after the date (“ROD Contribution Date”) that specified conditions (“ROD Contribution Conditions”) have been satisfied.  The ROD Contribution Conditions are (i) the receipt of major operating permits for the Mt. Hope Project, (ii) confirmation that the Record of Decision (“ROD”) from the United States Bureau of Land Management

 

38



Table of Contents

 

(“BLM”) for the Mt. Hope Project has become effective, and (iii) any administrative or judicial appeals with respect thereto are final.  We are currently targeting the effective date of the ROD and the satisfaction of the other ROD Contribution Conditions to occur between June and September 2012.   However, circumstances beyond our control, including reviewing agency delays or requests for additional information or studies, and requests for review or appeals of the BLM decision, could cause the effectiveness of the ROD and/or the satisfaction of the other ROD Contribution Conditions to be delayed beyond that expected time.  Once the ROD is effective and financing is in place, we expect that production will begin approximately 20 months following initiation of project construction.

 

To maintain its 20% interest in the LLC, POS-Minerals will be required to make an additional $56.0 million contribution plus its 20% share of all Mt. Hope Project costs incurred from the Closing Date to the ROD Contribution Date within 15 days after the ROD Contribution Date.  If POS-Minerals does not make its additional $56.0 million contribution when due after the ROD Contribution Date, its interest will be reduced to 10%.

 

In addition, as commercial production at the Mt. Hope Project was not achieved by December 31, 2011, the LLC may be required to return to POS-Minerals $36.0 million of its contributions to the LLC, with no corresponding reduction in POS-Minerals’ ownership percentage.  Based on our current plan and assuming POS-Minerals has made its additional $56.0 million contribution within 15 days after the ROD Contribution Date, a payment to POS-Minerals of $36.0 million will be due 20 days after the commencement of commercial production, as defined in the LLC Agreement.   We currently anticipate such payment being made during 2014.  If POS-Minerals does not make its additional $56.0 million contribution when due, no return of contributions is required by us.  Our wholly-owned subsidiary and 80% owner of the LLC, Nevada Moly, LLC (“Nevada Moly”), is obligated under the terms of the LLC Agreement to make capital contributions to fund the return of contributions to POS-Minerals, if required.  If Nevada Moly does not make these capital contributions, POS-Minerals has an election to either make a secured loan to the LLC to fund the return of contributions, or receive an additional interest in the LLC of approximately 5%.  In the latter case, our interest in the LLC is subject to dilution by a percentage equal to the ratio of 1.5 times the amount of the unpaid contributions over the aggregate amount of deemed capital contributions (as determined under the LLC Agreement) of both parties to the LLC (“Dilution Formula”).  At December 31, 2011, the aggregate amount of deemed capital contributions of both parties was $880.0 million.

 

Furthermore, the LLC Agreement permits POS-Minerals to put its interest in the LLC to Nevada Moly after a change of control of Nevada Moly or the Company, as defined in the LLC Agreement, followed by a failure to use standard mining industry practice in connection with development and operation of the Mt. Hope Project as contemplated by the parties for a period of twelve consecutive months.  If POS-Minerals puts its interest, Nevada Moly or its transferee or surviving entity would be required to purchase the interest for 120% of POS-Minerals’ contributions to the LLC plus 10% interest per annum.

 

The Initial Contributions of $100.0 million that were made by POS-Minerals during 2008 were expended by the second quarter of 2009 in accordance with the program and budget requirements of the Mt. Hope Project.  Nevada Moly is required, pursuant to the terms of the LLC Agreement, to advance funds required to pay costs for the development of the Mt. Hope Project that exceed the Initial Contributions until the ROD Contribution Date, at which point the contributions described above to be made by POS-Minerals will be applied to reimburse us for POS-Minerals’ share of such development costs.  All costs incurred after the ROD Contribution Date will be allocated and funded pro rata based on each party’s ownership interest.  POS-Minerals’ share of such development costs amounted to approximately $37.5 million as of December 31, 2011.  The interest of a party in the LLC that does not make its pro rata capital contributions to fund costs incurred after the ROD Contribution Date is subject to dilution based on the Dilution Formula.

 

Agreements with Hanlong (USA) Mining Investment Inc.

 

We have signed a series of agreements (the “Hanlong Transaction”) with Hanlong (USA) Mining Investment, Inc. (“Hanlong”), an affiliate of Sichuan Hanlong Group, a large privately held Chinese company.  The agreements described below form the basis of a $745 million transaction that is intended to provide the Company with adequate capital to develop the Mt. Hope Project.  The agreements include:  (a) a Securities Purchase Agreement that provides for the sale to Hanlong of shares of our common stock in two tranches that will aggregate 25% of our outstanding stock on a fully diluted basis for $80 million ($40 million per tranche), conditioned upon us receiving permits for Mt. Hope and Hanlong’s use of commercially reasonable efforts to procure a $665 million loan from a Prime Chinese Bank for our use in constructing Mt. Hope; (b) a Bridge Loan whereby Hanlong will provide up to $20 million to the Company to preserve liquidity until permits are received; (c) a Stockholder Agreement that provides Hanlong representation on our Board of Directors and the LLC management committee, governs how Hanlong will vote its shares of the Company and limits Hanlong’s ability to purchase or dispose of our securities; and (d) a long-term molybdenum supply off-take agreement.

 

39



Table of Contents

 

The Securities Purchase Agreement (“Purchase Agreement”)

 

Stock Purchase.  The Purchase Agreement provides, subject to its terms and conditions, for the purchase by Hanlong of $80.0 million of our common stock, or approximately 27.6 million shares, which will equal 25% of our outstanding common stock on a fully-diluted basis.

 

The Purchase Agreement has been amended four times including:  (1) a July 30, 2010 amendment extending the deadline for obtaining Chinese government approvals by two months to October 13, 2010, as well as extending the Company’s deadline for publishing its DEIS and receiving its ROD to February 28, 2011, and November 30, 2011, respectively.  Hanlong has received Chinese government approvals for its equity investment in us and our DEIS has been published; (2) an October 26, 2010 amendment setting the closing of Hanlong’s purchase of the first $40.0 million tranche of equity for December 20, 2010 and eliminating the condition that required us to have our DEIS published prior to closing this funding; (3) a December 20, 2010 amendment that made certain non-substantive changes in connection with the Tranche 1 closing; and (4) July 7, 2011 amendment that eliminated the deadline for publication of the DEIS, extended the ROD deadline from November 30, 2011 to the earlier of nine months following DEIS publication or September 30, 2012, extended Hanlong’s commitment to make available the Term Loan from two months following the ROD to nine months following the ROD, and extended the maturity date of the Bridge Loan to the earlier of (i) 270 days after the issuance of the ROD, (ii) the date on which the Purchase Agreement terminates, and (iii) the earlier of December 31, 2012 and the availability of the Term Loan.

 

The ROD deadline is extendable by up to three months to December 31, 2012, as discussed below.  The Purchase Agreement may be terminated by either party (provided the terminating party is not in default) if the closing of the second tranche (“Tranche 2”) has not occurred on or before the earlier of September 30, 2012 (unless the parties have agreed to the ROD Condition Extension date of December 31, 2012) or twelve months after the issuance of the ROD.

 

As discussed above, the second tranche will be for a purchase price of an additional $40.0 million.  Significant conditions to the closing of Tranche 2 include issuance of the ROD for the Mt. Hope Project by the BLM, approval of the plan of operations for the Mt. Hope Project (the “POO”) by the BLM, and the completion of documentation for and satisfaction of conditions precedent for the availability of funding under the Term Loan, described below.

 

Hanlong will have the right to purchase a portion of any additional shares of common stock that we issue so that it can maintain its percentage ownership, unless its ownership is at the time below 5% at the earlier of the closing of Tranche 2 or closing of the Term Loan.  It may also acquire additional shares so that it maintains a 20% indirect interest in the Mt. Hope Project if our interest in the LLC is reduced below 80%.  If we issue shares to fund the Mt. Hope Project under certain circumstances, and on or before the date of commercial production, and Hanlong exercises its rights to maintain its percentage interest, we will be obligated to refund to Hanlong the cost of such shares over a three-year period up to an aggregate of $9.0 million.

 

Break Fees.  A break fee is payable by both the Company and Hanlong if the Purchase Agreement terminates because of the failure of certain conditions.  A break fee of $10.0 million is payable to the Company if the Purchase Agreement is terminated because Hanlong fails to obtain necessary Chinese government approvals, which may be offset against any balances owed by the Company under the Bridge Loan.  A break fee of $5.0 million is payable to Hanlong if the ROD is not timely received or the condition waived and the Purchase Agreement is terminated.  The Company’s break fee may be increased by $5.0 million if the Purchase Agreement is terminated and the Company has violated the “no-shop” provisions of the Purchase Agreement.  The break fees may also be increased by up to $2.0 million if the Company requests and Hanlong grants an extension concerning the ROD (the “Extension Fee”).  Any such fee will be credited against the arrangement fee described below.  The break fee payable by the Company to Hanlong may be paid in cash, or, in certain circumstances, in shares of our common stock at our option.  If paid in shares, the price would be the volume weighted average of our common stock on the NYSE Amex for the five days ending six days after the announcement of the termination.  On January 9, 2012, the Company and Hanlong executed an option agreement concerning the Purchase Agreement for no consideration.  The option must be exercised on or before December 31, 2012.  If the option is exercised, the parties will amend the Purchase Agreement to extend payment of the Extension Fee from December 2012 until April 30, 2013.

 

Chinese Bank Term Loan.  Hanlong is obligated to use commercially reasonable efforts to procure a Term Loan in an amount of at least $665.0 million with a term of at least 14 years after commercial production begins at the Mt. Hope Project.  The Term Loan will bear interest at a rate tied to the London Interbank Offered Rate (“LIBOR”) plus a spread of between 2% and 4% per annum.  The Purchase Agreement provides that the Term Loan will have customary covenants and conditions; however, the terms of the Term Loan have not yet been negotiated with the lender and we have no assurance as to

 

40



Table of Contents

 

the final terms of the Term Loan.  On February 16, 2012, the Company announced China Development Bank (“CDB”) had confirmed the basic terms underlying a proposed $665 million term loan to finance the Mt. Hope project, including a CDB commitment to lend $399 million and arrange a consortium of Chinese and international banks to fund the balance.  The term loan is anticipated to carry a maturity of 12 years including a 30 month grace period to allow for the construction of the Mt. Hope project.  The interest rate will remain subject to market conditions and Chinese government policy.  The Company and Hanlong are continuing to work with CDB with a target of having the loan completed, approved and available to the Company upon receipt of Mt. Hope’s operating permits.  Hanlong or an affiliate is obligated to guarantee the Term Loan.  When funds can be drawn by the Company under the Term Loan, the Company will pay a $15.0 million arrangement fee to Hanlong who will pay fees and expenses associated with the Term Loan before the Term Loan Closing, including those charged by the Chinese bank.

 

Bridge Loan

 

Hanlong agreed to provide a $20.0 million Bridge Loan to the Company, available in two equal $10.0 million tranches.  On April 28, 2010, we drew down the first $10.0 million tranche.  The second tranche became available after receiving stockholder approval of the Hanlong Transaction.  The first tranche of the Bridge Loan bears interest at LIBOR plus 2% per annum.  The second tranche of the Bridge Loan will bear interest at 10% per annum and is undrawn.  The Bridge Loan will be repaid from the proceeds of the Term Loan.  The second tranche may also be repaid at the Company’s election, in shares of the Company’s common stock.  If paid in shares, the price would be the volume weighted average of the Company’s shares on the NYSE Amex for a five-day period after public announcement of the event that required repayment.  The Company may offset its right to receive the break fee against its obligations to repay borrowings under the Bridge Loan.  On January 9, 2012, the Company and Hanlong executed an option agreement concerning the Bridge Loan Agreement.  If exercised, the parties will amend the Bridge Loan Agreement to extend the maturity date of the Bridge Loan from December 31, 2012 until April 30, 2013.  This option also has the effect of potentially extending the availability of the undrawn $10.0 million second tranche to April 30, 2013 since the availability of the second tranche ends the earliest of the Tranche 2 closing date, the maturity date of the Bridge Loan, and the first borrowing under the Term Loan.

 

The outstanding balance of the Bridge Loan and related accrued interest are recorded as a current liability as of December 31, 2011 as the Company anticipates the Term Loan will become available within the next twelve months.  The Bridge Loan and our obligation to pay a break fee to Hanlong under the Purchase Agreement are secured by a pledge by us of a 10% interest in the LLC.

 

Stockholder Agreement

 

In connection with Hanlong’s purchase of our shares, Hanlong signed a Stockholder Agreement with the Company that limits Hanlong’s future acquisitions of our common stock, provides for designation of up to two directors to our Board and representation on the LLC management committee, and places some restrictions on Hanlong’s voting and disposition of our shares.

 

After the Tranche 1 closing, Hanlong became entitled to nominate one director to serve on our Board and one representative to the LLC management committee.  Nelson Chen currently serves in both of these capacities.  After the Tranche 2 closing, Hanlong will be entitled to nominate a second director.  The Company will include and recommend the election of Hanlong’s nominees in the Board’s slate of nominees submitted to our stockholders, subject to the Board’s fiduciary obligations and compliance by the nominee with applicable law and Company requirements concerning disclosure of information.  The Hanlong nominees may also serve on committees for which they are eligible.

 

Hanlong has agreed not to purchase additional shares, except as permitted by the Purchase Agreement, without the Company’s prior consent, and has agreed that it will not solicit proxies, join a group with respect to our equity securities, solicit or encourage an offer from another person for the Company, call a meeting of the Company’s stockholders or make a proposal to the Company’s stockholders, except to the Board.  If our Board receives an offer for the Company, for its assets or a merger that the Board determines is in the best interests of the Company’s stockholders, Hanlong is required to vote in favor of such a transaction or tender its shares unless it proposes an alternative transaction that our Board determines is more favorable to our stockholders than the offer received.

 

Hanlong may not, without the prior written consent of the Board, transfer ownership of their securities if the recipient would acquire beneficial ownership of more than 5% of our common stock as of the date of such transfer.  The restrictions on Hanlong’s share ownership, voting, disposition and drag-along rights will terminate on the earlier of the time that Hanlong owns less than 10% of our common stock, the date that is 6 months after the date that commercial production begins at the Mt. Hope Project, and June 30, 2014.

 

41



Table of Contents

 

ArcelorMittal n/k/a APERAM Participation

 

The Company’s November 2007 private placement of 8.257 million shares with ArcelorMittal included certain anti-dilution rights.  Pursuant to those rights, ArcelorMittal had an option to participate in the Tranche 1 and Tranche 2 equity issuances.  On April 16, 2010, the Company and ArcelorMittal entered into a Consent and Waiver Agreement (the “Agreement”) whereby ArcelorMittal waived its anti-dilution rights with respect to the Company’s proposed issuance of stock under the Hanlong investment.  ArcelorMittal will retain anti-dilution rights for future issuances of Company stock outside of shares sold under the Hanlong investment.  On January 25, 2011, the boards of directors of ArcelorMittal S.A. and APERAM each approved the transfer of the assets comprising ArcelorMittal’s stainless and specialty steels businesses from its carbon steel mining businesses to APERAM, a separate entity incorporated in the Grand Duchy of Luxembourg.  This transfer included the off-take agreement the Company had in place with ArcelorMittal and the shares of the Company’s common stock previously owned by ArcelorMittal.

 

For further detail on our off-take agreements, see Item 7A below.

 

Liquidity, Capital Resources and Capital Requirements

 

Year Ended December 31, 2011 Compared to Year Ended December 31, 2010

 

Our total consolidated cash balance at December 31, 2011 was $40.7 million compared to $53.6 million at December 31, 2010.  The decrease in our cash balances for the year ended December 31, 2011 was due primarily to development expenditures and debt issuance costs incurred of $12.8 million, advance royalty payments of $9.5 million, and general and administrative costs of $10.2 million offset by $19.4 million in proceeds from the exercise of outstanding warrants.  Deposits on property, plant and equipment relate primarily to scheduled payments for long-lead time equipment for the Mt. Hope Project.  See “— Contractual Obligations” below.  The majority of funds expended were used to advance the Mt. Hope Project.

 

Total assets as of December 31, 2011 decreased to $271.1 million compared to $273.2 million as of December 31, 2010 primarily due to forfeited long-term deposits on mining equipment of $3.4 million with the passage of a June 30, 2011 deadline for a firm purchase order.

 

As discussed above under “— Permitting and Water Rights Update”, we currently anticipate the effectiveness of the ROD and the satisfaction of the other ROD Contribution Conditions to occur between June and September 2012, but circumstances beyond our control could cause the effectiveness of the ROD and/or the satisfaction of the other ROD Contribution Conditions to be delayed.

 

As discussed above under “— Securities Purchase Agreement with Hanlong (USA) Mining Investment Inc. ,” we have signed a series of agreements with Hanlong that form the basis of a significant investment by Hanlong in the Company that is intended to provide the Company with adequate capital to develop the Mt. Hope Project.  On April 28, 2010, we drew down the first tranche of the bridge loan from Hanlong in the amount of $10.0 million.  On December 20, 2010, Hanlong completed the purchase of 12.5% of our fully-diluted shares, or approximately 11.8 million shares, for $40.0 million.

 

With our cash conservation plan, our non-equipment related cash requirements have declined to approximately $1 million per month.  Based on our current plan and expected timetable, we expect to make additional payments of approximately $3.7 million under milling process equipment orders through the end of 2012 and $13.0 million in 2013.  As additional financing becomes available and equipment procurement is restarted, agreements that were suspended or terminated will be renegotiated under current market terms and conditions, as necessary.  Based on our Project Capital Estimate we estimate that an additional $9.0 million related to the Construction Royalty Advance must be paid on or before October 19, 2012, which amount has been accrued.  Accordingly, based on our current cash on hand and our ongoing cash conservation plan, the Company expects it will have adequate liquidity through the restart of the project and execution of the financing plan without needing to drawdown available funds from the second tranche of the Bridge Loan.

 

Year Ended December 31, 2010 Compared to Year Ended December 31, 2009

 

Our cash balance at December 31, 2010 was $53.6 million compared to $48.6 million at December 31, 2009.  The increase in our cash balances for the year ended December 31, 2010 was due primarily to proceeds from the sale of Tranche 1 equity to Hanlong of $40.0 million, $10.0 million advanced under the Bridge Loan, and $3.0 million from the exercise of outstanding warrants offset by development costs incurred of $14.1 million, deposits on property, plant and equipment

 

42



Table of Contents

 

totaling $25.1 million, and general and administrative costs of $8.8 million.  Deposits on property, plant and equipment relate primarily to scheduled payments for long-lead time equipment for the Mt. Hope Project.

 

Total assets as of December 31, 2010 increased to $273.2 million compared to $209.6 million as of December 31, 2009 primarily as a result of the cash received upon issuance of the Tranche 1 shares to Hanlong and proceeds from the drawdown of the Tranche 1 Bridge Loan.

 

Results of Operations

 

Year Ended December 31, 2011 Compared to Year Ended December 31, 2010

 

For the year ended December 31, 2011 we had a consolidated net loss of $15.4 million compared with a net loss of $16.7 million in the same period for 2010.

 

For the year ended December 31, 2011 and 2010, exploration and evaluation expenses were $1.6 million and $0.6 million, respectively.  The increase in costs compared to the previous year relates to work performed at the Liberty Project to update the pre-feasibility study.

