UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
Form 6-K
REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934
December 1, 2015
BHP BILLITON LIMITED (ABN 49 004 028 077) (Exact name of Registrant as specified in its charter)
VICTORIA, AUSTRALIA (Jurisdiction of incorporation or organisation)
171 COLLINS STREET, MELBOURNE, VICTORIA 3000 AUSTRALIA (Address of principal executive offices) |
BHP BILLITON PLC (REG. NO. 3196209) (Exact name of Registrant as specified in its charter)
ENGLAND AND WALES (Jurisdiction of incorporation or organisation)
NEATHOUSE PLACE, LONDON, UNITED KINGDOM (Address of principal executive offices) |
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F: x Form 20-F ¨ Form 40-F
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): ¨
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): ¨
Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934: ¨ Yes x No
If Yes is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b): n/a
BHP Billiton Limited | BHP Billiton Plc | |||
171 Collins Street | Neathouse Place | |||
Melbourne Victoria 3000 Australia | London SW1V 1LH UK | |||
GPO BOX 86 | Tel +44 20 7802 4000 | |||
Melbourne Victoria 3001 Australia | Fax + 44 20 7802 4111 | |||
Tel +61 1300 55 47 57 Fax +61 3 9609 3015 | bhpbilliton.com | |||
bhpbilliton.com |
1 December 2015
To: | Australian Securities Exchange | cc: | New York Stock Exchange | |||
London Stock Exchange | JSE Limited |
COPPER BRIEFING AND SITE TOUR
BHP Billiton President, Copper, Danny Malchuk, will host a Copper briefing and site tour on Tuesday, 1 December 2015.
A copy of the presentation is attached.
Further information on BHP Billiton can be found at www.bhpbilliton.com.
Rachel Agnew
Company Secretary
BHP Billiton Limited ABN 49 004 028 077 | BHP Billiton Plc Registration number 3196209 | |
Registered in Australia | Registered in England and Wales | |
Registered Office: 171 Collins Street Melbourne Victoria 3000 | Registered Office: Neathouse Place, London SW1V 1LH United Kingdom |
The BHP Billiton Group is headquartered in Australia
NEWS RELEASE
Release Time | IMMEDIATE | |
Date | 1 December 2015 | |
Number | 30/15 |
BUILDING MOMENTUM IN COPPER
BHP Billiton President Copper, Daniel Malchuk, today announced plans to lower copper unit costs to US$1.08 per pound in the 2017 financial year, supporting strong cash margins even at todays prices. Over this period, the release of latent capacity across the portfolio will also help annual Group copper production grow to approximately 1.7 Mt at very low cost. This strong recovery will be supported by our differentiated water and power solutions in Chile which will provide us with a significant competitive advantage.
Mr Malchuk reinforced BHP Billitons commitment to sustainability saying, We value safe, sustainable operations above all else. We are enhancing verification for critical controls across all our assets and have brought forward our regular review of our tailings facilities.
Referring to the copper market, he said while near-term oversupply is weighing on current prices, attractive long-term fundamentals continue to support our positive outlook. We see a number of factors creating the conditions for a significant supply deficit by the end of the decade. Grade decline, falling investment across the sector, the lack of greenfield projects and challenges accessing sustainable power and water are all likely to constrain industry supply. Meanwhile we expect robust demand from China and non-OECD countries to add to the deficit.
Mr Malchuk said BHP Billitons Copper portfolio comprised of large, long life assets competitively positioned on the cost curve. We have the industrys largest copper resource and our business will gain momentum over the next two years with lower costs and higher production across our major assets as we safely improve productivity.
At Escondida, no major investment is required to sustain an average 1.2 million tonnes per annum of production capacity for the decade from the 2016 financial year, and the asset is expected to generate strong free cash flow through the cycle.
Olympic Dam unit costs are expected to fall 48 per cent1 by the end of the 2017 financial year to US$1.00 per pound, repositioning the asset at the low end of the cost curve. Over the same period, Spence unit costs are expected to fall 10 per cent to 87 US cents per pound. Low cost debottlenecking projects will release latent capacity, supporting sustainable production of approximately 200 ktpa at both Olympic Dam and Spence from the 2016 financial year.
We are also pursuing further growth opportunities which offer attractive returns. The Spence Growth Option has advanced to the feasibility stage with the potential for first production in the 2020 financial year. And we continue to create staged optionality for substantial long-term growth at Olympic Dam. These opportunities will enable us to bring on production at a time that coincides with an expected price recovery.
Further information on BHP Billiton can be found at: www.bhpbilliton.com.