 

For the year ended December 31, 2011 and 2010, general and administrative expenses were $10.2 million and $10.9 million, respectively.  For the year ended December 31, 2011 the decrease in costs compared to the previous year were due primarily to lower costs associated with outside legal counsel.

 

For the year ended December 31, 2011 and 2010, write downs of development and deposits were $3.4 million and $5.0 million, respectively.  These costs are due to forfeited long-term deposits on mining equipment with the passage of a June 30, 2011 deadline for a firm purchase order, and the relinquishment of the annex lease to Eureka County during the third quarter of 2010, respectively.

 

For the year ended December 31, 2011 and 2010, interest income rounded to nil as a result of low deposit interest rates on consolidated cash balances in 2011 and 2010.  Interest expense for the year ended December 31, 2011 and 2010 was $0.2 million and $0.2 million, respectively, as a result of interest accrued on the bridge loan.

 

Year Ended December 31, 2010 Compared to Year Ended December 31, 2009

 

For the year ended December 31, 2010 we had a net loss of $16.7 million compared with a net loss of $10.5 million in the same period for 2009.

 

For the year ended December 31, 2010 and 2009, exploration and evaluation expenses were $0.6 million and $0.8 million, respectively.  For the year ended December 31, 2010 the Liberty remained on a care and maintenance status, and accordingly, the resulting exploration and evaluation expenses are considerable lower for the year.

 

For the year ended December 31, 2010 and 2009, general and administrative expenses were $10.9 million and $9.7 million, respectively.  For the year ended December 31, 2010 general and administrative costs were significantly higher than in 2009 as a greater amount of equity compensation was incurred as a result of the impact of increasing share prices on equity compensation plans and additional awards granted.

 

For the year ended December 31, 2010, write downs of development and deposits was $5.0 million as a result of the Company’s relinquishment of a land lease held by the LLC in Eureka County, Nevada.  The LLC had invested $5.0 million in preliminary development costs for the property covered by the lease.  As a result of the relinquishment, these costs were written off by the Company.

 

Interest income was nil for the year ended December 31, 2010 and 2009 as a result of low interest rates and cash balances in both years.  Interest expense was $0.2 million and nil for the years ended December 31, 2010 and 2009 as a result of interest accrued on the bridge loan outstanding during 2010.

 

Off-Balance Sheet Arrangements

 

None.

 

43



Table of Contents

 

Contractual Obligations

 

Our contractual obligations as of December 31, 2011 were as follows, based on permitting expectations:

 

 

 

Payments due by period
(in millions)

 

Contractual obligations

 

Total

 

2012

 

2013 - 2015

 

2016 - 2017

 

2018 & Beyond

 

Long-Term Debt (Capital Lease) Obligations

 

$

0.1

 

$

0.1

 

$

 

$

 

$

 

Operating Lease Obligations

 

0.3

 

0.2

 

0.1

 

 

 

Agricultural Sustainability Trust Contributions

 

4.0

 

2.0

 

2.0

 

 

 

Equipment Purchase Contracts

 

16.7

 

3.7

 

13.0

 

 

 

Advance Royalties and Deferral Fees

 

9.0

 

9.0

 

 

 

 

Provision for post closure reclamation and remediation

 

0.6

 

 

 

 

0.6

 

Total

 

$

30.7

 

$

15.0

 

$

15.1

 

$

 

$

0.6

 

 

At December 31, 2011, the LLC has a contract to purchase two electric shovels that is cancellable and has no firm schedule of payments.  We also had a non-binding letter of agreement on 24 haul trucks that establishes our priority for delivery.  Both agreements provide for the then current pricing using market indices upon initiation of an order.  We have active orders with varying stages of fabrication on milling process equipment comprised of two 230kV primary transformers and substation, a primary crusher, a semi-autogenous mill, two ball mills, and various motors for the mills.  We have suspended fabrication on 16 flotation cells, lime slaking equipment, hydrocyclones, and other smaller milling process equipment with the ability to re-initiate fabrication at any time.  The LLC terminated the fabrication of two multi-hearth molybdenum roasters and have received finished goods of the partially completed order.  The LLC plans to re-establish a new purchase order with this manufacturer as financing becomes available and equipment procurement is restarted under then current market terms and conditions.

 

On February 28, the LLC issued a firm purchase order for 18 haul trucks to Cashman Equipment Company, the Nevada-based dealer for Caterpillar.  The order provides for delivery of those haul trucks required to perform initial mine development, currently scheduled for the second half of 2013.  A non-refundable down-payment of $0.6 million was made at the time of order with an additional $0.6 million due 12 months prior to truck shipment, but the contract is cancellable with no further liability to the LLC up until the time of truck shipment.  An additional 6 haul trucks are not required until after the commencement of commercial production, and will be ordered at a future date.

 

44



Table of Contents

 

The following table sets forth the LLC’s cash commitments under mining and milling equipment contracts (collectively, “Purchase Contracts”) at December 31, 2011 (in millions):

 

Period

 

Cash Commitments
Under Equipment
Purchase Contracts as
of December 31, 2011

 

1st Quarter 2012

 

$

2.3

 

2nd Quarter 2012

 

 

3rd Quarter 2012

 

 

4th Quarter 2012

 

1.4

 

Total 2012

 

3.7

 

2013

 

13.0

 

2014

 

 

2015

 

 

Total

 

$

16.7

 

 

If the Company does not make payments required under the purchase contracts, it could be subject to claims for breach of contract or to cancellation of the purchase contract.  In addition, we may proceed to selectively suspend, cancel or attempt to renegotiate additional purchase contracts if we are forced to further conserve cash.  See “Liquidity, Capital Resources and Capital Requirements” above.  If we cancel or breach any contracts, we will take all appropriate action to minimize any losses, but could be subject under the contracts or applicable law.  The cancellation of certain key contracts would cause a delay in the commencement of operations, have ramifications under the LLC Agreement with POS-Minerals and would add to the cost to develop our interest in the Mt. Hope Project.

 

Obligations under capital and operating leases

 

We have contractual obligations under capital and operating leases that will require a total of $0.4 million in payments over the next three years.  Assets under capital lease relate to light vehicles leased by the Company for use in operations.  Operating leases consist primarily of rents on office facilities and office equipment.  Our expected payments are $0.3 million, $0.1 million, and nil for the years ended December 31, 2012, 2013 and 2014, respectively.

 

Creation of Agricultural Sustainability Trust

 

On August 19, 2010, the LLC entered into an agreement with the Eureka Producers’ Cooperative (the “EPC”) whereby the LLC will fund a Sustainability Trust (the “Trust”) in exchange for the cooperation of the EPC with respect to the LLC’s water rights and permitting of the Mt. Hope Project.  The Trust will be tasked with developing and implementing programs that will serve to enhance the sustainability and well-being of the agricultural economy in the Diamond Valley Hydrographic Basin through reduced water consumption, which may include the Trust purchasing and relinquishing water rights in Diamond Valley to help bring the Diamond Valley basin into a more sustainable water balance.  The Trust’s activities will be governed by a five-member board including one LLC representative.

 

The Trust may be funded by the LLC over several years based on the achievement of certain milestones.  The achievement of these milestones is considered to be probable, and as such $4.0 million is accrued in the Company’s December 31, 2011, financial statements and is included in mining properties, land, and water rights.  At least 50% of the contributions would be provided upon receipt of all permits, full financing and the Company’s Board of Directors’ decision to proceed with construction.  The remaining payments would be split evenly with one payment due no later than 150 days from the commencement of commercial production at the Mt. Hope Project and the remaining payment due one year thereafter.

 

Permitting Considerations

 

In the ordinary course of business, mining companies are required to seek governmental permits for expansion of existing operations or for the commencement of new operations. The LLC will be required to obtain a ROD from the BLM authorizing implementation of the Mt. Hope Project POO.  This approval can be obtained only after successful completion of the process of environmental evaluation, which incorporates substantial public comment.  The LLC will also need to obtain various state and federal permits including water protection, air quality, water rights and reclamation permits.  In addition to requiring permits for the development of the Mt. Hope Project, we will need to obtain and modify various mining and

 

45



Table of Contents

 

environmental permits during the life of the Mt. Hope Project.  Obtaining, modifying, and renewing the necessary governmental permits is a complex and time-consuming process involving numerous jurisdictions and often involving public hearings and substantial expenditures.  The duration and success of the LLC’s efforts to obtain, modify or renew permits will be contingent upon many variables, some of which are not within the LLC’s control.  Increased costs or delays could occur, depending on the nature of the activity to be permitted and the interpretation of applicable requirements implemented by the permitting authority.  All necessary permits may not be obtained and, if obtained, may not be renewed, or the costs involved in each case may exceed those that we previously estimated.  It is possible that the costs and delays associated with compliance with such standards and regulations could become such that the LLC would not proceed with the development or operation of the Mt. Hope Project.

 

Water Rights Considerations

 

In addition to working to complete the EIS, we are working to finalize the transfer of water rights to mining use.  In March 2009 we were granted our water applications in a Ruling by the State Engineer.  However, that Ruling was successfully appealed in April 2010 in Nevada District Court (“NDC”), remanding the matter for another hearing by the State Engineer.

 

On July 15, 2011, the State Engineer issued a second Ruling granting the Company’s water right applications.  In August 2011, Eureka County and two other parties comprised of three individual water rights holders in Diamond Valley and one in Kobeh Valley, filed Petitions and Amended and Supplemental Petitions (“Petitions”) with the NDC appealing the second Ruling of the State Engineer.  We continue to anticipate a favorable NDC decision, upholding the State Engineer’s second Ruling.  The appeal hearing is set for April 3, 2012 before the NDC.  A decision by the NDC is expected in mid-2012, although the NDC is not required to act under any specified timeline.  The appeal does not prevent the State Engineer from issuing the permits and as such, the State Engineer completed issuance of all permits on December 14, 2011 and certain amended permits on January 4, 2012 subject to the second Ruling.  The water will become available for consumptive use following the State Engineer’s approval of the Company’s Monitoring, Management and Mitigation Plan (“3M Plan”), developed with the input and cooperation of Eureka County. The Company is continuing to work with the State Engineer and Eureka County following our prior submissions, to finalize the 3M Plan and we anticipate the State Engineer will approve the 3M Plan prior to commencement of construction, in the second half of 2012.

 

Environmental Considerations

 

Our mineral property holdings in Shoshone County, Idaho include lands contained in mining districts that have been designated as “Superfund” sites pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act.  This “Superfund Site” was established to investigate and remediate primarily the Bunker Hill properties of Smelterville, Idaho, a small portion of Shoshone County where a large smelter was located.  However, because of the extent of environmental impact caused by the historical mining in the mining district, the Superfund Site covers the majority of Shoshone County including our Chicago-London and Little Pine Creek properties as well as many small towns located in Northern Idaho.  We have conducted a property environmental investigation of these properties, which revealed no evidence of material adverse environmental effects at either property.  We are unaware of any pending action or proceeding relating to any regulatory matters that would affect our financial position due to these inactive mining claims in Shoshone County.

 

Critical Accounting Policies and Estimates

 

Estimates

 

The process of preparing financial statements in conformity with U.S. GAAP requires the use of estimates and assumptions regarding certain types of assets, liabilities, revenues, and expenses.  Such estimates primarily relate to unsettled transactions and events as of the date of the financial statements.  Accordingly, upon settlement, actual results may differ from estimated amounts.

 

Provision for Taxes

 

Income taxes are provided based upon the asset and liability method of accounting.  Under this approach, deferred income taxes are recorded to reflect the tax consequences in future years of differences between the tax basis of assets and liabilities and their financial reporting amounts at each year-end.  In accordance with authoritative guidance for Income Taxes, a valuation allowance is recorded against the deferred tax asset if management does not believe the Company has met the “more likely than not” standard to allow recognition of such an asset.

 

46



Table of Contents

 

Property, Plant and Equipment

 

The Company evaluates its long-lived assets for impairment when events or changes in circumstances indicate that the related carrying amount may not be recoverable.  If the sum of estimated future net cash flows on an undiscounted basis is less than the carrying amount of the related asset grouping, asset impairment is considered to exist.  The related impairment loss is measured by comparing estimated future net cash flows on a discounted basis to the carrying amount of the asset.  Changes in significant assumptions underlying future cash flow estimates may have a material effect on the Company’s financial position and results of operations.  To date no such impairments have been identified.  Property and equipment are being depreciated over useful lives of three to twenty-seven and one-half years using straight-line depreciation.

 

Stock-Based Compensation

 

We account for stock-based compensation in accordance with authoritative guidance for Share-Based Payments.  Under the fair value recognition provisions of this statement, share-based compensation cost is measured at the grant date based on the value of the award and is recognized as expense over the vesting period.  Determining the fair value of share-based awards at the grant date requires judgment; including estimating expected dividends and estimating the amount of share-based awards that are expected to be forfeited.  If actual results differ significantly from these estimates, stock-based compensation expense and our results of operations could be materially impacted.

 

Contingently Redeemable Noncontrolling Interest (“CRNCI”)

 

On January 1, 2009, we adopted Financial Accounting Standards Board (“FASB”) authoritative guidance related to Noncontrolling Interests in Consolidated Financial Statements, the provisions of which, among others, require the recognition of a noncontrolling interest (previously referred to as minority interest), as a component of equity in the consolidated financial statements and separate from the parent’s equity for all periods presented. In addition, the amount of net income or loss attributable to the noncontrolling interest is included in net income or loss on the face of the consolidated statement of operations.  Under GAAP, certain noncontrolling interests in consolidated entities meet the definition of mandatorily redeemable financial instruments if the ability to redeem the interest is outside of the control of the consolidating entity.  As described in Note 1, the LLC Agreement permits POS-Minerals the option to put its interest in the LLC to Nevada Moly upon a change of control, as defined in the LLC Agreement, followed by a failure to use standard mining industry practice in connection with development and operation of the Mt. Hope Project as contemplated by the parties for a period of twelve consecutive months.  As such, the CRNCI has continued to be shown as a separate caption between liabilities and equity (mezzanine section).  The carrying value of the CRNCI reflects the investment of the noncontrolling interest, less losses attributable to the interest.

 

ITEM 7A.      QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

 

Commodity Price Risk

 

We are a development stage company in the business of the exploration, development and mining of properties primarily containing molybdenum.  As a result, upon commencement of production, our financial performance could be materially affected by fluctuations in the market price of molybdenum and other metals we may mine.  The market prices of metals can fluctuate widely due to a number of factors.  These factors include fluctuations with respect to the rate of inflation, the exchange rates of the U.S. dollar and other currencies, interest rates, global or regional political and economic conditions, banking environment, global and regional demand, production costs, and investor sentiment.

 

In order to better manage commodity price risk and to seek to reduce the negative impact of fluctuations in prices, we will seek to enter into long term supply contracts for our portion of the Mt. Hope production.  On December 28, 2007, we entered into a molybdenum supply agreement with ArcelorMittal S.A. (“ArcelorMittal”), the world’s largest steel company, that provides for ArcelorMittal to purchase 6.5 million pounds of molybdenum per year, plus or minus 10%, once the Mt. Hope Project commences commercial operations at minimum specified levels. The supply agreement provides for a floor price along with a discount for spot prices above the floor price and expires five years after the commencement of commercial production at the Mt. Hope Project.  Both the floor and threshold levels at which the percentage discounts change are indexed to a producer price index. On April 16, 2010, ArcelorMittal and the Company entered into an extension molybdenum supply agreement, providing ArcelorMittal with a five-year option to make effective an agreement to purchase from the Company 3.0 million pounds of molybdenum per year for 10 years following the expiration of the initial supply agreement.  The additional optional off-take will be priced in alignment with the Company’s existing supply agreements.  In order for ArcelorMittal to exercise this option and make the extension agreement effective, ArcelorMittal must have

 

47



Table of Contents

 

beneficial ownership of more than 11.1 million shares of Company common stock on or prior to April 15, 2015.  According to public filings, on January 25, 2011, the boards of directors of ArcelorMittal S.A. and APERAM each approved the transfer of the assets comprising ArcelorMittal’s stainless and specialty steels businesses from its carbon steel and mining businesses to APERAM, a separate entity incorporated in the Grand Duchy of Luxembourg.  This transfer included the off-take agreement the Company had in place with ArcelorMittal and the shares of the Company’s common stock previously owned by ArcelorMittal.

 

Additionally, on May 14, 2008, we entered into a molybdenum supply agreement with SeAH Besteel Corporation (“SeAH Besteel”), Korea’s largest manufacturer of specialty steels, which provides for SeAH Besteel to purchase 4.0 million pounds of molybdenum per year, plus or minus 10%, once the Mt. Hope Project commences commercial operations at minimum specified levels. Like the ArcelorMittal supply agreement, the supply agreement with SeAH Besteel provides for a floor price along with staged discounts for spot prices above the floor price and expires five years from the date of first supply under the agreement.  Both the floor and threshold levels at which the percentage discounts change are indexed to a producer price index.

 

On August 8, 2008, the Company entered into a molybdenum supply agreement (“Sojitz Agreement”) with Sojitz Corporation (“Sojitz”).  The Sojitz Agreement provides for the supply of 5.0 million pounds per year of molybdenum for five years, beginning once the Mt. Hope Project reaches certain minimum commercial production levels.  One million annual pounds sold under the Sojitz Agreement will be subject to a per-pound molybdenum floor price and is offset by a flat discount to spot molybdenum prices above the floor.  The remaining 4.0 million annual pounds sold under the Sojitz Agreement will be sold with reference to spot molybdenum prices without regard to a floor price.  The Sojitz Agreement includes a provision that allows Sojitz the option to cancel in the event that supply from the Mt. Hope Project has not begun by January 1, 2013.  Based on our current development timeline, Sojitz will have the option to cancel its contract or participate in the molybdenum supply agreement as described above.  If Sojitz elects to cancel its contract with us, the supply of 5.0 million pounds per year of molybdenum for five years will be assumed by Hanlong, pursuant to the terms of the Hanlong molybdenum supply agreement described below.

 

On March 4, 2010, the Company entered into a molybdenum supply agreement (“Hanlong Agreement”) with Hanlong.  The Hanlong Agreement requires Hanlong to purchase the Company’s entire share of the Mt. Hope molybdenum production above that necessary for the Company to meet its existing supply commitments until the expiration of those commitments.  After the expiration of the existing supply agreements, until the original scheduled maturity date of the Term Loan, or if the Company elects not to enter into the Term Loan, 14 years after commencement of commercial production, Hanlong must annually purchase the greater of 16 million pounds or 70% of the Company’s share of Mt. Hope production.  Following the original scheduled maturity date of the Term Loan, or if the Company elects not to enter into the Term Loan, 14 years after commencement of commercial production from the Mt. Hope Mine, Hanlong must purchase a percentage of the Company’s share of Mt. Hope production equal to 2.5 times Hanlong’s fully diluted percentage ownership of our common stock.  Subject to certain exceptions, the Hanlong Agreement will terminate once Hanlong’s fully-diluted ownership percentage falls below 5%.  As long as Hanlong continues to guarantee the Term Loan, the Hanlong Agreement will not terminate even if Hanlong’s ownership falls below 5%.  If the cause of Hanlong’s ownership falling below 5% is a change of control of the Company or a dilutive transaction in which Hanlong does not have the right to participate, the Hanlong Agreement will not terminate and Hanlong will be obligated to continue to purchase a percentage of the Company’s share of Mt. Hope production equal to 2.5 times Hanlong’s fully-diluted percentage ownership of the Company as it existed immediately prior to such change of control or dilutive transaction.  If the Company elects not to enter into the Term Loan, and the second loan tranche does not close, Hanlong’s obligation to purchase the Company’s share of Mt. Hope production in each of the periods described above will be half of the obligations described above.  The supply off-take agreement provides for a floor price, along with a discount for spot prices above the floor price, for twenty-five percent of the production Hanlong receives. The remaining 75% of the production Hanlong receives will be sold with reference to spot molybdenum prices less a small discount.

 

All four long term supply agreements provide for supply only after commercial production levels are achieved, and no provisions require the Company to deliver product or make any payments if commercial production is never achieved or declines, in later periods and have floor prices ranging from $14.00 to $15.00 per pound and incremental discounts above the floor price.  The agreements require that monthly shortfalls be made up only if the Company’s portion of Mt. Hope production is available for delivery, after POS-Minerals has taken its share.  In no event do these requirements to make up monthly shortfalls become obligations of the Company if production does not meet targeted levels.

 

Furthermore, each of the agreements have take-or-pay provisions that require the buyers to either take delivery of product made available by the Company, or to pay as though they had taken delivery pursuant to the term of the agreements.

 

48



Table of Contents

 

While we have not used derivative financial instruments in the past, we may elect to enter into derivative financial instruments to manage commodity price risk.  We have not entered into any market risk sensitive instruments for trading or speculative purposes and do not expect to enter into derivative or other financial instruments for trading or speculative purposes.

 

Interest Rate Risk

 

As of December 31, 2011, we had a balance of cash and cash equivalents of $40.7 million.  Interest rates on short term, highly liquid investments have not changed materially since December 31, 2010, and continue to be 1% or less on an annualized basis.  Our debt agreements have interest rates of LIBOR plus a percentage.  Any significant rise in the LIBOR rate during the course of our debt agreements may affect our ability to service the debt.

 

49



Table of Contents

 

ITEM 8.               FINANCIAL STATEMENTS

 

GENERAL MOLY, INC.

(A Development Stage Company)

 

CONSOLIDATED FINANCIAL STATEMENTS

December 31, 2011

 

CONTENTS

 

Report of Independent Registered Public Accounting Firm

 

51

 

 

 

Financial Statements:

 

 

 

 

 

Consolidated Balance Sheets as of December 31, 2011 and December 31, 2010

 

52

 

 

 

Consolidated Statements of Operations for the twelve months ended December 31, 2011, December 31, 2010 and December 31, 2009 and for the period from inception of Exploration Stage until December 31, 2011

 

53

 

 

 

Consolidated Statements of Cash Flows for the twelve months ended December 31, 2011, December 31, 2010 and December 31, 2009 and for the period from inception of Exploration Stage until December 31, 2011

 

54

 

 

 

Consolidated Statements of Equity as of December 31, 2011, December 31, 2010, December 31, 2009, December 31, 2008, and January 1, 2002 (inception of Exploration Stage)

 

56

 

 

 

Notes to Consolidated Financial Statements

 

58

 

50



Table of Contents

 

Report of Independent Registered Public Accounting Firm

 

To the Board of Directors and Shareholders of General Moly, Inc.

 

In our opinion, the accompanying consolidated balance sheets and the related consolidated statements of operations, cash flows and equity present fairly, in all material respects, the financial position of General Moly, Inc. and its subsidiaries (a development stage company) at December 31, 2011 and 2010, and the results of their operations and their cash flows for each of the three years in the period ended December 31, 2011 and, cumulatively, for the period from January 1, 2002 (date of inception) to December 31, 2011 in conformity with accounting principles generally accepted in the United States of America. Also in our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, 2011, based on criteria established in Internal Control - Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). The Company’s management is responsible for these consolidated financial statements, for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting, included in Item 9: Report of Management on internal control over financial reporting. Our responsibility is to express opinions on these consolidated financial statements and on the Company’s Internal Control over Financial Reporting based on our integrated audits.  We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States).  Those standards require that we plan and perform the audits to obtain reasonable assurance about whether the consolidated financial statements are free of material misstatement and whether effective internal control over financial reporting was maintained in all material respects.  Our audits of the consolidated financial statements included examining, on a test basis, evidence supporting the amounts and disclosures in the consolidated financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation.  Our audit of internal control over financial reporting included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, and testing and evaluating the design and operating effectiveness of internal control based on the assessed risk.  Our audits also included performing such other procedures as we considered necessary in the circumstances. We believe that our audits provide a reasonable basis for our opinions.

 

A company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles.  A company’s internal control over financial reporting includes those policies and procedures that (i) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (ii) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (iii) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial statements.

 

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements.  Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

 

/s/PricewaterhouseCoopers LLP

 

Denver, Colorado

 

March 1, 2012

 

51



Table of Contents

 

GENERAL MOLY, INC.

(A DEVELOPMENT STAGE COMPANY)

CONSOLIDATED BALANCE SHEETS

 

(In thousands, except par value amounts)

 

 

 

December 31,
2011

 

December 31,
2010

 

ASSETS:

 

 

 

 

 

CURRENT ASSETS

 

 

 

 

 

Cash and cash equivalents

 

$

40,709

 

$

53,571

 

Deposits, prepaid expenses and other current assets

 

105

 

148

 

Total Current Assets

 

40,814

 

53,719

 

Mining properties, land and water rights — Note 4

 

143,732

 

133,093

 

Deposits on project property, plant and equipment

 

66,474

 

68,363

 

Restricted cash held for electricity transmission

 

12,005

 

12,005

 

Restricted cash held for reclamation bonds

 

1,133

 

1,133

 

Non-mining property and equipment, net

 

819

 

1,045

 

Capitalized debt issuance costs

 

3,136

 

887

 

Other assets

 

2,994

 

2,994

 

TOTAL ASSETS

 

$

271,107

 

$

273,239

 

LIABILITIES, CONTINGENTLY REDEEMABLE NONCONTROLLING INTEREST AND EQUITY:

 

 

 

 

 

CURRENT LIABILITIES

 

 

 

 

 

Accounts payable and accrued liabilities

 

$

4,568

 

$

4,138

 

Accrued advance royalties

 

8,950

 

9,500

 

Accrued payments to Agricultural Sustainability Trust

 

2,000

 

 

Current portion of long term debt

 

10,596

 

194

 

Total Current Liabilities

 

26,114

 

13,832

 

Provision for post closure reclamation and remediation costs

 

587

 

571

 

Deferred gain

 

1,150

 

215

 

Accrued advance royalties

 

 

8,950

 

Accrued payments to Agricultural Sustainability Trust

 

2,000

 

4,000

 

Long term debt, net of current portion

 

131

 

10,481

 

Total Liabilities

 

29,982

 

38,049

 

 

 

 

 

 

 

COMMITMENTS AND CONTINGENCIES — Note 10

 

 

 

 

 

 

 

 

 

 

 

CONTINGENTLY REDEEMABLE NONCONTROLLING INTEREST

 

98,073

 

98,753

 

 

 

 

 

 

 

EQUITY

 

 

 

 

 

Common stock, $0.001 par value; 200,000,000 shares authorized, 90,818,248 and 85,353,473 shares issued and outstanding, respectively

 

91

 

85

 

Additional paid-in capital

 

255,894

 

234,517

 

Accumulated deficit before exploration stage

 

(213

)

(213

)

Accumulated deficit during exploration and development stage

 

(112,720

)

(97,952

)

Total Equity

 

143,052

 

136,437

 

TOTAL LIABILITIES, CONTINGENTLY REDEEMABLE NONCONTROLLING INTEREST AND EQUITY

 

$

271,107

 

$

273,239

 

 

The accompanying notes are an integral part of these consolidated financial statements.

 

52



Table of Contents

 

GENERAL MOLY, INC.

(A DEVELOPMENT STAGE COMPANY)

CONSOLIDATED STATEMENTS OF OPERATIONS

 

(In thousands, except per share amounts)

 

 

 

Years Ended

 

January 1, 2002
(Inception of
Exploration Stage)

 

 

 

December 31,
2011

 

December 31,
2010

 

December 31,
2009

 

to
December 31,
2011

 

REVENUES

 

$

 

$

 

$

 

$

 

 

 

 

 

 

 

 

 

 

 

OPERATING EXPENSES:

 

 

 

 

 

 

 

 

 

Exploration and evaluation

 

1,568

 

623

 

806

 

39,701

 

Writedowns of development and deposits

 

3,403

 

5,038

 

 

8,819

 

General and administrative expense

 

10,248

 

10,919

 

9,703

 

69,775

 

TOTAL OPERATING EXPENSES

 

15,219

 

16,580

 

10,509

 

118,295

 

 

 

 

 

 

 

 

 

 

 

LOSS FROM OPERATIONS

 

(15,219

)

(16,580

)

(10,509

)

(118,295

)

 

 

 

 

 

 

 

 

 

 

OTHER INCOME/(EXPENSE):

 

 

 

 

 

 

 

 

 

Interest and dividend income

 

21

 

13

 

31

 

4,062

 

Interest expense

 

(250

)

(164

)

 

(414

)

TOTAL OTHER (EXPENSE)/INCOME, NET

 

(229

)

(151

)

31

 

3,648

 

 

 

 

 

 

 

 

 

 

 

LOSS BEFORE INCOME TAXES

 

(15,448

)

(16,731

)

(10,478

)

(114,647

)

 

 

 

 

 

 

 

 

 

 

Income Taxes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONSOLIDATED NET LOSS

 

$

(15,448

)

$

(16,731

)

$

(10,478

)

$

(114,647

)

Less: Net loss attributable to contingently redeemable noncontrolling interest

 

680

 

1,008

 

239

 

1,927

 

NET LOSS ATTRIBUTABLE TO GENERAL MOLY, INC.

 

$

(14,768

)

$

(15,723

)

$

(10,239

)

$

(112,720

)

Basic and diluted net loss attributable to General Moly per share of common stock

 

$

(0.16

)

$

(0.22

)

$

(0.14

)

 

 

Weighted average number of shares outstanding— basic and diluted

 

90,588

 

72,987

 

72,226

 

 

 

 

The accompanying notes are an integral part of these consolidated financial statements.

 

53



Table of Contents

 

GENERAL MOLY, INC.

(A DEVELOPMENT STAGE COMPANY)

CONSOLIDATED STATEMENTS OF CASH FLOWS

 

(In thousands)

 

 

 

Years Ended

 

January 1, 2002
(Inception of
Exploration Stage)

 

 

 

December 31,
2011

 

December 31,
2010

 

December 31,
2009

 

to
December 31,
2011

 

CASH FLOWS FROM OPERATING ACTIVITIES:

 

 

 

 

 

 

 

 

 

Net loss

 

$

(15,448

)

$

(16,731

)

$

(10,478

)

$

(114,647

)

Adjustments to reconcile net loss to net cash used by operating activities:

 

 

 

 

 

 

 

 

 

Services and expenses paid with common stock

 

 

 

 

1,990

 

Repricing of warrants

 

 

965

 

 

965

 

Writedowns of development and deposits

 

3,403

 

5,038

 

378

 

8,819

 

Depreciation and amortization

 

412

 

335

 

344

 

1,644

 

Interest expense

 

250

 

164

 

 

414

 

Equity compensation for employees and directors

 

1,713

 

1,641

 

1,474

 

16,812

 

Decrease (increase) in deposits, prepaid expenses and other

 

43

 

31

 

147

 

(13

)

Decrease (increase) in restricted cash held for electricity transmission

 

 

281

 

259

 

(12,005

)

(Decrease) increase in accounts payable and accrued liabilities

 

(10,761

)

93

 

(3,305

)

(7,303

)

Increase (decrease) in post closure reclamation and remediation costs

 

16

 

(15

)

(145

)

378

 

Net cash used by operating activities

 

(20,372

)

(8,198

)

(11,326

)

(102,946

)

 

 

 

 

 

 

 

 

 

 

CASH FLOWS FROM INVESTING ACTIVITIES:

 

 

 

 

 

 

 

 

 

Payments for the purchase of equipment

 

 

(124

)

(100

)

(1,548

)

Purchase of securities

 

 

 

 

(137

)

Purchase and development of mining properties, land and water rights

 

(10,567

)

(14,074

)

(20,879

)

(119,274

)

Deposits/refunds on property, plant and equipment

 

177

 

(25,058

)

(11,527

)

(67,907

)

Proceeds from option to purchase agreement

 

935

 

115

 

100

 

1,150

 

Increase in restricted cash held for reclamation bonds

 

 

 

 

(642

)

Cash provided by sale of marketable securities

 

 

 

 

246

 

Net cash used by investing activities

 

(9,455

)

(39,141

)

(32,406

)

(188,112

)

 

54



Table of Contents

 

GENERAL MOLY, INC.

(A DEVELOPMENT STAGE COMPANY)

CONSOLIDATED STATEMENTS OF CASH FLOWS

 

(In thousands)

 

 

 

Years Ended

 

January 1, 2002
(Inception of
Exploration Stage)

 

 

 

December 31,
2011

 

December 31,
2010

 

December 31,
2009

 

to
December 31,
2011

 

CASH FLOWS FROM FINANCING ACTIVITIES:

 

 

 

 

 

 

 

 

 

Proceeds from issuance of stock, net of issuance costs

 

19,412

 

43,103

 

99

 

227,719

 

Proceeds from debt

 

 

10,000

 

 

10,000

 

Cash proceeds from POS-Minerals Corp.

 

 

 

 

100,000

 

Cash paid to POS-Minerals Corp. for purchase price adjustment

 

 

 

 

(2,994

)

Decrease in restricted cash — EMLLC

 

 

 

13,915

 

 

(Decrease) increase in leased assets, net

 

(198

)

80

 

(130

)

132

 

(Increase) in capitalized debt issuance costs

 

(2,249

)

(887

)

 

(3,136

)

Net cash provided by financing activities:

 

16,965

 

52,296

 

13,884

 

331,721

 

(Decrease) increase in cash and cash equivalents, net

 

(12,862

)

(4,957

)

(29,848

)

40,663

 

Cash and cash equivalents, beginning of period

 

53,571

 

48,614

 

78,462

 

46

 

Cash and cash equivalents, end of period

 

$

40,709

 

$

53,571

 

$

48,614

 

$

40,709

 

 

 

 

 

 

 

 

 

 

 

NON-CASH INVESTING AND FINANCING ACTIVITIES:

 

 

 

 

 

 

 

 

 

Equity compensation capitalized as development

 

$

258

 

$

1,121

 

$

950

 

$

6,458

 

Restricted cash held for reclamation bond acquired in an acquisition

 

 

 

 

491

 

Post closure reclamation and remediation costs and accounts payable assumed in an acquisition

 

 

 

 

263

 

Common stock and warrants issued for property and equipment

 

 

 

 

1,586

 

Accrued portion of deposits on property, plant and equipment

 

1,691

 

657

 

 

1,691

 

Accrued portion of advance royalties

 

 

18,450

 

 

8,950

 

Accrued portion of payments to the Agricultural Sustainability Trust

 

 

4,000

 

 

4,000

 

 

The accompanying notes are an integral part of these consolidated financial statements

 

55



Table of Contents

 

GENERAL MOLY, INC.

(A DEVELOPMENT STAGE COMPANY)

CONSOLIDATED STATEMENTS OF EQUITY

 

(In thousands, except number of shares and per share amounts)

 

 

 

Common 
Shares

 

Amount

 

Additional
Paid-In Capital

 

Accumulated
Other
Comprehensive
Income (Loss)

 

Accumulated
Deficit

 

Total

 

Balance, January 1, 2002

 

3,140,469

 

$

4

 

$

442

 

$

(2

)

$

(213

)

$

231

 

Issuance of Units of Common Stock

 

 

 

 

 

 

 

 

 

 

 

 

 

For directors’ fees

 

460,000

 

 

79

 

 

 

79

 

For cash at $8.50 per share

 

8,256,699

 

8

 

70,174

 

 

 

70,182

 

Purchase options for management and administrative fees

 

 

 

11

 

 

 

11

 

For services, administration, mineral rights, water rights and expenses at between $0.11 and $6.15 per share

 

1,127,379

 

 

1,739

 

 

 

1,739

 

For exercise of warrants for cash

 

435,000

 

 

348

 

 

 

348

 

Issuance of Units of Common Stock and Warrants:

 

 

 

 

 

 

 

 

 

 

 

 

 

For expenses and property at between $0.40 and $1.46 per unit

 

1,400,000

 

2

 

1,635

 

 

 

1,637

 

For cash at between $0.15 and $3.40 per unit

 

34,404,365

 

34

 

62,360

 

 

 

62,394

 

Units and warrants for finders fee

 

170,550

 

 

2,042

 

 

 

2,042

 

Cost of offerings including cash costs of $3,783

 

 

 

(5,815

)

 

 

(5,815

)

Stock Options:

 

 

 

 

 

 

 

 

 

 

 

 

 

Exercised between $0.11 and $6.93 per share

 

3,501,463

 

4

 

1,669

 

 

 

1,673

 

Cashless exercise of stock options

 

1,648,647

 

2

 

(2

)

 

 

 

Issued pursuant to stock awards

 

831,347

 

2

 

(38

)

 

 

(36

)

Returned due to pricing errors on stock option exercise

 

(38,998

)

 

 

 

 

 

Stock based compensation

 

 

 

15,932

 

 

 

15,932

 

Stock Warrants:

 

 

 

 

 

 

 

 

 

 

 

 

 

Issued for services at $1.07 per warrant

 

 

 

80

 

 

 

80

 

Exercised between $0.40 and $5.20 per share

 

14,537,267

 

14

 

34,026

 

 

 

34,040

 

Cashless exercise of warrants

 

1,978,458

 

2

 

(2

)

 

 

 

Unrealized Losses on marketable securities

 

 

 

 

2

 

 

2

 

Additional paid in capital from shareholder

 

 

 

499

 

 

 

499

 

Net loss for the years ended December 31, 2002 through 2008

 

 

 

 

 

(71,990

)

(71,990

)

Balances, December 31, 2008

 

71,852,646

 

72

 

185,179

 

 

(72,203

)

113,048

 

 

56



Table of Contents

 

GENERAL MOLY, INC.

(A DEVELOPMENT STAGE COMPANY)

CONSOLIDATED STATEMENTS OF EQUITY

 

(In thousands, except number of shares and per share amounts)

 

 

 

Common 
Shares

 

Amount

 

Additional
Paid-In Capital

 

Accumulated
Other
Comprehensive
Income (Loss)

 

Accumulated
Deficit

 

Total

 

Issuance of Units of Common Stock :

 

 

 

 

 

 

 

 

 

 

 

 

 

Issued pursuant to stock awards

 

484,892

 

 

 

 

 

 

Stock Options:

 

 

 

 

 

 

 

 

 

 

 

 

 

Exercised between $0.44 and $2.10 per share

 

100,000

 

 

100

 

 

 

100

 

Stock based compensation

 

 

 

2,011

 

 

 

2,011

 

Net loss for the year ended December 31, 2009

 

 

 

 

 

(10,239

)

(10,239

)

Balances, December 31, 2009

 

72,437,538

 

72

 

187,290

 

 

(82,442

)

104,920

 

Stock Warrants:

 

 

 

 

 

 

 

 

 

 

 

 

 

Exercised at $3.75 per share

 

812,500

 

1

 

3,046

 

 

 

3,047

 

Cashless exercise of warrants

 

59,770

 

 

 

 

 

 

Repricing of warrants

 

 

 

965

 

 

 

965

 

Stock Options:

 

 

 

 

 

 

 

 

 

 

 

 

 

Exercised at $2.80 per share

 

20,000

 

 

57

 

 

 

57

 

Cashless exercise of options

 

24,074

 

 

 

 

 

 

Stock based compensation

 

 

 

2,723

 

 

 

2,723

 

Issuance of Units of Common Stock :

 

 

 

 

 

 

 

 

 

 

 

 

 

Issued for cash at $3.38 per share

 

11,843,341

 

12

 

39,988

 

 

 

40,000

 

Issued pursuant to stock awards

 

156,250

 

 

448

 

 

 

448

 

Net loss for the year ended December 31, 2010

 

 

 

 

 

(15,723

)

(15,723

)

Balances, December 31, 2010

 

85,353,473

 

85

 

234,517

 

 

(98,165

)

136,437

 

Stock Warrants:

 

 

 

 

 

 

 

 

 

 

 

 

 

Exercised between $3.66 and $3.75 per share

 

5,183,209

 

5

 

19,050

 

 

 

19,055

 

Cashless exercise of warrants

 

24,547

 

 

 

 

 

 

Stock Options:

 

 

 

 

 

 

 

 

 

 

 

 

 

Exercised at $2.80 per share

 

133,333

 

 

357

 

 

 

357

 

Stock based compensation

 

 

 

1,971

 

 

 

1,971

 

Stock Appreciation Rights:

 

 

 

 

 

 

 

 

 

 

 

 

 

Exercised between $0.96 and $4.35 per share

 

53,511

 

 

 

 

 

 

Issuance of Units of Common Stock :

 

 

 

 

 

 

 

 

 

 

 

 

 

Issued pursuant to stock awards

 

70,175

 

1

 

(1

)

 

 

 

Net loss for the year ended December 31, 2010

 

 

 

 

 

(14,768

)

(14,768

)

Balances, December 31, 2011

 

90,818,248

 

$

91

 

$

255,894

 

$

 

$

(112,933

)

$

143,052

 

 

The accompanying notes are an integral part of these consolidated financial statements.

 

57



Table of Contents

 

GENERAL MOLY, INC.

(A DEVELOPMENT STAGE COMPANY)

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

 

NOTE 1 — DESCRIPTION OF BUSINESS

 

General Moly, Inc. (“we,” “us,” “our,” “Company,” or “General Moly”) is a Delaware corporation originally incorporated as General Mines Corporation on November 23, 1925.  We have gone through several name changes and on October 5, 2007, we reincorporated in the State of Delaware (“Reincorporation”) through a merger involving Idaho General Mines, Inc. and General Moly, Inc., a Delaware corporation that was a wholly owned subsidiary of Idaho General Mines, Inc. The Reincorporation was effected by merging Idaho General Mines, Inc. with and into General Moly, with General Moly being the surviving entity.  For purposes of the Company’s reporting status with the United States Securities and Exchange Commission (“SEC”), General Moly is deemed a successor to Idaho General Mines, Inc.

 

We were in the exploration stage from January 1, 2002 until October 4, 2007, when our Board of Directors (“Board”) approved the development of the Mt. Hope molybdenum property (“Mt. Hope Project”) in Eureka County, Nevada.  The Company is now in the development stage and is currently proceeding with the development of the Mt. Hope Project.  We are also conducting exploration and evaluation activities on our Liberty molybdenum property (“Liberty Property”) in Nye County, Nevada.

 

The Mt. Hope Project.  From October 2005 to January 2008, we owned the rights to 100% of the Mt. Hope Project.  Effective as of January 1, 2008, we contributed all of our interest in the assets related to the Mt. Hope Project, including our lease of the Mt. Hope Project into a newly formed entity, Eureka Moly, LLC, a Delaware limited liability company (“LLC”), and in February 2008 (“Closing Date”) entered into an agreement (“LLC Agreement”) for the development and operation of the Mt. Hope Project with POS-Minerals Corporation (“POS-Minerals”) an affiliate of POSCO, a large Korean steel company.  Under the LLC Agreement, POS-Minerals owns a 20% interest in the LLC and General Moly, through a wholly-owned subsidiary, owns an 80% interest.  The ownership interests and/or required contributions under the LLC Agreement can change as discussed below.

 

Pursuant to the terms of the LLC Agreement, POS-Minerals made its first and second cash contributions to the LLC totaling $100.0 million during the year ended December 31, 2008 (“Initial Contributions”).  Additional amounts will be due from POS-Minerals within 15 days after the date (“ROD Contribution Date”) that specified conditions (“ROD Contribution Conditions”) have been satisfied.  The ROD Contribution Conditions are (i) the receipt of major operating permits for the Mt. Hope Project, (ii) confirmation that the Record of Decision (“ROD”) from the United States Bureau of Land Management (“BLM”) for the Mt. Hope Project has become effective, and (iii) any administrative or judicial appeals with respect thereto are final.  We are currently targeting the effective date of the ROD and the satisfaction of the other ROD Contribution Conditions to occur six to nine months after publication of the Draft Environmental Impact Statement (“DEIS”) in the Federal Register, which occurred on December 2, 2011.  However, circumstances beyond our control, including reviewing agency delays or requests for additional information or studies, and requests for review or appeals of the BLM decision, could cause the effectiveness of the ROD and/or the satisfaction of the other ROD Contribution Conditions to be delayed.  Once the ROD is effective and financing is in place, we expect that commercial production will begin approximately 20 months following initiation of project construction.

 

To maintain its 20% interest in the LLC, POS-Minerals will be required to make an additional $56.0 million contribution plus its 20% share of all Mt. Hope Project costs incurred from the Closing Date to the ROD Contribution Date within 15 days after the ROD Contribution Date.  If POS-Minerals does not make its additional $56.0 million contribution when due after the ROD Contribution Date, its interest will be reduced to 10%.

 

In addition, as commercial production at the Mt. Hope Project was not achieved by December 31, 2011, the LLC may be required to return to POS-Minerals $36.0 million of its contributions to the LLC, with no corresponding reduction in POS-Minerals’ ownership percentage.  Based on our current plan and assuming POS-Minerals has made its additional $56.0 million contribution within 15 days after the ROD Contribution Date, a payment to POS-Minerals of $36.0 million will be due 20 days after the commencement of commercial production, as defined in the LLC Agreement.  We currently anticipate such payment being made during 2014.  If POS-Minerals does not make its additional $56.0 million contribution when due, no return of contributions is required by us.  Our wholly-owned subsidiary and 80% owner of the LLC, Nevada Moly, LLC (“Nevada Moly”), is obligated under the terms of the LLC Agreement to make capital contributions to fund the return of contributions to POS-Minerals, if required.  If Nevada Moly does not make these capital contributions, POS-Minerals has an election to either make a secured loan to the LLC to fund the return of contributions, or receive an additional interest in the

 

58



Table of Contents

 

LLC of approximately 5%.  In the latter case, our interest in the LLC is subject to dilution by a percentage equal to the ratio of 1.5 times the amount of the unpaid contributions over the aggregate amount of deemed capital contributions (as determined under the LLC Agreement) of both parties to the LLC (“Dilution Formula”).  At December 31, 2010, the aggregate amount of deemed capital contributions of both parties was $880.0 million.

 

Furthermore, the LLC Agreement permits POS-Minerals to put its interest in the LLC to Nevada Moly after a change of control of Nevada Moly or the Company, as defined in the LLC Agreement, followed by a failure to use standard mining industry practice in connection with development and operation of the Mt. Hope Project as contemplated by the parties for a period of twelve consecutive months.  If POS-Minerals puts its interest, Nevada Moly or its transferee or surviving entity would be required to purchase the interest for 120% of POS-Minerals’ contributions to the LLC plus 10% interest per annum.

 

The Initial Contributions of $100.0 million that were made by POS-Minerals during 2008 were expended by the second quarter of 2009 in accordance with the program and budget requirements of the Mt. Hope Project.  Nevada Moly is required, pursuant to the terms of the LLC Agreement, to advance funds required to pay costs for the development of the Mt. Hope Project that exceed the Initial Contributions until the ROD Contribution Date, at which point the contributions described above to be made by POS-Minerals will be applied to reimburse us for POS-Minerals’ share of such development costs.  All costs incurred after the ROD Contribution Date will be allocated and funded pro rata based on each party’s ownership interest.  POS-Minerals’ share of such development costs amounted to approximately $37.5 million as of December 31, 2011.  The interest of a party in the LLC that does not make its pro rata capital contributions to fund costs incurred after the ROD Contribution Date is subject to dilution based on the Dilution Formula.

 

NOTE 2 — LIQUIDITY AND CAPITAL REQUIREMENTS AND RESTRUCTURING

 

Our consolidated cash balance at December 31, 2011, was $40.7 million compared to $53.6 million at December 31, 2010.  The cash needs for the development of the Mt. Hope Project require that we and/or the LLC finalize the financing described below in addition to the capital contributions to be received from POS-Minerals.

 

The anticipated sources of financing described below, combined with funds anticipated to be received from POS-Minerals in order to retain its 20% share, provide substantially all of our currently planned funding required for constructing and placing the Mt. Hope Project into commercial production.  Funding requirements for working capital and potential capital overrun needs will require additional resources.  There can be no assurance that the Company will be successful in raising additional financing in the future on terms acceptable to the Company or at all.

 

Agreements with Hanlong (USA) Mining Investment Inc.

 

We have signed a series of agreements (the “Hanlong Transaction”) with Hanlong (USA) Mining Investment, Inc. (“Hanlong”), an affiliate of Sichuan Hanlong Group, a large privately held Chinese company.  The agreements described below form the basis of a $745 million transaction that is intended to provide the Company with adequate capital to develop the Mt. Hope Project.  The agreements include:  (a) a Securities Purchase Agreement that provides for the sale to Hanlong of shares of our common stock in two tranches that will aggregate 25% of our outstanding stock on a fully diluted basis for $80 million ($40 million per tranche), conditioned upon us receiving permits for Mt. Hope and Hanlong’s use of commercially reasonable efforts to procure a $665 million loan from a Prime Chinese Bank for our use in constructing Mt. Hope; (b) a Bridge Loan whereby Hanlong will provide up to $20 million to the Company to preserve liquidity until permits are received; (c) a Stockholder Agreement that provides Hanlong representation on our Board of Directors and the LLC management committee, governs how Hanlong will vote its shares of the Company and limits Hanlong’s ability to purchase or dispose of our securities; and (d) a long-term molybdenum supply off-take agreement.

 

The Securities Purchase Agreement (“Purchase Agreement”)

 

Stock Purchase.  The Purchase Agreement provides, subject to its terms and conditions, for the purchase by Hanlong of $80.0 million of our common stock, or approximately 27.6 million shares, which will equal 25% of our outstanding common stock on a fully-diluted basis.

 

The Purchase Agreement has been amended four times including:  (1) a July 30, 2010 amendment extending the deadline for obtaining Chinese government approvals by two months to October 13, 2010, as well as extending the Company’s deadline for publishing its DEIS and receiving its ROD to February 28, 2011, and November 30, 2011, respectively.  Hanlong has received Chinese government approvals for its equity investment in us and our DEIS has been published; (2) an October 26, 2010 amendment setting the closing of Hanlong’s purchase of the first $40.0 million tranche of

 

59



Table of Contents

 

equity for December 20, 2010 and eliminating the condition that required us to have our DEIS published prior to closing this funding; (3) a December 20, 2010 amendment that made certain non-substantive changes in connection with the Tranche 1 closing; and (4) a July 7, 2011 amendment that eliminated the deadline for publication of the DEIS, extended the ROD deadline from November 30, 2011 to the earlier of nine months following DEIS publication or September 30, 2012, extended Hanlong’s commitment to make available the Term Loan from two months following the ROD to nine months following the ROD, and extended the maturity date of the Bridge Loan to the earlier of (i) 270 days after the issuance of the ROD, (ii) the date on which the Purchase Agreement terminates, and (iii) the earlier of December 31, 2012 and the availability of the Term Loan.

 

The ROD deadline is extendable by up to three months to December 31, 2012, as discussed below.  The Purchase Agreement may be terminated by either party (provided the terminating party is not in default) if the closing of the second tranche (“Tranche 2”) has not occurred on or before the earlier of September 30, 2012 (unless the parties have agreed to the ROD Condition Extension date of December 31, 2012) or twelve months after the issuance of the ROD.

 

As discussed above, the second tranche will be for a purchase price of an additional $40.0 million.  Significant conditions to the closing of Tranche 2 include issuance of the ROD for the Mt. Hope Project by the BLM, approval of the plan of operations for the Mt. Hope Project (the “POO”) by the BLM, and the completion of documentation for and satisfaction of conditions precedent for the availability of funding under the Term Loan, described below.

 

Hanlong will have the right to purchase a portion of any additional shares of common stock that we issue so that it can maintain its percentage ownership, unless its ownership is at the time below 5% at the earlier of the closing of Tranche 2 or closing of the Term Loan.  It may also acquire additional shares so that it maintains a 20% indirect interest in the Mt. Hope Project if our interest in the LLC is reduced below 80%.  If we issue shares to fund the Mt. Hope Project under certain circumstances, and on or before the date of commercial production, and Hanlong exercises its rights to maintain its percentage interest, we will be obligated to refund to Hanlong the cost of such shares over a three-year period up to an aggregate of $9.0 million.

 

Break Fees.  A break fee is payable by both the Company and Hanlong if the Purchase Agreement terminates because of the failure of certain conditions.  A break fee of $10.0 million is payable to the Company if the Purchase Agreement is terminated because Hanlong fails to obtain necessary Chinese government approvals, which may be offset against any balances owed by the Company under the Bridge Loan.  A break fee of $5.0 million is payable to Hanlong if the ROD is not timely received or the condition waived and the Purchase Agreement is terminated.  The Company’s break fee may be increased by $5.0 million if the Purchase Agreement is terminated and the Company has violated the “no-shop” provisions of the Purchase Agreement.  The break fees may also be increased by up to $2.0 million if the Company requests and Hanlong grants an extension concerning the ROD (the “Extension Fee”).  Any such fee will be credited against the arrangement fee described below.  The break fee payable by the Company to Hanlong may be paid in cash, or, in certain circumstances, in shares of our common stock at our option.  If paid in shares, the price would be the volume weighted average of our common stock on the NYSE Amex for the five days ending six days after the announcement of the termination.  On January 9, 2012, the Company and Hanlong executed an option agreement concerning the Purchase Agreement for no consideration.  The option must be exercised on or before December 31, 2012.  If the option is exercised, the parties will amend the Purchase Agreement to extend payment of the Extension Fee from December 2012 until April 30, 2013.

 

Chinese Bank Term Loan.  Hanlong is obligated to use commercially reasonable efforts to procure a Term Loan in an amount of at least $665.0 million with a term of at least 14 years after commercial production begins at the Mt. Hope Project.  The Term Loan will bear interest at a rate tied to the London Interbank Offered Rate (“LIBOR”) plus a spread of between 2% and 4% per annum.  The Purchase Agreement provides that the Term Loan will have customary covenants and conditions; however, the terms of the Term Loan have not yet been negotiated with the lender and we have no assurance as to the final terms of the Term Loan.  On February 16, 2012, the Company announced China Development Bank (“CDB”) had confirmed the basic terms underlying a proposed $665 million term loan to finance the Mt. Hope project, including a CDB commitment to lend $399 million and arrange a consortium of Chinese and international banks to fund the balance.  The term loan is anticipated to carry a maturity of 12 years including a 30 month grace period to allow for the construction of the Mt. Hope project.  The interest rate will remain subject to market conditions and Chinese government policy..  The Company and Hanlong are continuing to work with CDB with a target of having the loan completed, approved and available to the Company upon receipt of Mt. Hope’s operating permits.  Hanlong or an affiliate is obligated to guarantee the Term Loan.  When funds can be drawn by the Company under the Term Loan, the Company will pay a $15.0 million arrangement fee to Hanlong who will pay fees and expenses associated with the Term Loan before the Term Loan Closing, including those charged by the Chinese bank.

 

60



Table of Contents

 

Bridge Loan

 

Hanlong agreed to provide a $20.0 million Bridge Loan to the Company, available in two equal $10.0 million tranches.  On April 28, 2010, we drew down the first $10.0 million tranche.  The second tranche became available after receiving stockholder approval of the Hanlong Transaction.  The first tranche of the Bridge Loan bears interest at LIBOR plus 2% per annum.  The second tranche of the Bridge Loan will bear interest at 10% per annum and is undrawn.  The Bridge Loan will be repaid from the proceeds of the Term Loan.  The second tranche may also be repaid at the Company’s election, in shares of the Company’s common stock.  If paid in shares, the price would be the volume weighted average of the Company’s shares on the NYSE Amex for a five-day period after public announcement of the event that required repayment.  The Company may offset its right to receive the break fee against its obligations to repay borrowings under the Bridge Loan.  On January 9, 2012, the Company and Hanlong executed an option agreement concerning the Bridge Loan Agreement.  If exercised, the parties will amend the Bridge Loan Agreement for no consideration to extend the maturity date of Bridge Loan from December 31, 2012 until April 30, 2013.  The option also has the effect of potentially extending the availability of the undrawn $10.0 million second tranche to April 30, 2013 since the availability of the second tranche ends the earliest of the Tranche 2 closing date, the maturity of the Bridge Loan and the first borrowing under the Term Loan.

 

The outstanding balance of the Bridge Loan and related accrued interest are recorded as a current liability as of December 31, 2011 as the Company anticipates the Term Loan will become available within the next twelve months.  The Bridge Loan and our obligation to pay a break fee to Hanlong under the Purchase Agreement are secured by a pledge by us of a 10% interest in the LLC.

 

Stockholder Agreement

 

In connection with Hanlong’s purchase of our shares, Hanlong signed a Stockholder Agreement with the Company that limits Hanlong’s future acquisitions of our common stock, provides for designation of up to two directors to our Board and representation on the LLC management committee, and places some restrictions on Hanlong’s voting and disposition of our shares.

 

After the Tranche 1 closing, Hanlong became entitled to nominate one director to serve on our Board and one representative to the LLC management committee.  Nelson Chen currently serves in both of these capacities.  After the Tranche 2 closing, Hanlong will be entitled to nominate a second director.  The Company will include and recommend the election of Hanlong’s nominees in the Board’s slate of nominees submitted to our stockholders, subject to the Board’s fiduciary obligations and compliance by the nominee with applicable law and Company requirements concerning disclosure of information.  The Hanlong nominees may also serve on committees for which they are eligible.

 

Hanlong has agreed not to purchase additional shares, except as permitted by the Purchase Agreement, without the Company’s prior consent, and has agreed that it will not solicit proxies, join a group with respect to our equity securities, solicit or encourage an offer from another person for the Company, call a meeting of the Company’s stockholders or make a proposal to the Company’s stockholders, except to the Board.  If our Board receives an offer for the Company, for its assets or a merger that the Board determines is in the best interests of the Company’s stockholders, Hanlong is required to vote in favor of such a transaction or tender its shares unless it proposes an alternative transaction that our Board determines is more favorable to our stockholders than the offer received.

 

Hanlong may not, without the prior written consent of the Board, transfer ownership of their securities if the recipient would acquire beneficial ownership of more than 5% of our common stock as of the date of such transfer.  The restrictions on Hanlong’s share ownership, voting, disposition and drag-along rights will terminate on the earlier of the time that Hanlong owns less than 10% of our common stock, the date that is 6 months after the date that commercial production begins at the Mt. Hope Project, and June 30, 2014.

 

Cash Conservation Plan

 

The Company continues to operate under a cash conservation plan implemented in March 2009 designed to reduce expenditures and conserve cash in order to maximize financial flexibility.  We are now emerging out of cash conservation with the initiation of a soft start of engineering and procurement in January 2012.

 

The Company had purchase orders for mining and milling process equipment.  Some orders for mining equipment were cancelled, while orders for electric shovels and haul trucks were modified to become cancellable or non-binding.  Most equipment orders for the custom-built grinding and other milling process equipment are being completed by the manufacturers and the equipment is being stored.  The grinding and milling process equipment required the longest lead

 

61



Table of Contents

 

times and maintaining these orders was critical to the Company’s ability to rapidly restart the Mt. Hope Project development.  The Company completed negotiations with other equipment manufacturers to suspend or terminate fabrication of other milling equipment.  As funding becomes available and equipment procurement is restarted, agreements that were suspended or terminated will be renegotiated under new market terms and conditions, as necessary.

 

Based on our current plan, expected timetable, and the results of such negotiations, we expect to make additional payments on milling process equipment orders of approximately $3.7 million in 2012 and $13.0 million in 2013.  Based on payments made in 2009, 2010, and 2011 and the final payments to be made in 2012 and early 2013 for the gyratory crusher, SAG and ball mills and related electric mill drives, and some other long-lead equipment, we will own this equipment.  Also, at December 31, 2011, we have a contract to purchase two electric shovels that is cancellable, has no firm schedule of payments, and includes a $3.4 million deposit that is forfeitable if an additional $13.0 million deposit is not made by June 30, 2012.  The LLC continues to need this equipment for construction phase mine development and post-construction mining, and is committed to either renegotiate the timing and amount of the contractual deposit terms to provide more payment flexibility or obtaining additional funding sources in order to make this payment without impacting our liquidity position.

 

On February 28, the LLC issued a firm purchase order for 18 haul trucks to Cashman Equipment Company, the Nevada-based dealer for Caterpillar.  The order provides for delivery of those haul trucks required to perform initial mine development, currently scheduled for the second half of 2013.  A non-refundable down-payment of $0.6 million was made at the time of order with an additional $0.6 million due 12 months prior to truck shipment, but the contract is cancellable with no further liability to the LLC up until the time of truck shipment.  An additional 6 haul trucks are not required until after the commencement of commercial production, and will be ordered at a future date.

 

The cash conservation plan has reduced our total cash utilization for general administrative and overhead expenses to approximately $1 million per month, inclusive of maintenance costs at the Liberty Property.  Such ongoing costs, combined with the $3.7 million in process equipment commitments noted above and the $9.0 million in construction royalty advances described in Note 10 comprise the spending requirements the Company has in place through the end of 2012 without restarting the project.  Based on our current cash on hand and this ongoing cash conservation plan, the Company expects it will have adequate liquidity through the restart of the project and execution of the financing plan.

 

NOTE 3 — SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES

 

This summary of significant accounting policies is presented to assist in understanding the financial statements.  The financial statements and notes are representations of the Company’s management, which is responsible for their integrity and objectivity.  These accounting policies conform to accounting principles generally accepted in the United States of America (“GAAP”) and have been consistently applied in the preparation of the financial statements.

 

Accounting Method

 

Our financial statements are prepared using the accrual basis of accounting in accordance with GAAP.  With the exception of the LLC, all of our subsidiaries are wholly owned.  In February 2008, we entered into the agreement, which established our ownership interest in the LLC at 80%.  The consolidated financial statements include all of our wholly owned subsidiaries and the LLC.  The POS-Minerals contributions attributable to their 20% interest are shown as Contingently Redeemable Noncontrolling Interest on the Consolidated Balance Sheet.  For the years presented , the LLC had net operating expenses and, accordingly, the net loss attributable to contingently redeemable noncontrolling interest is reflected separately on the Consolidated Statement of Operations.

 

Reclassification of Prior Period Amounts

 

Certain prior period amounts have been reclassified to conform to the current period presentation.

 

Contingently Redeemable Noncontrolling Interest (“CRNCI”)

 

On January 1, 2009, we adopted Financial Accounting Standards Board (“FASB”) authoritative guidance related to Noncontrolling Interests in Consolidated Financial Statements, the provisions of which, among others, require the recognition of a noncontrolling interest (previously referred to as minority interest), as a component of equity in the consolidated financial statements and separate from the parent’s equity for all periods presented. In addition, the amount of net income or loss attributable to the noncontrolling interest is included in net income or loss on the face of the consolidated statement of operations.  Under GAAP, certain noncontrolling interests in consolidated entities meet the definition of mandatorily redeemable financial instruments if the ability to redeem the interest is outside of the control of the consolidating entity.  As

 

62



Table of Contents

 

described in Note 1, the LLC Agreement permits POS-Minerals the option to put its interest in the LLC to Nevada Moly upon a change of control, as defined in the LLC Agreement, followed by a failure to use standard mining industry practice in connection with development and operation of the Mt. Hope Project as contemplated by the parties for a period of twelve consecutive months.  As such, the CRNCI has continued to be shown as a separate caption between liabilities and equity (mezzanine section).  The carrying value of the CRNCI reflects the investment of the noncontrolling interest, less losses attributable to the interest.

 

Estimates

 

The process of preparing consolidated financial statements requires the use of estimates and assumptions regarding certain types of assets, liabilities, revenues, and expenses.  Such estimates primarily relate to unsettled transactions and events as of the date of the financial statements.  Accordingly, upon settlement, actual results may differ from estimated amounts.

 

Cash and Cash Equivalents

 

We consider all highly liquid investments with original maturities of three months or less to be cash equivalents. The Company’s cash equivalent instruments are classified within Level 1 of the fair value hierarchy established by FASB guidance for Fair Value Measurements because they are valued based on quoted market prices in active markets.

 

Exploration and Development Stage Activities

 

We were in the exploration stage from January 2002 until October 4, 2007.  On October 4, 2007, our Board approved the development of the Mt. Hope Project as contemplated in the Bankable Feasibility Study (“BFS”) and we then entered into the development stage.  We have not realized any revenue from operations.  We will be primarily engaged in development of the Mt. Hope Project and exploration and evaluation of the Liberty Property until we enter the production stage of the Mt. Hope Project.

 

Basic and Diluted Net Loss Per Share

 

Net loss per share was computed by dividing the net loss attributable to General Moly, Inc. by the weighted average number of shares outstanding during the period.  The weighted average number of shares was calculated by taking the number of shares outstanding and weighting them by the amount of time that they were outstanding.  Outstanding warrants to purchase 1,000,000, 6,263,209 and 7,455,434 shares of common stock, options to purchase 2,484,990, 2,658,323 and 3,071,656 shares of common stock, and unvested stock awards totaling 615,763, 421,726 and 217,694 at December 31, 2011, 2010 and 2009, respectively, and 1,290,499 and 912,461 and 36,349 shares under Stock Appreciation Rights (“SARs”) at December 31, 2011, 2010, and 2009 respectively, were not included in the computation of diluted loss per share for the years ended December 31, 2011, 2010 and 2009, respectively, because to do so would have been anti-dilutive.  Therefore, basic loss per share is the same as diluted loss per share.

 

Mineral Exploration and Development Costs

 

All exploration expenditures are expensed as incurred.  Significant property acquisition payments for active exploration properties are capitalized.  If no economic ore body is discovered, previously capitalized costs are expensed in the period the property is abandoned.  Expenditures to develop new mines, to define further mineralization in existing ore bodies, and to expand the capacity of operating mines, are capitalized and amortized on a units-of-production basis over proven and probable reserves.

 

Should a property be abandoned, its capitalized costs are charged to operations.  The Company charges to the consolidated statement of operations the allocable portion of capitalized costs attributable to properties sold.  Capitalized costs are allocated to properties sold based on the proportion of claims sold to the claims remaining within the project area.

 

Mining Properties, Land and Water Rights

 

Costs of acquiring and developing mining properties, land and water rights are capitalized as appropriate by project area.  Exploration and related costs and costs to maintain mining properties, land and water rights are expensed as incurred while the property is in the exploration and evaluation stage.  Development and related costs and costs to maintain mining properties, land and water rights are capitalized as incurred while the property is in the development stage.  When a property reaches the production stage, the related capitalized costs are amortized using the units-of-production basis over proven and

 

63



Table of Contents

 

probable reserves.  Mining properties, land and water rights are periodically assessed for impairment of value, and any subsequent losses are charged to operations at the time of impairment.  If a property is abandoned or sold, a gain or loss is recognized and included in the consolidated statement of operations.

 

Depreciation and Amortization

 

Property and equipment are recorded at cost and depreciated using the straight-line method over the estimated useful lives of the assets.  Property and equipment are depreciated using the following estimated useful lives: field equipment — four to ten years; office furniture, fixtures; and equipment — five to seven years; vehicles — three to five years; leasehold improvements — three years or the term of the lease, whichever is shorter; residential trailers — ten to twenty years; and buildings and improvements — ten to twenty seven and one-half years.  At December 31, 2011 and 2010, accumulated depreciation and amortization was $1.4 and $1.0 million, respectively, of which $1.1 and $0.7 million, respectively, was capitalized.

 

Provision for Taxes

 

Income taxes are provided based upon the asset and liability method of accounting.  Under this approach, deferred income taxes are recorded to reflect the tax consequences in future years of differences between the tax basis of assets and liabilities and their financial reporting amounts at each year-end.  In accordance with authoritative guidance for Income Taxes, a valuation allowance is recorded against the deferred tax asset if management does not believe the Company has met the “more likely than not” standard to allow recognition of such an asset.

 

Reclamation and Remediation

 

Expenditures for ongoing compliance with environmental regulations that relate to current operations are expensed or capitalized as appropriate.  Expenditures resulting from the remediation of existing conditions caused by past operations that do not contribute to future revenue generation are expensed.  Liabilities are recognized when environmental assessments indicate that remediation efforts are probable and the costs can be reasonably estimated.

 

Estimates of such liabilities are based upon currently available facts, existing technology and presently enacted laws and regulations taking into consideration the likely effects of inflation and other societal and economic factors, and include estimates of associated legal costs.  These amounts also reflect prior experience in remediating contaminated sites, other companies’ clean-up experience and data released by the United States Environmental Protection Agency (“EPA”) or other organizations.  Such estimates are by their nature imprecise and can be expected to be revised over time because of changes in government regulations, operations, technology and inflation.  Recoveries are evaluated separately from the liability. When recovery is assured, the Company records and reports an asset separately from the associated liability.

 

Stock-based Compensation

 

Stock-based compensation represents the fair value related to stock-based awards granted to members of the board of directors, officers and employees.  The Company uses the Black-Scholes model to determine the fair value of stock-based awards under authoritative guidance for Stock-Based Compensation.  For stock based compensation that is earned upon the satisfaction of a service condition, the cost is recognized on a straight-line basis (net of estimated forfeitures) over the requisite vesting period (up to three years).  Awards expire five years from the date of vesting.

 

Further information regarding stock-based compensation can be found in Note 7 — “Equity Incentives.”

 

Debt Issuance Costs

 

The Company has capitalized certain costs such as translation, formatting and technical due diligence and related legal fees in the amount of $3.1 million incurred in direct pursuit of the Term Loan based on our belief that it is more probable than not that the Company will receive the Term Loan.  A portion of these costs were incurred on behalf of Hanlong and will be offset against the $15.0 million arrangement fee to be paid by the Company to Hanlong upon the closing of the Term Loan.  These costs will be amortized over the life of the Term Loan using the effective interest method once the Term Loan has been made available.

 

64



Table of Contents

 

Comprehensive Loss

 

For the years ended December 31, 2011, 2010 and 2009, respectively, the Company’s comprehensive loss was equal to the respective net loss for each of the years presented.

 

Recently Issued Accounting Pronouncements

 

Fair Value Measurement (Topic 820): Amendments to Achieve Common Fair Value Measurement and Disclosure Requirements in U.S. GAAP and IFRS

 

In May 2011, the FASB issued Accounting Standards Update (ASU) 2011-04, Amendments to Achieve Common Fair Value Measurement and Disclosure Requirements in U.S. GAAP and IFRS. The Update amends fair value measurements and disclosures to (1) clarify the board’s intent in respect of existing measurement guidance, (2) revise certain measurement guidance that changes or modifies a principle, and (3) add disclosure requirements concerning the measurement uncertainty of level 3 measurements. This guidance is effective for the Company for the first interim or annual period beginning on or after December 15, 2011. The Company does not anticipate this guidance having a material effect on its financial condition, results of operation, or cash flows.

 

Comprehensive Income (Topic 220): Presentation of Comprehensive Income

 

In June 2011, the FASB issued Accounting Standards Update (ASU) 2011-02, Comprehensive Income (Topic 220): Presentation of Comprehensive Income.  Under the amendments, an entity has the option to present the total of comprehensive income, the components of net income, and the components of other comprehensive income either in a single continuous statement of comprehensive income or in two separate but consecutive statements. This guidance is effective for the Company for the fiscal year beginning after December 15, 2011. The Company does not anticipate this guidance having a material effect on its financial condition, results of operation, or cash flows.

 

NOTE 4 — MINING PROPERTIES, LAND AND WATER RIGHTS

 

We currently have interests in two mining properties that are the primary focus of our operations.  The Mt. Hope Project is currently in the development stage and the Liberty Property is in the exploration and evaluation stage.  We also have certain other, non-core, mining properties that are being evaluated for future evaluation or sale.

 

The Mt. Hope Project.  We are currently in the process of developing the Mt. Hope Project. In November 2004, we entered into an option to lease all property and assets of the Mt. Hope Molybdenum Property from Mt. Hope Mines, Inc. (“MHMI”) and in October 2005 exercised our rights under the option.  The lease was further amended in November 2007.  The renewable lease allows us to proceed for the next 30 years with permitting, developing and mining the deposit and for so long thereafter as we maintain an active operation.  In 2004, we paid $0.5 million and issued 500,000 shares of common stock with warrants to purchase 500,000 shares of common stock for the Mt. Hope option.

 

Pursuant to the terms of the lease, as amended, the underlying total royalty on production payable to MHMI, less certain deductions, is three and one-half percent for a molybdenum price up to $12 per pound, four and one-half percent for a molybdenum price up to $15 per pound, and five percent for a molybdenum price above $15 per pound (“Production Royalties”).  The LLC is subject to certain periodic payments as set forth in Note 10 “Commitments and Contingencies.”  Additionally, the LLC is obligated to pay Exxon Mineral Company a one percent net smelter royalty on all production.

 

During the year ended December 31, 2006, we purchased deeded land, which included certain BLM grazing rights, certain water rights and various other assets.  The primary purpose for these purchases was to acquire land and water rights for use by the Mt. Hope Project.  We paid $2.3 million cash for these purchases.

 

During the year ended December 31, 2007, we purchased land, water rights and various personal property for cash of $4.6 million and 67,000 shares of common stock valued at $0.4 million.  The primary purpose of these purchases was to acquire additional land and water rights for the Mt. Hope Project.

 

In August 2007, the Company completed a BFS on the Mt. Hope Project, which provided data on the viability and expected economics of the project.  Based on the findings in the study, on a 100% basis, we reported 1.3 billion pounds of contained (1.1 billion pounds recoverable) molybdenum in proven and probable reserves.

 

65



Table of Contents

 

In October 2007, our Board approved the transition of the Mt. Hope Project into the development phase and authorized management to proceed with the execution of the project as outlined in the BFS.

 

Liberty Property.  We are currently in the process of exploration and evaluation of the Liberty Property.

 

In March 2006 we purchased a portion of the Liberty Property,  an approximately ten square mile property in Nye County, Nevada, including water rights, mineral and surface rights, buildings and certain equipment from High Desert Winds LLC (“High Desert”) pursuant to a purchase agreement.  At closing, we paid High Desert a cash payment of $4.5 million for the portion of the Liberty Property that we purchased and made an additional payment of $1.0 million in November of 2006 for the purchase of the remaining portion of High Desert’s interest in this property for the total purchase price of $5.5 million including buildings and equipment at the Liberty site.  The primary purpose of the Liberty purchase was to further the Company’s strategy of exploring and developing other potential molybdenum properties.

 

At December 31, 2006, the Liberty Property was subject to a 12 percent royalty payable with respect to the net revenues generated from molybdenum or copper minerals removed from the properties purchased.  In January 2007, we completed the acquisition of all of the issued and outstanding shares of the corporation that held the 12 percent net smelter royalty interest in the mineral rights of the Liberty Property and, as a result of this purchase, we now own the Liberty Property and all associated mineral rights.  We paid approximately $3.7 million in cash at closing, net of cash acquired of $1.2 million.  At first commercial production of the property, we have agreed to pay an additional $6.0 million.  Because we cannot determine beyond a reasonable probability that the mine will attain commercial production, the Company has not recognized the $6.0 million liability in its financial statements.  In connection with the acquisition, we also received restricted cash totaling $0.5 million and assumed reclamation and remediation costs, accounts payable and accrued liabilities of $0.3 million.

 

During the year ended December 31, 2007, we purchased a patented lode mining claim adjacent to the Liberty Property for $0.2 million cash and completed the purchase of certain patented lode mining claims referred to as the Liberty Claims on property adjacent to the Liberty Property for cash of $0.1 million and 150,000 shares of common stock valued at $0.4 million.  These two acquisitions of mining claims were completed to control additional mineral rights needed for the development of the Liberty Property.  We currently believe that we have all the mineral, water and surface rights necessary to develop the Liberty Property.

 

Other Mining Properties.  We also have mining claims and land purchased prior to 2006 which consist in part of (a) approximately 107 acres of fee simple land in the Little Pine Creek area of Shoshone County, Idaho, (b) six patented mining claims known as the Chicago-London group, located near the town of Murray in Shoshone County, Idaho, (c) 265 acres of private land with three unpatented claims in Josephine County, Oregon, known as the Turner Gold project, and (d) an undivided 50% interest in the reserved mineral rights known as the Margaret Property and 105 unpatented mining claims comprising the Red Bonanza Property, situated in the St. Helens Mining District, Skamania County, Washington, and (e) 34 unpatented mining claims in Marion County, Oregon, known as the Detroit property.

 

Summary.  The following is a summary of mining properties, land and water rights at December 31, 2011 and 2010 (in thousands):

 

 

 

At
December 31,
2011

 

At
 December 31,
 2010

 

Mt. Hope Project:

 

 

 

 

 

Development costs

 

$

99,984

 

$

89,602

 

Mineral, land and water rights

 

10,526

 

10,253

 

Advance Royalties

 

22,600

 

22,600

 

Total Mt. Hope Project

 

133,110

 

122,445

 

Total Liberty Property

 

9,733

 

9,749

 

Other Properties

 

889

 

889

 

Total

 

$

143,732

 

$

133,093

 

 

On June 26, 2009, the Company and Josephine Mining Corp. (“JMC”), a privately-owned Canadian company whose president is a related party to a member of the Company’s Board of Directors, entered into an Option to Purchase Agreement for the Company’s non-core Turner Gold property, a multi-metallic property located in Josephine County, Oregon. The Company acquired the property in 2004.  JMC paid $0.1 million upon entering into the agreement, an additional $0.3 million

 

66



Table of Contents

 

in January 2011, and an additional $0.3 million in December 2011.  Once made, each option payment is non-refundable and will be applied to the purchase price at the completion of the agreement. The $0.7 million has been recorded as a deferred gain pending completion of the purchase.  On September 30, 2011, the Company and JMC executed an amendment to the original agreement indicating that JMC had acquired certain properties within a two-mile radius of the Turner Gold property.  The Company and JMC executed an additional amendment on the same date allowing JMC to extend the payment date for the third and final installment payment by making the payment of $300,000 noted above in December 2011.  Under the terms of the amendment, $250,000 of the third payment shall apply to the purchase price of $2.0 million with the remaining $50,000 considered a deferral fee.  The remaining payment of $1,350,000 shall be due at the earlier of September 30, 2012 or upon receipt by JMC of all permits and approvals necessary to commence mining operations plus three months.  The periodic payments allow JMC certain exploratory rights.  Ownership of the Turner Gold property will transfer to JMC upon the final payment. The Company will also retain a production royalty of 1.5% of all net smelter returns on future production from the property, should JMC acquire the property.  The book value of the Company’s investment in the Turner Gold property is approximately $800,000.

 

On March 8, 2010, the Company and Ascot USA, Inc. (“Ascot”), a Washington corporation, entered into an Option to Purchase Agreement for the Company’s non-core Margaret property, an undivided 50% interest in the reserved mineral rights and all of the Company’s interest in the 105 unpatented mining claims comprising the Red Bonanza Property, situated in the St. Helens Mining District, Skamania County, Washington.  The Company acquired the property in 2004.  Ascot paid $0.1 million upon entering into the agreement and an additional $0.3 million in May 2011.  Once made, each option payment is non-refundable.  The $0.4 million has been recorded as a deferred gain pending completion of the purchase.  If Ascot proceeds, the final installment payment of $1.6 million is due on or before June 8, 2012.  The periodic payments allow Ascot certain exploratory rights.  If Ascot makes all three of the installment payments, ownership of the Margaret property will transfer to Ascot upon the final payment.  The Company will also retain a production royalty of 1.5% of all net smelter returns on future production from the property, should Ascot acquire the property.  The Company carries no book value in the property.

 

On September 30, 2011, the Company and Russell Mining & Minerals, Inc. (“RMMI”), a privately-owned company whose president is a related party to one of the Company’s Board members, entered into an Option to Purchase Agreement for the Company’s non-core Detroit Copper property, a multi-metallic property located in Marion County, Oregon. RMMI paid $0.1 million upon entering into the agreement. Once made, each option payment is non-refundable. The $0.1 million has been recorded as a deferred gain pending completion of the purchase. If RMMI proceeds, an additional $0.3 million installment payment is due March 31, 2013, and the final installment payment of $1.6 million is due on or before September 30, 2014. The final option payment may be extended by RMMI by up to two years by making non-refundable installment payments of $160,000 in each year to be extended.  These extension payments are not to be applied to the purchase price of the property.  The periodic payments allow RMMI certain exploratory rights.  If RMMI makes all three of the installment payments, ownership of the Detroit Copper property will transfer to RMMI upon the final payment. The Company has also retained a Production Royalty of 1.5% of all net smelter returns on future production from the property.  The Company currently carries no book value in the project.

 

Development costs and Deposits on project property, plant and equipment

 

Development costs of $100.0 million include hydrology and drilling costs, expenditures to further the permitting process, capitalized salaries, project engineering costs, and other expenditures required to fully develop the Mt. Hope Project.  Deposits on project property, plant and equipment of $66.5 million represent ongoing progress payments on equipment orders for the custom-built grinding and milling equipment, related electric mill drives, and other processing equipment that require the longest lead times.

 

Restricted Cash held for Electricity Transmission

 

The LLC has paid $12.0 million into an escrow arrangement for electricity transmission services.  The amount represents security on a transmission contract that will provide power to the Mt. Hope Project, and is accounted for as restricted cash.  All amounts escrowed are to be returned to the Company as electricity is delivered or on December 1, 2015, in the event that electricity transmission at the Mt. Hope Project has not commenced or at the time the agreement is cancelled by the Company.

 

67



Table of Contents

 

Writedowns of Development Costs and Deposits

 

The Company has written off approximately $3.4 million in deposits related to a contract for the purchase of electric shovels with the passage of a June 30, 2011 deadline for a firm purchase order.  The contract remains in place and the remaining $3.4 million forfeitable if an additional $13.0 million deposit is not made by June 30, 2012.  The LLC continues to need this equipment for construction phase mine development and post-construction mining, and is committed to either renegotiate the timing and amount of the contractual deposit terms to provide more payment flexibility or obtaining additional funding sources in order to make this payment without impacting our liquidity position.

 

At an open public meeting on July 6, 2010, the Eureka County Board of Commissioners (“the Commissioners”) signed documents to relinquish a land lease held by the LLC in Eureka County, Nevada (the “County”).  The LLC had planned to develop housing on the lease after receipt of ROD.  The relinquishment made the land available for more rapid housing development by the County.  The LLC had invested approximately $5.0 million in preliminary development costs for the property covered by the relinquished lease.  As a result of the relinquishment, the Company incurred a charge of $5.0 million in 2010, of which $1.0 million is attributable to our noncontrolling interest.  In addition, the County returned a $0.1 million cash deposit to the Company.

 

NOTE 5 — COMMON STOCK UNITS, COMMON STOCK AND COMMON STOCK WARRANTS

 

Year ended December 31, 2011

 

During the year ended December 31, 2011, options representing 133,333 shares and warrants representing 5,183,209 shares were exercised for cash in the amount of $0.4 and $19.1 million, respectively.  We issued 24,547 shares of common stock upon the cashless exercise of warrants, 70,175 shares of common stock pursuant to stock awards, and 53,511 shares of common stock upon the exercise of stock appreciation rights.

 

Year ended December 31, 2010

 

During the year ended December 31, 2010 options representing 20,000 shares and warrants representing 812,500 shares were exercised for cash in the amount of $0.1 million and $3.0 million, respectively.  We issued 59,770 shares of common stock upon the cashless exercise of warrants, 24,074 shares of common stock upon the cashless exercise of options and 156,250 shares of common stock pursuant to stock awards.

 

Year ended December 31, 2009

 

During the year ended December 31, 2009 options representing 100,000 shares were exercised for cash in the amount of $0.1 million.  We also issued 502,225 shares of common stock pursuant to stock awards.

 

The following is a summary of common stock warrant activity for each of the three years ended December 31, 2011:

 

 

 

Number of
Shares
Under
Warrants

 

Exercise Price

 

Balance at December 31, 2008

 

7,455,434

 

$3.75 to $10.00

 

Activity for the year ended December 31, 2009

 

 

 

Balance at December 31, 2009

 

7,455,434

 

$3.75 to $10.00

 

Exercised for cash

 

(812,500

)

3.75

 

Exercised in cashless exchange

 

(379,725

)

3.75

 

Balance at December 31, 2010 (1)

 

6,263,209

 

$3.66 to $10.00

 

Exercised for cash

 

(5,183,209

)

3.66 to $3.75

 

Exercised in cashless exchange

 

(80,000

)

3.75

 

Balance at December 31, 2011

 

1,000,000

 

$

5.00

 

Weighted average exercise price

 

$

5.00

 

 

 

 


(1)          See discussion below related to repricing of warrants during 2010 resulting in a change in the exercise price from $3.75 to $3.66 and $10.00 to $5.00.

 

68



Table of Contents

 

Coghill Capital Management and its affiliates (“Coghill”), a significant stockholder in the Company, provided substantial assistance to the Company with the signing of the Consent and Waiver Agreement and the Extension Agreement with ArcelorMittal.  In recognition of that support, on April 16, 2010, the Company amended and restated warrants issued to Coghill to purchase one million shares of the Company’s common stock issued in connection with the November 2007 private placement and original molybdenum supply agreement with ArcelorMittal to reduce the price of the warrants from $10.00 per share to $5.00 per share.  The incremental cost of the reissued warrants was $0.6 million, which was recorded as expense in 2010.  The warrants remain exercisable once the Company has received financing necessary for the commencement of commercial production at the Mt. Hope Project and will expire one year thereafter.  It will also become exercisable in the event of certain corporate reorganizations.

 

On December 21, 2010, the Company amended and restated warrants issued to Coghill to purchase 4.3 million shares of the Company’s common stock issued in connection with a February 2006 private placement to reduce the price of the warrants from $3.75 per share to $3.66 per share provided that the warrants were exercised on or before January 3, 2011.  The incremental cost of the reissued warrants was $0.4 million, which was recorded as expense in 2010.  On January 3, 2011, Coghill exercised the warrants for $15.6 million.

 

All warrants outstanding at December 31, 2011 are exercisable at $5.00 per share once General Moly has received financing necessary for the commencement of commercial production at the Mt. Hope Project and will expire one year thereafter.

 

Pursuant to our Certificate of Incorporation, we are authorized to issue 200,000,000 shares of $0.001 par value common stock.  All shares have equal voting rights, are non-assessable and have one vote per share.  Voting rights are not cumulative and therefore, the holders of more than 50% of the common stock could, if they choose to do so, elect all of the directors of the Company.

 

NOTE 6 — PREFERRED STOCK

 

Pursuant to our Certificate of Incorporation we are authorized to issue 10,000,000 shares of $0.001 per share par value preferred stock.  The authorized but unissued shares of preferred stock may be issued in designated series from time to time by one or more resolutions adopted by the Board.  The Board has the authority to determine the preferences, limitations and relative rights of each series of preferred stock.  At December 31, 2011, and 2010, no shares of preferred stock were issued or outstanding.  Subject to certain exceptions, if any person becomes the beneficial owner of 20% or more of the Company’s common stock, each right will entitle the holder, other than the acquiring person, to purchase Company common stock or common stock of the acquiring person having a value of twice the exercise price.  In addition, if there is a business combination between the Company and the acquiring person, or in certain other circumstances, each right that is not previously exercised will entitle the owner (other than the acquiring person) to purchase shares of common stock (or an equivalent equity interest) of the acquiring person at one-half the market price of those shares.

 

NOTE 7 — EQUITY INCENTIVES

 

In 2006, the Board and shareholders of the Company approved the 2006 Equity Incentive Plan (“2006 Plan”) that replaced the 2003 Equity Incentive Plan (“2003 Plan”).  In May 2010, our shareholders approved an amendment to the 2006 Plan increasing the number of shares that may be issued under the plan by 4,500,000 shares to 9,600,000 shares.  The 2006 Plan authorizes the Board, or a committee of the Board, to issue or transfer up to an aggregate of 9,600,000 shares of common stock, of which 3,390,693 remain available for issuance as of December 31, 2011.  Awards under the 2006 Plan may include incentive stock options, non-statutory stock options, restricted stock units, restricted stock awards, and stock appreciation rights (“SARs”).  At the option of the Board, SARs may be settled with cash, shares, or a combination of cash and shares.  The Company settles the exercise of other stock-based compensation with newly issued common shares.

 

Stock-based compensation cost is estimated at the grant date based on the award’s fair value as calculated by the Black-Scholes option pricing model and is recognized as compensation ratably on a straight-line basis over the requisite vesting/service period.  As of December 31, 2011, there was $3.3 million of total unrecognized compensation cost related to share-based compensation arrangements, which is expected to be recognized over a weighted-average period of 1.6 years.

 

Stock Options and Stock Appreciation Rights

 

All stock options and stock appreciation rights (“SARs”) are approved prior to or on the date of grant.  Stock options and SARs are granted at an exercise price equal to or greater than the Company’s closing stock price on the date of grant.  Both award types vest over a period of zero to three years with a contractual term of five years after vesting.  The Company

 

69



Table of Contents

 

estimates the fair value of stock options and SARs using the Black-Scholes valuation model.  Key inputs and assumptions used to estimate the fair value of stock options and SARs include the grant price of the award, expected option term, volatility of the Company’s stock, the risk-free rate and the Company’s dividend yield.  The following table presents the weighted-average assumptions used in the valuation and the resulting weighted-average fair value per option or SAR granted:

 

For the Year Ended December 31:

 

2011

 

2010

 

2009

 

Expected Life *

 

3.5 to 5.5 years

 

3.5 to 5.5 years

 

3.5 to 5.5 years

 

Interest Rate+

 

0.39% to 2.84%

 

0.67% to 2.58%

 

0.3% to 1.80%

 

Volatility **+

 

86.39% to 95.57%

 

90.0% to 95.48%

 

93.02% to 122.93%

 

Dividend Yields

 

 

 

 

Weighted Average Fair Value of Stock Options Granted During the Year

 

$

 

$

 

$

0.95

 

Weighted Average Fair Value of Stock Appreciation Rights Granted During the Year

 

$

2.25

 

$

3.45

 

$

0.56

 

 


*   The expected life is the number of years that the Company estimates, based upon history, that options or SARs will be outstanding prior to exercise or forfeiture.

* * The Company’s estimates of expected volatility are principally based on the historic volatility of the Company’s common stock over the most recent period commensurate with the estimated expected life of the Company’s stock options and other relevant factors.

+The interest rate and volatility used by the Company in calculating stock compensation expense represent the values in effect at the date of grant for all awards.  These values are periodically updated for stock appreciation rights, which may be settled in cash to reflect the current market conditions.

 

At December 31, 2011, the aggregate intrinsic value of outstanding and exercisable (fully vested) options and SARs was $0.9 million and had a weighted-average remaining contractual term of 3.4 years.  The total intrinsic value of options exercised during the years ended December 31, 2011, 2010 and 2009 was $0.3 million, nil, and $0.2 million, respectively.  The total intrinsic value of SARs exercised during the year ended December 31, 2011,2010 and 2009 was $0.3 million, nil and nil, respectively.

 

Restricted Stock Units and Stock Awards

 

Grants of restricted stock units and stock awards (“Stock Awards”) have been made to Board members, officers, and employees.  Stock Awards have been granted as performance based, earned over a required service period, or to Board members and the Company Secretary without any service requirement.  Time based grants for officers and employees generally vest and stock is received without restriction to the extent of one-third of the granted stock for each year following the date of grant.  Also, time based grants were offered to certain employees in connection with the cash conservation plan and vested over a period of approximately 19 months.  Performance based grants are recognized as compensation based on the probable outcome of achieving the performance condition.  Past compensation for Stock Awards issued to members of the Board of Directors that vested over time were recognized over the vesting period of one to two years.  Stock Awards issued to members of the Board of Directors and the Company Secretary that are fully vested at the time of issue are recognized as compensation upon grant of the award.

 

The compensation expense recognized by the Company for Stock Awards is based on the closing market price of the Company’s common stock on the date of grant.  For the years ended December 31, 2011, 2010 and 2009 the weighted-average grant-date fair value for Stock Awards was $4.32, $3.99, and $2.26, respectively.

 

Summary of Equity Incentive Awards

 

The following table summarizes activity under the Plans during the year ended December 31, 2011:

 

70



Table of Contents

 

 

 

Stock Options

 

SARs

 

Stock Awards

 

 

 

Weighted
Average
Exercise
Price

 

Number of Shares
Under Option

 

Weighted
Average
Strike
Price

 

Number
of Shares
Under
Option

 

Weighted
Average
Grant
Price

 

Number of
Shares

 

Balance at January 1, 2011

 

$

5.38

 

2,658,323

 

$

3.09

 

912,461

 

$

4.24

 

800,392

 

Awards Granted

 

 

 

3.28

 

492,894

 

4.32

 

428,073

 

Awards Exercised or Earned

 

2.69

 

(133,333

)

1.80

 

(79,809

)

3.63

 

(576,035

)

Awards Forfeited

 

8.67

 

(26,667

)

4.34

 

(35,047

)

3.55

 

(36,667

)

Awards Expired

 

11.45

 

(13,333

)

 

 

 

 

Balance at December 31, 2011

 

$

5.46

 

2,484,990

 

$

3.21

 

1,290,499

 

$

5.39

 

615,763

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Exercisable at December 31, 2011

 

$

5.40

 

2,329,990

 

$

1.97

 

350,284

 

 

 

 

 

 

A summary of the status of the non-vested awards as of December 31, 2011 and changes during the year ended December 31, 2011 is presented below.

 

 

 

Stock Options

 

SARs

 

Stock Awards

 

 

 

Weighted
Average
Fair
Value

 

Number of Shares
Under Option

 

Weighted
Average
Fair
Value

 

Number
of Shares
Under
Option

 

Weighted
Average
Fair
Value

 

Number of
Shares

 

Balance at January 1, 2011

 

$

4.40

 

285,002

 

$

4.09

 

707,941

 

$

4.24

 

800,392

 

Awards Granted

 

 

 

3.28

 

492,894

 

4.32

 

428,073

 

Awards Vested or Earned

 

8.34

 

(103,335

)

1.94

 

(225,573

)

3.63

 

(576,035

)

Awards Forfeited

 

8.67

 

(26,667

)

4.34

 

(35,047

)

3.55

 

(36,667

)

Balance at December 31, 2011

 

$

6.25

 

155,000

 

$

3.67

 

940,215

 

$

5.39

 

615,763

 

 

Compensation Cost Recognized and Capitalized Related to Equity Incentives

 

Summary of Compensation Cost Recognized and
Capitalized related to Equity Incentives for the
Year Ended December 31 (in thousands):

 

2011

 

2010

 

2009

 

Stock Options*

 

$

(49

)

$

154

 

$

1,389

 

SARs

 

 

 

 

 

 

 

Performance based

 

204

 

23

 

 

Vesting over time

 

574

 

1,243

 

470

 

Forfeitures related to restructuring

 

 

 

(567

)

Stock Awards:

 

 

 

 

 

 

 

Performance based*

 

(75

)

12

 

 

Vesting over time

 

507

 

821

 

487

 

Board of Directors and Secretary

 

810

 

509

 

644

 

Total

 

$

1,971

 

$

2,762

 

$

2,423

 

Included in:

 

 

 

 

 

 

 

Capitalized as Development

 

258

 

1,121

 

950

 

Expensed

 

1,713

 

1,641

 

1,473

 

 

 

$

1,971

 

$

2,762

 

$

2,423

 

 


*                                   The Company recorded significant forfeitures during 2011 related to unvested options of terminated employees and performance-based restricted shares forfeited as a result of the failure to achieve certain associated milestones required for vesting.

 

Taxes

 

A portion of the Company’s granted options are intended to qualify as incentive stock options (“ISO”) for income tax purposes.  As such, a tax benefit is not recorded at the time the compensation cost related to the options is recorded for

 

71



Table of Contents

 

book purposes due to the fact that an ISO does not ordinarily result in a tax benefit unless there is a disqualifying disposition.  Stock option grants of non-qualified options result in the creation of a deferred tax asset, which is a temporary difference, until the time that the option is exercised.  Any excess tax benefits from non-qualified stock option exercises are not recorded until the tax deduction reduces income tax payable.

 

NOTE 8 — CHANGES IN CONTINGENTLY REDEEMABLE NONCONTROLLING INTEREST AND EQUITY

 

 

 

Activity for
Year Ended

 

Changes in Contingently Redeemable Noncontrolling
Interest (Dollars in thousands)

 

December 31,
2011

 

December 31,
2010

 

December 31,
2009

 

Total Contingently Redeemable Noncontrolling Interest January 1, 2011, 2010, & 2009, respectively

 

$

98,753

 

$

99,761

 

$

100,000

 

Less: Net Loss Attributable to Contingently Redeemable Noncontrolling Interest

 

(680

)

(1,008

)

(239

)

Total Contingently Redeemable Noncontrolling Interest December 31, 2011, 2010, & 2009, respectively

 

$

98,073

 

$

98,753

 

$

99,761

 

 

NOTE 9 — INCOME TAXES

 

At December 31, 2011 and 2010 we had deferred tax assets principally arising from the net operating loss carry-forwards for income tax purposes multiplied by an expected rate of 35%. As management of the Company cannot determine that it is more likely than not that we will realize the benefit of the deferred tax assets, a valuation allowance equal to the net deferred tax asset has been established at December 31, 2011 and 2010. The significant components of the deferred tax asset at December 31, 2011 and 2010 were as follows (in thousands):

 

 

 

December 31,
2011

 

December 31,
2010

 

Operating loss carry forward

 

$

143,412

 

$

110,306

 

Unamortized exploration expense

 

11,546

 

11,572

 

Fixed asset depreciation

 

109

 

(37

)

Deductible stock based compensation

 

3,835

 

2,275

 

Other

 

251

 

0

 

Deductible temporary difference

 

$

159,153

 

$

124,116

 

Taxable temporary difference — Investment in Eureka Moly, LLC

 

$

(64,979

)

$

(41,917

)

Net deductible temporary difference

 

$

94,174

 

$

82,199

 

Deferred tax asset

 

$

32,961

 

$

28,770

 

Deferred tax asset valuation allowance

 

$

(32,961

)

$

(28,770

)

Net deferred tax asset

 

$

 

$

 

 

At December 31, 2011 and 2010 we had net operating loss carry-forwards of approximately $143.4 million and $110.3 million, respectively, which expire in the years 2017 through 2031.  The change in the allowance account from December 31, 2010 to December 31, 2011 was $4.2 million and the change between December 31, 2010 and December 31, 2009 was $3.8 million.

 

As of December 31, 2011 and 2010, the Company had no unrecognized tax benefits.  There was no change in the amount of unrecognized tax benefits as a result of tax positions taken during the year or in prior periods or due to settlements with taxing authorities or lapses of applicable statues of limitations.  The Company is open to federal and state tax audits until the applicable statutes of limitations expire.

 

72



Table of Contents

 

NOTE 10 — COMMITMENTS AND CONTINGENCIES

 

Mt. Hope Project

 

The Mt. Hope Lease may be terminated upon the expiration of its 30-year term, earlier at the election of the LLC, or upon a material breach of the agreement and failure to cure such breach.  If the LLC terminates the lease, termination is effective 30 days after receipt by MHMI of written notice to terminate the Mt. Hope Lease and no further payments would be due to MHMI.  In order to maintain the lease, the LLC must pay certain deferral fees and advance royalties as discussed below.

 

The Mt. Hope Lease Agreement requires a royalty advance (“Construction Royalty Advance”) of 3% of certain construction capital costs, as defined in the Mt. Hope Lease.  The LLC is obligated to pay a portion of the Construction Royalty Advance each time capital is raised for the Mt. Hope Project based on 3% of the expected capital to be used for those certain construction capital costs defined in the lease.  Through December 31, 2011, we have paid $13.7 million of the total Construction Royalty Advance.  We paid $0.6 million in early 2011 as a result of the exercise of outstanding warrants and another $9.0 million in October 2011.  Based on our Project Capital Estimate we estimate that an additional $9.0 million must be paid on or before October 19, 2012, which amount has been accrued.

 

Once the Construction Royalty Advance has been paid in full, the LLC is obligated to pay an advance royalty (“Annual Advance Royalty”) each October 19 thereafter in the amount of $0.5 million per year.  The Construction Royalty Advance and the Annual Advance Royalty are collectively referred to as the “Advance Royalties.”  All Advance Royalties are credited against the MHMI Production Royalties (as hereinafter defined) once the mine has achieved commercial production.  After the mine begins production, the LLC estimates that the Production Royalties will be in excess of the Annual Advance Royalties for the life of the project and, further, the Construction Royalty Advance will be fully recovered (credited against MHMI Production Royalties) by the end of the third year of commercial production.

 

Deposits on project property, plant and equipment

 

At December 31, 2011, we have active orders with varying stages of fabrication on milling process equipment comprised of two 230kV primary transformers and substation, a primary crusher, a semi-autogenous mill, two ball mills, and various motors for the mills.  We have suspended fabrication on 16 flotation cells, lime slaking equipment, hydrocyclones, and other smaller milling process equipment with the ability to re-initiate fabrication at any time.  We have completed negotiations with the manufacturer of two multi-hearth molybdenum roasters to terminate its fabrication of this equipment and receive finished goods of the partially completed order.  We plan to re-establish a new purchase order with this manufacturer as financing becomes available and equipment procurement is restarted under then current market terms and conditions.

 

The following table sets forth the LLC’s cash commitments under mining and milling equipment contracts (collectively, “Purchase Contracts”) at December 31, 2011, excluding the $13.0 million deposit referenced below that would be required before June 30, 2012 on the electric shovels contract (in millions):

 

Year

 

As of
December 31,
2011

 

2012

 

3.7

 

2013 and thereafter

 

13.0

 

Total (1)

 

$

16.7

 

 

73



Table of Contents

 


(1)         Also at December 31, 2011, we have a contract to purchase two electric shovels that is cancellable, has no firm schedule of payments, and includes a $3.4 million deposit that is forfeitable if an additional $13.0 million deposit is not made by June 30, 2012.  The LLC continues to need this equipment for construction phase mine development and post-construction mining, and is committed to either renegotiate the timing and amount of the contractual deposit terms to provide more payment flexibility or obtaining additional funding sources in order to make this payment without impacting our liquidity position.  If the LLC is unable to modify the terms to its satisfaction or obtain additional funding, and retain the equipment delivery commitment, the $3.4 million deposit will be considered impaired and written off on or prior to June 30, 2012.

 

On February 28, the LLC issued a firm purchase order for 18 haul trucks to Cashman Equipment Company, the Nevada-based dealer for Caterpillar.  The order provides for delivery of those haul trucks required to perform initial mine development, currently scheduled for the second half of 2013.  A non-refundable down-payment of $0.6 million was made at the time of order with an additional $0.6 million due 12 months prior to truck shipment, but the contract is cancellable with no further liability to the LLC up until the time of truck shipment.  An additional 6 haul trucks are not required until after the commencement of commercial production, and will be ordered at a future date.

 

Obligations under capital and operating leases

 

We have contractual obligations under capital and operating leases that will require a total of $0.4 million in payments over the next three years.  Assets under capital lease relate to light vehicles leased by the Company for use in operations.  Operating leases consist primarily of rents on office facilities and office equipment.  Our expected payments are $0.3 million, $0.1 million and nil for the years ended December 31, 2012, 2013 and 2014, respectively.  We incurred charges of $0.3 million as of December 31, 2011 in amortization on assets under capital lease.

 

Creation of Agricultural Sustainability Trust

 

On August 19, 2010, the LLC entered into an agreement with the Eureka Producers’ Cooperative (the “EPC”) whereby the LLC will fund a $4.0 million Sustainability Trust (the “Trust”) in exchange for the cooperation of the EPC with respect to the LLC’s water rights and permitting of the Mt. Hope Project.  The Trust will be tasked with developing and implementing programs that will serve to enhance the sustainability and well-being of the agricultural economy in the Diamond Valley Hydrographic Basin through reduced water consumption.

 

The Trust may be funded by the LLC over several years based on the achievement of certain milestones, which are considered probable, and as such $4.0 million has been accrued in the Company’s December, 2011, financial statements and is included in mining properties, land, and water rights.

 

Permitting Considerations

 

In the ordinary course of business, mining companies are required to seek governmental permits for expansion of existing operations or for the commencement of new operations. The LLC will be required to obtain a ROD from the BLM authorizing implementation of the Mt. Hope Project POO.  This approval can be obtained only after successful completion of the National Environmental Policy Act process of environmental evaluation, which incorporates substantial public comment.  The LLC will also need to obtain various state and federal permits including water protection, air quality, water rights and reclamation permits.  In addition to requiring permits for the development of the Mt. Hope Project, we will need to obtain and modify various mining and environmental permits during the life of the Mt. Hope Project.  Obtaining, modifying, and renewing the necessary governmental permits is a complex and time-consuming process involving numerous jurisdictions and often involving public hearings and substantial expenditures.  The duration and success of the LLC’s efforts to obtain, modify or renew permits will be contingent upon many variables, some of which are not within the LLC’s control.  Increased costs or delays could occur, depending on the nature of the activity to be permitted and the interpretation of applicable requirements implemented by the permitting authority.  All necessary permits may not be obtained and, if obtained, may not be renewed, or the costs involved in each case may exceed those that we previously estimated.  It is possible that the costs and delays associated with compliance with such standards and regulations could become such that the LLC would not proceed with the development or operation of the Mt. Hope Project.

 

Water Rights Considerations

 

In addition to working to complete the EIS, we are working to finalize the transfer of water rights to mining use.  In March 2009 we were granted our water applications in a Ruling by the State Engineer.  However, that Ruling was

 

74



Table of Contents

 

successfully appealed in April 2010 in Nevada District Court (“NDC”), remanding the matter for another hearing by the State Engineer.

 

On July 15, 2011, the State Engineer issued a second Ruling granting the Company’s water right applications.  In August 2011, Eureka County and two other parties comprised of three individual water rights holders in Diamond Valley and one in Kobeh Valley, filed Petitions and Amended and Supplemental Petitions (“Petitions”) with the NDC appealing the second Ruling of the State Engineer.  We continue to anticipate a favorable NDC decision, upholding the State Engineer’s second Ruling.  The appeal hearing is set for April 3, 2012 before the NDC.  A decision by the NDC is expected in mid-2012, although the NDC is not required to act under any specified timeline.  The appeal does not prevent the State Engineer from issuing the permits and as such, the State Engineer completed issuance of all permits on December 14, 2011 and certain amended permits on January 4, 2012 subject to the second Ruling.  The water will become available for consumptive use following the State Engineer’s approval of the Company’s Monitoring, Management and Mitigation Plan (“3M Plan”), developed with the input and cooperation of Eureka County. The Company is continuing to work with the State Engineer and Eureka County following our prior submissions, to finalize the 3M Plan and we anticipate the State Engineer will approve the 3M Plan prior to commencement of construction, in the second half of 2012.

 

Environmental Considerations

 

Our mineral property holdings in Shoshone County, Idaho include lands contained in mining districts that have been designated as “Superfund” sites pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act.  This “Superfund Site” was established to investigate and remediate primarily the Bunker Hill properties of Smelterville, Idaho, a small portion of Shoshone County where a large smelter was located.  However, because of the extent of environmental impact caused by the historical mining in the mining district, the Superfund Site covers the majority of Shoshone County including our Chicago-London and Little Pine Creek properties as well as many small towns located in Northern Idaho.  We have conducted a property environmental investigation of these properties, which revealed no evidence of material adverse environmental effects at either property.  We are unaware of any pending action or proceeding relating to any regulatory matters that would affect our financial position due to these inactive mining claims in Shoshone County.

 

NOTE 11 — UNAUDITED SUPPLEMENTARY DATA

 

The following is a summary of selected quarterly financial information (unaudited):

 

Year Ended December 31, 2011
(in thousands, except per share
amounts)

 

Q1

 

Q2

 

Q3

 

Q4

 

Loss from operations

 

$

(4,107

)

$

(5,982

)

$

(2,319

)

$

(2,816

)

Other (expense)/income

 

(49

)

(58

)

(61

)

(61

)

Consolidated net loss

 

(4,156

)

(6,040

)

(2,380

)

(2,877

)

Basic and diluted net loss per share

 

$

(0.05

)

$

(0.06

)

$

(0.03

)

$

(0.03

)

 

 

 

 

 

 

 

 

 

 

Year Ended December 31, 2010

 

 

 

 

 

 

 

 

 

Loss from operations

 

$

(2,846

)

$

(3,165

)

$

(7,266

)

$

(3,303

)

Other income/(expense)

 

1

 

(36

)

(60

)

(56

)

Consolidated net loss

 

(2,845

)

(3,201

)

(7,326

)

(3,359

)

Basic and diluted net loss per share

 

$

(0.04

)

$

(0.04

)

$

(0.09

)

$

(0.05

)

 

NOTE 12 — SUBSEQUENT EVENTS

 

On February 28, the LLC issued a firm purchase order for 18 haul trucks to Cashman Equipment Company, the Nevada-based dealer for Caterpillar.  The order provides for delivery of those haul trucks required to perform initial mine development, currently scheduled for the second half of 2013.  A non-refundable down-payment of $0.6 million was made at the time of order with an additional $0.6 million due 12 months prior to truck shipment, but the contract is cancellable with no further liability to the LLC up until the time of truck shipment.  An additional 6 haul trucks are not required until after the commencement of commercial production, and will be ordered at a future date.

 

ITEM 9.               CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE

 

None.

 

75



Table of Contents

 

ITEM 9A.      CONTROLS AND PROCEDURES

 

An evaluation was performed under the supervision and with the participation of our management, including our principal executive officer and principal financial officer, of the effectiveness of our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934) as of the end of the period covered by this Annual Report on Form 10-K.  Based on the foregoing, our management concluded that our disclosure controls and procedures are effective to ensure that information required to be disclosed by us in reports that we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the Securities and Exchange Commission rules and forms and such information is accumulated and communicated to our management, including our principal executive officer and principal financial officer, to allow timely decisions regarding required disclosure.

 

There was no change in our internal control over financial reporting that occurred during the quarter ended December 31, 2011 that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

 

REPORT OF MANAGEMENT ON INTERNAL CONTROL OVER FINANCIAL REPORTING

 

Our management is responsible for establishing and maintaining adequate internal control over financial reporting for the Company.  Internal control over financial reporting is a process to provide reasonable assurance regarding the reliability of our financial reporting and the preparation of financial statements for external purposes in accordance with accounting principles generally accepted in the United States of America.  Internal control over financial reporting includes maintaining records that in reasonable detail accurately and fairly reflect the Company’s transactions; providing reasonable assurance that transactions are recorded as necessary for preparation of the Company’s financial statements; providing reasonable assurance that receipts and expenditures of the Company’s assets are made in accordance with management’s authorization; and providing reasonable assurance that unauthorized acquisition, use or disposition of the Company’s assets that could have a material effect on the financial statements would be prevented or detected on a timely basis.  Because of its inherent limitations, internal control over financial reporting is not intended to provide absolute assurance that a misstatement of the Company’s financial statements would be prevented or detected.

 

Management conducted its evaluation of the effectiveness of the Company’s internal controls over financial reporting based on the framework in Internal Control — Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission.  Based on this evaluation, management concluded that the Company’s internal control over financial reporting was effective as of December 31, 2011.

 

The effectiveness of the Company’s assessment of internal control over financial reporting as of December 31, 2011 has been audited by PricewaterhouseCoopers LLP, an independent registered public accounting firm, as stated in their report which appears herein.

 

ITEM 9B.      OTHER INFORMATION

 

2011 Executive Incentive Payments

 

On February 16, 2012, the compensation committee of the Board and the Board approved the following incentive compensation for 2011 to our named executive officers as indicated below.

 

Executive

 

Title

 

Incentive Payment

 

Bruce D. Hansen

 

Chief Executive Officer

 

$

212,098

 

David A. Chaput

 

Chief Financial Officer

 

$

91,277

 

Robert I. Pennington

 

Chief Operating Officer

 

$

83,541

 

Lee M. Shumway

 

Controller and Treasurer

 

$

65,093

 

R. Scott Roswell

 

Corporate Counsel — VP Human Resources

 

$

74,991

 

 

76



Table of Contents

 

In addition, the Board authorized the following incentive compensation for our named executive officers to be vested and payable upon achievement of ROD.

 

Executive

 

Incentive Payment

 

Bruce D. Hansen

 

$

106,652

 

David A. Chaput

 

$

45,898

 

Robert I. Pennington

 

$

42,009

 

Lee M. Shumway

 

$

32,732

 

R. Scott Roswell

 

$

37,709

 

 

PART III

 

ITEM 10.        DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE

 

Information regarding directors and executive officers of registrant is presented under the heading “Directors and Executive Officers” in our definitive proxy statement for use in connection with the 2012 Annual Meeting of Stockholders (“2011 Proxy Statement”) to be filed within 120 days after our fiscal year ended December 31, 2011, and is incorporated herein by this reference thereto.

 

Information regarding Section 16(a) beneficial ownership reporting compliance report is presented under the heading “Section 16(a) Beneficial Ownership Reporting Compliance” in our 2011 Proxy Statement, and is incorporated herein by this reference thereto.  Information regarding our code of ethics is presented under the heading “Code of Business Conduct and Ethics” in our 2011 Proxy Statement, and is incorporated herein by reference thereto.  Information regarding our Audit Committee, Finance Committee and our Nominating Committee is presented under the heading “The Board of Directors, Board Committees and Director Independence” in our 2012 Proxy Statement, and is incorporated herein by reference thereto.

 

ITEM 11.        EXECUTIVE COMPENSATION

 

Information regarding executive compensation is presented under the heading “Executive Compensation” in our 2012 Proxy Statement, and is incorporated herein by this reference thereto.

 

ITEM 12.        SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS

 

Information regarding certain information with respect to our equity compensation plans as of December 31, 2011 is set forth under the heading “Equity Compensation Plan Information” in our 2012 Proxy Statement, and is incorporated herein by this reference thereto.

 

Information regarding security ownership of certain beneficial owners and management is set forth under the heading “Voting Securities and Principal Holders” in our 2012 Proxy Statement, and is incorporated herein by this reference thereto.

 

ITEM 13.        CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE

 

Information regarding certain relationships and related transactions is presented under the heading “Certain Relationships and Related Transactions” in our 2012 Proxy Statement, and is incorporated herein by this reference thereto.

 

ITEM 14.        PRINCIPAL ACCOUNTING FEES AND SERVICES

 

Information regarding principal accounting fees and services is presented under the headings “Audit Fees”, “Audit-Related Fees”, “Tax Fees”, and “All Other Fees” in our 2012 Proxy Statement, and is incorporated herein by this reference thereto.

 

77



Table of Contents

 

PART IV

 

ITEM 15.  EXHIBITS AND FINANCIAL STATEMENT SCHEDULES

 

(1)                                 Financial Statements

 

See the Index to Consolidated Financial Statements included on page 50 for a list of the financial statements included in this Form 10-K.

 

(2)                                 Financial Statement Schedules

 

Financial statement schedules are omitted because they are not required or are not applicable.

 

(3)                                 Exhibits

 

Exhibit
Number

 

Description

 

 

 

3.1†

 

Certificate of Incorporation (Filed as Exhibit 3.1 to our Current Report on Form 8-K filed on October 5, 2007.)

3.2†

 

Certificate of Designation of Series A Junior Participating Preferred Stock (Filed as Exhibit 3.1 to our Current Report on Form 8-K filed on March 5, 2010.)

3.3†

 

Amended and Restated Bylaws (Filed as Exhibit 3.2 to our Current Report on Form 8-K filed on March 5, 2010.)

4.1†

 

Form of Security Purchase Agreement in connection with the private placement completed February 15, 2006 (Filed as Exhibit 4.1 to our Current Report on Form 8-K filed on February 17, 2006.)

4.2†

 

Form of Common Stock Purchase Warrant in connection with the private placement completed February 15, 2006 (Filed as Exhibit 4.2 to our Current Report on Form 8-K filed on February 17, 2006.)

4.3†

 

Form of Common Stock Warrant Issued Pursuant to Placement Agent Agreement in connection with the private placement completed February 15, 2006 (Filed as Exhibit 4.3 to our Current Report on Form 8-K filed on February 17, 2006.)

10.1†

 

Lease Agreement, dated October 17, 2005, between the Company and Mount Hope Mines, Inc. (Filed as Exhibit 10.1 to our Current Report on Form 8-K filed on January 23, 2006.)

10.2†

 

Modification to Mount Hope Mines Lease Agreement, dated January 26, 2006 (Filed as Exhibit 10.11 to our Annual Report on Form 10-KSB filed on March 31, 2006.)

10.3†

 

Amendment to Lease Agreement, made effective as of November 20, 2007, between the Company and Mount Hope Mines, Inc. (Filed as Exhibit 10.3 to our Annual Report on Form 10-KSB filed on March 21, 2008.)

10.4†

 

Option to Lease, dated November 12, 2004, between the Company and Mount Hope Mines, Inc. (Filed as Exhibit 10.1 to our Annual Report on Form 10-KSB filed on April 6, 2005.)

10.5†

 

Stock Purchase Agreement, dated December 11, 2006, between the Company and Equatorial Mining Limited (Filed as Exhibit 10.17 to our Annual Report on Form 10-KSB filed on April 3, 2007.)

10.6†

 

Securities Purchase Agreement, dated as of November 19, 2007, between the Company and ArcelorMittal S.A. (Filed as Exhibit 10.6 to our Annual Report on Form 10-KSB filed on March 21, 2008.)

10.7†

 

Consent and Waiver Agreement, dated April 16, 2010, by and between the Company and ArcelorMittal S.A. (Filed as Exhibit 10.1 to our Current Report on Form 8-K filed on April 19, 2010.)

10.8†+

 

Amended and Restated Employment Agreement, dated December 30, 2011, between the Company and Bruce D. Hansen (Filed herewith.)

10.9†+

 

Amended and Restated Employment Agreement, dated December 30, 2011, between the Company and David Chaput (Filed herewith.)

10.10†+

 

Form of Indemnification Agreement (Filed as Exhibit 10.18 to our Current Report on Form 8-K filed on October 5, 2007.)

10.11†+

 

General Release and Settlement Agreement between the Company and Robert L. Russell entered into on October 1, 2007 (Filed as Exhibit 10.10 to our Annual Report on Form 10-KSB filed on March 21, 2008.)

10.12†+

 

Consulting and Advisory Agreement between the Company and Robert L. Russell entered into on October 1, 2007 (Filed as Exhibit 10.11 to our Annual Report on Form 10-KSB filed on March 21, 2008.)

10.13†+

 

Letter Agreement dated December 16, 2008, between the Company and Robert L. Russell (Filed as Exhibit 10.14 to our Annual Report on Form 10-K filed on February 27, 2009.)

 

78



Table of Contents

 

Exhibit
Number

 

Description

10.14†+

 

2003 Stock Option Plan of the Company (Filed as Exhibit 4.1 to our General Form for Registration of Securities of Small Business Issuers on Form 10-SB/A filed on May 14, 2004)

10.15†+

 

Form of Stock Option Agreement under 2003 Stock Option Plan of the Company (Filed as Exhibit 4.2 to our General Form for Registration of Securities of Small Business Issuers on Form 10-SB/A filed on May 14, 2004)

10.16†+

 

First Amendment to 2003 Stock Option Plan of the Company, dated effective as of January 1, 2009 (Filed as Exhibit 10.17 to our Annual Report on Form 10-K filed on February 27, 2009.)

10.17†+

 

General Moly, Inc. 2006 Equity Incentive Plan, as Amended and Restated (Filed as Exhibit 10.1 to our Registration Statement on Form S-8 filed on May 21, 2010.)

10.18†+

 

Form of Stock Option Grant Notice and Agreement under 2006 Equity Incentive Plan of the Company (Filed as Exhibit 10.13 to our Annual Report on Form 10-KSB filed on April 3, 2007.)

10.19†+

 

Form of Restricted Stock Agreement under 2006 Equity Incentive Plan of the Company (Filed as Exhibit 10.14 to our Annual Report on Form 10-KSB filed on April 3, 2007.)

10.20†+

 

Form of Non-Employee Option Award Agreement (Filed as Exhibit 99.1 to our Registration Statement on Form S-8 filed on January 12, 2007.)

10.21†+

 

Form of Employee Stock Option Agreement (Filed as Exhibit 99.2 to our Registration Statement on Form S-8 filed on January 12, 2007.)

10.22†+

 

Form of Stock Appreciation Right Grant Notice and Agreement under the Company’s 2006 Equity Incentive Plan (Filed as Exhibit 10.3 to our Current Report on Form 8-K filed on March 5, 2009.)

10.23†+

 

Form of Restricted Stock Unit Agreement under 2006 Equity Incentive Plan of the Company (Filed as Exhibit 10.4 to our Quarterly Report on Form 10-Q Filed on October 29, 2010.)

10.24†*

 

Molybdenum Supply Agreement between General Moly and ArcelorMittal Purchasing SAS, dated as of December 28, 2007 (Filed as Exhibit 10.19 to our Annual Report on Form 10-KSB filed on March 31, 2008.)

10.25†*

 

Extension Molybdenum Supply Agreement, dated as of April 16, 2010, by and between the Company and ArcelorMittal S.A. (Filed as Exhibit 10.2 to our Quarterly Report on Form 10-Q filed on July 30, 2010.)

10.26†

 

Contribution Agreement between Nevada Moly, LLC, a wholly-owned subsidiary of the Company (“Nevada Moly”), Eureka Moly, LLC, and POS-Minerals Corporation (Filed as Exhibit 10.20 to our Quarterly Report on Form 10-Q filed on May 7, 2008.)

10.27†

 

Amended and Restated Limited Liability Company Agreement of Eureka Moly, LLC (Filed as Exhibit 10.20 to our Quarterly Report on Form 10-Q filed on May 7, 2008.)

10.28†

 

Amendment No. 1 to Limited Liability Company Agreement of Eureka Moly, LLC, dated as of October 28, 2008, between Nevada Moly, LLC and POS-Minerals Corporation (Filed as Exhibit 10.27 to our Annual Report on Form 10-K filed on February 27, 2009.)

10.29†

 

Amendment No. 2 to Limited Liability Company Agreement of Eureka Moly, LLC, dated as of January 20, 2010, between Nevada Moly, LLC and POS-Minerals Corporation (Filed as Exhibit 10.3 to our Current Report on Form 8-K filed on January 25, 2010.)

10.30†

 

Third Installment Election, dated as of March 3, 2010, between Nevada Moly, LLC and POS-Minerals Corporation (filed as Exhibit 10.4 to our Current Report on Form 8-K filed on March 5, 2010.)

10.31†

 

Guarantee and Indemnity Agreement, dated February 26, 2008, by POSCO Canada Ltd., in favor of Nevada Moly, LLC and the Company (Filed as Exhibit 10.20 to our Quarterly Report on Form 10-Q filed on May 7, 2008.)

10.32†*

 

Molybdenum Supply Agreement between the Company and SeAH Besteel Corporation, dated as of May 14, 2008 (Filed as Exhibit 10.25 to our Quarterly Report on Form 10-Q filed on August 4, 2008.)

10.33†*

 

Molybdenum Supply Agreement between the Company and Sojitz Corporation, dated as of August 8, 2008 (Filed as Exhibit 10.26 to our Quarterly Report on Form 10-Q filed on November 3, 2008.)

10.34†+

 

Employment Agreement, dated as of October 5, 2007, between the Company and Robert I. Pennington (Filed as Exhibit 10.33 to our Annual Report on Form 10-K filed on February 27, 2009.)

10.35†+

 

First Amendment to Employment Agreement, dated effective as of January 1, 2009, between the Company and Robert I. Pennington (Filed as Exhibit 10.34 to our Annual Report on Form 10-K filed on February 27, 2009.)

10.36†+

 

Change of Control Severance Agreement, dated effective as of January 1, 2012, between the Company and Robert Pennington (Filed herewith.)

10. 37†+

 

Form of Stay Bonus Agreement for Bruce D. Hansen, David A. Chaput, Robert I. Pennington (Filed as Exhibit 10.1 to our Current Report on Form 8-K filed on May 12, 2009.)

10.38†+

 

Stay Bonus Agreement for Lee M. Shumway (Filed as Exhibit 10.48 to our Annual Report on Form 10-K filed on March 5, 2010.)

 

79



Table of Contents

 

Exhibit
Number

 

Description

10.39†+

 

Employment Agreement, dated November 6, 2007, between the Company and Lee M. Shumway (Filed as Exhibit 10.49 to our Annual Report on Form 10-K filed on March 5, 2010.)

10.40†+

 

Change of Control Severance Agreement, dated effective as of January 1, 2012, between the Company and Lee M. Shumway (Filed herewith.)

10.41†

 

Securities Purchase Agreement between the Company and Hanlong (USA) Mining Investment, Inc. dated March 4, 2010 (Filed as Annex B to our Definitive Proxy Statement filed on April 6, 2010.)

10.42†

 

Amendment No. 1 to Securities Purchase Agreement dated July 30, 2010, between General Moly, Inc. and Hanlong (USA) Mining Investment, Inc. (Filed as Exhibit 10.1 to our Quarterly Report on Form 10-Q filed on October 29, 2010.)

10.43†

 

Amendment No. 2 to Securities Purchase Agreement dated October 26, 2010, between General Moly, Inc. and Hanlong (USA) Mining Investment, Inc. (Filed as Exhibit 10.3 to our Registration Statement on Form S-3 filed on November 23, 2010.)

10.44†

 

Amendment No. 3 to Securities Purchase Agreement dated December 20, 2010, between General Moly, Inc. and Hanlong (USA) Mining Investment, Inc. (Filed as Exhibit 7(e) to Hanlong (USA) Mining Investment, Inc.’s Schedule 13D filed on December 30, 2010.)

10.45†

 

Amendment No. 4 to Securities Purchase Agreement dated July 7, 2011, between General Moly, Inc. and Hanlong (USA) Mining Investment, Inc. (Filed as Exhibit 10.1 to our Current Report on Form 8-K filed on July 13, 2011.)

10.46

 

Option Agreement with respect to Securities Purchase Agreement dated January 9, 2012, between General Moly, Inc. and Hanlong (USA) Mining Investment, Inc. (Filed herewith.)

10.47†

 

Stockholder Agreement dated December 20, 2010, between General Moly, Inc. and Hanlong (USA) Mining Investment, Inc. (Filed as Exhibit 10.1 to our Current Report on Form 8-K filed on December 21, 2010.)

10.48†

 

Bridge Loan Agreement dated March 4, 2010 between General Moly, Inc. and Hanlong (USA) Mining Investment, Inc. (Filed as Annex C to our Definitive Proxy Statement filed on April 6, 2010.)

10.49†

 

Amendment No. 1 to Bridge Loan Agreement dated July 30, 2010, between General Moly, Inc. and Hanlong (USA) Mining Investment, Inc. (Filed as Exhibit 10.2 to our Quarterly Report on Form 10-Q filed on October 29, 2010.)

10.50†

 

Amendment No. 2 to Bridge Loan Agreement dated July 7, 2011, between General Moly, Inc. and Hanlong (USA) Mining Investment, Inc. (Filed as Exhibit 10.2 to our Current Report on Form 8-K filed on July 13, 2011.)

10.51

 

Option Agreement with respect to Bridge Loan Agreement dated January 9, 2012, between General Moly, Inc. and Hanlong (USA) Mining Investment, Inc. (Filed herewith.)

10.52†

 

Pledge Agreement between Nevada Moly, LLC and Hanlong (USA) Mining Investment, Inc. dated March 4, 2010 (Filed as Annex D to our Definitive Proxy Statement filed on April 6, 2010.)

10.53†*

 

Molybdenum Supply Agreement dated March 4, 2010, between General Moly, Inc, Nevada Moly, LLC, China Han Long Mining Development Limited and Hanlong (USA) Mining Investment, Inc. (Filed as Exhibit 10.6 to our Quarterly Report on Form 10-Q filed on May 6, 2010.)

10.54†

 

Common Stock Purchase Warrant dated April 16, 2010, issued to CCM Qualified Master Fund, Ltd. (Filed as Exhibit 10.1 to our Current Report on Form 8-K filed on April 19, 2010.)

10.55†

 

Common Stock Purchase Warrant dated April 16, 2010, issued to Coghill Capital Management, LLC. (Filed as Exhibit 10.1 to our Current Report on Form 8-K filed on April 19, 2010.)

10.56†

 

Agreement to Reprice and Exercise Warrants between the Company and CCM Master Qualified Fund, Ltd. Dated December 21, 2010 (Filed as Exhibit 10.1 to our Current Report on Form 8-K filed on January 5, 2011.)

10.57†

 

Agreement to Reprice and Exercise Warrants between the Company and CCM Special Holdings Fund, LP. Dated December 21, 2010 (Filed as Exhibit 10.2 to our Current Report on Form 8-K filed on January 5, 2011.)

10.58†

 

Cooperation Agreement dated August 10, 2010, between Eureka Moly, LLC and the Eureka Producers Cooperative (Filed as Exhibit 10.1 to our Current Report on Form 8-K/A filed on August 26, 2010.)

10.59†

 

Employment Offer Letter dated August 17, 2010, between General Moly, Inc. and Robert Scott Roswell (Filed as Exhibit 10.60 to our Annual Report on Form 10-K filed on March 2, 2011.)

10.60†+

 

Change of Control Severance Agreement dated January 1, 2012, between General Moly, Inc. and Robert Scott Roswell (Filed herewith.)

10.61+

 

Separation and Release Agreement dated March 24, 2011, between General Moly, Inc. and Gregory McClain (Filed as Exhibit 10.4 to our Quarterly Report on Form 10-Q filed on May 2, 2011.)

10.62†+

 

General Release in Full of All Claims dated March 24, 2011, between General Moly, Inc. and Gregory McClain (Filed as Exhibit 10.5 to our Quarterly Report on Form 10-Q filed on May 2, 2011.)

10.63†+

 

Form of Restricted Stock Unit Agreement for the Company’s 2006 Equity Incentive Plan (performance-based vesting) (Filed as Exhibit 10.6 to our Quarterly Report on Form 10-Q filed on May 2, 2011.)

 

80



Table of Contents

 

Exhibit
Number

 

Description

10.64†+

 

Form of Restricted Stock Unit Agreement for the Company’s 2006 Equity Incentive Plan (tome-based vesting) (Filed as Exhibit 10.7 to our Quarterly Report on Form 10-Q filed on May 2, 2011.)

10.65†+

 

Form of Stock Appreciation Rights Grant Notice for the Company’s 2006 Equity Incentive Plan (Filed as Exhibit 10.8 to our Quarterly Report on Form 10-Q filed on May 2, 2011.)

14.1†

 

Code of Conduct and Ethics of Idaho General Mines, Inc. adopted June 30, 2006 (Filed as Exhibit 14.1 to our Current Report on Form 8-K filed on July 7, 2006.)

21.1

 

Subsidiaries of General Moly, Inc. (Filed herewith)

23.1

 

Consent of PricewaterhouseCoopers LLP (Filed herewith)

31.1

 

Certification of CEO pursuant to Rule 13a-14(a)/15d-14(a) (Filed herewith)

31.2

 

Certification of CFO pursuant to Rule 13a-14(a)/15d-14(a) (Filed herewith)

32.1

 

Certification of CEO pursuant to Section 1350 (Furnished herewith)

32.2

 

Certification of CFO pursuant to Section 1350 (Furnished herewith)

101

 

The following XBRL (Extensible Business Reporting Language) materials are filed herewith: (i) XBRL Instance; (ii) XBRL Taxonomy Extension Schema; (iii) XBRL Taxonomy Extension Calculation; (iv) Taxonomy Extension Labels, (v) XBRL Taxonomy Extension Presentation, and (vi) XBRL Taxonomy Extension Definition. In accordance with Rule 406T of Regulation S-T, the information in these exhibits is furnished and deemed not filed or a part of a registration statement or prospectus for purposes of Sections 11 or 12 of the Securities Act of 1933, is deemed not filed for purposes of Section 18 of the Exchange Act of 1934, and otherwise not subject to liability under these sections and shall not be incorporated by reference into any registration statement or other document filed under the Securities Act of 1933, as amended, except as expressly set forth by the specific reference in such filing.

 


                 Previously filed as indicated and incorporated herein by reference.

+                 Management contract.

*                 Confidential treatment has been granted for certain portions of this exhibit, and such confidential portions have been separately filed with the Securities Exchange Commission.

 

81



Table of Contents

 

SIGNATURES

 

Pursuant to the requirements of the Section 13 or 15(d) of the Exchange Act, the Registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized in Lakewood, Colorado on March 1, 2012.

 

 

GENERAL MOLY, INC.

 

 

 

 

 

By:

/s/ Bruce D. Hansen

 

Name:

Bruce D. Hansen

 

Title:

Chief Executive Officer

 

 

(Principal Executive Officer)

 

Pursuant to the requirements of the Exchange Act, this report has been signed below on March 1, 2012, by the following persons, on behalf of the Registrant, and in the capacities indicated.

 

/s/ Bruce D. Hansen

 

Chief Executive Officer and Director

Bruce D. Hansen

 

(Principal Executive Officer)

 

 

 

/s/ David A. Chaput

 

Chief Financial Officer

David A. Chaput

 

(Principal Financial Officer)

 

 

 

/s/ Lee M. Shumway

 

Controller and Treasurer

Lee M. Shumway

 

(Principal Accounting Officer)

 

 

 

/s/ Patrick M. James

 

Chairman of the Board

Patrick M. James

 

 

 

 

 

/s/ Ricardo M. Campoy

 

Director

Ricardo M. Campoy

 

 

 

 

 

/s/ Mark A. Lettes

 

Director

Mark A. Lettes

 

 

 

 

 

/s/ Gary A. Loving

 

Director

Gary A. Loving

 

 

 

 

 

/s/ R. David Russell

 

Director

R. David Russell

 

 

 

 

 

/s/ Richard F. Nanna

 

Director

Richard F. Nanna

 

 

 

 

 

/s/ Gregory P. Raih

 

Director

Gregory P. Raih

 

 

 

 

 

/s/ Andrew G. Sharkey

 

Director

Andrew G. Sharkey

 

 

 

 

 

/s/ Nelson F. Chen

 

Director

Nelson F. Chen

 

 

 

82