1 | Relative to FY15. |
Media Relations |
Investor Relations | |
Australia | Australia | |
Emily Perry | Tara Dines | |
Tel: +61 3 9609 2800 Mobile: +61 477 325 803 | Tel: +61 3 9609 2222 Mobile: +61 499 249 005 | |
email: Emily.Perry@bhpbilliton.com | email: Tara.Dines@bhpbilliton.com | |
Paul Hitchins | Andrew Gunn | |
Tel: + 61 3 9609 2592 Mobile: + 61 419 315 001 | Tel: +61 3 9609 3575 Mobile: +61 402 087 354 | |
email: Paul.Hitchins@bhpbilliton.com | email: Andrew.Gunn@bhpbilliton.com | |
Eleanor Nichols | United Kingdom and South Africa | |
Tel: +61 3 9609 2360 Mobile: +61 407 064 748 | ||
email: Eleanor.Nichols@bhpbilliton.com | Jonathan Price | |
Tel: +44 20 7802 4131 Mobile: +44 7990 527 726 | ||
United Kingdom and Americas | email: Jonathan.H.Price@bhpbilliton.com | |
Ruban Yogarajah | Dean Simon | |
Tel: +44 20 7802 4033 Mobile: +44 7827 082 022 | Tel: +44 20 7802 7461 Mobile: +44 7717 511 193 | |
email: Ruban.Yogarajah@bhpbilliton.com | email: Dean.Simon@bhpbilliton.com | |
Jennifer White | Americas | |
Tel: +44 20 7802 7462 Mobile: +44 7827 253 764 | ||
email: Jennifer.White@bhpbilliton.com | James Agar | |
Tel: +1 212 310 1421 Mobile: +1 347 882 3011 | ||
email: James.Agar@bhpbilliton.com | ||
Joseph Suarez | ||
Tel: +1 212 310 1422 Mobile: +1 646 400 3803 | ||
email: Joseph.Suarez@bhpbilliton.com | ||
BHP Billiton Limited ABN 49 004 028 077 | BHP Billiton Plc Registration number 3196209 | |
Registered in Australia | Registered in England and Wales | |
Registered Office: Level 16, 171 Collins Street | Registered Office: Neathouse Place | |
Melbourne Victoria 3000 Australia | London SW1V 1LH United Kingdom | |
Tel +61 1300 55 4757 Fax +61 3 9609 3015 | Tel +44 20 7802 4000 Fax +44 20 7802 4111 |
Members of the BHP Billiton Group which is headquartered in Australia
Follow us on social media
bhpbilliton
BHP Billiton
Copper
Strong fundamentals, unrivalled resource, world-class operations
Daniel Malchuk
President, Copper
Escondida
Disclaimer
Forward-looking statements
This presentation contains forward-looking
statements, including statements regarding: trends in commodity prices and currency exchange rates; demand for commodities; plans, strategies and objectives of management; closure or divestment of certain operations or facilities (including
associated costs); anticipated production or construction commencement dates; capital costs and scheduling; operating costs and shortages of materials and skilled employees; anticipated productive lives of projects, mines and facilities; provisions
and contingent liabilities; tax and regulatory developments.
Forward-looking statements can be identified by the use of terminology such as intend,
aim, project, anticipate, estimate, plan, believe, expect, may, should, will, continue, annualised or
similar words. These statements discuss future expectations concerning the results of operations or financial condition, or provide other forward-looking statements.
These forward-looking statements are not guarantees or predictions of future performance, and involve known and unknown risks, uncertainties and other factors,
many of which are beyond our control, and which may cause actual results to differ materially from those expressed in the statements contained in this presentation. Readers are cautioned not to put undue reliance on forward-looking statements.
For example, future revenues from our operations, projects or mines described in this presentation will be based, in part, upon the market price of the minerals,
metals or petroleum produced, which may vary significantly from current levels. These variations, if materially adverse, may affect the timing or the feasibility of the development of a particular project, the expansion of certain facilities or
mines, or the continuation of existing operations.
Other factors that may affect the actual construction or production commencement dates, costs or production
output and anticipated lives of operations, mines or facilities include our ability to profitably produce and transport the minerals, petroleum and/or metals extracted to applicable markets; the impact of foreign currency exchange rates on the
market prices of the minerals, petroleum or metals we produce; activities of government authorities in some of the countries where we are exploring or developing these projects, facilities or mines, including increases in taxes, changes in
environmental and other regulations and political uncertainty; labour unrest; and other factors identified in the risk factors discussed in BHP Billitons filings with the US Securities and Exchange Commission (the SEC) (including
in Annual Reports on Form 20-F) which are available on the SECs website at www.sec.gov.
Except as required by applicable regulations or by law, the Group
does not undertake any obligation to publicly update or review any forward-looking statements, whether as a result of new information or future events.
Past
performance cannot be relied on as a guide to future performance.
Non-IFRS financial information
BHP Billiton results are reported under International Financial Reporting Standards (IFRS) including Underlying EBIT and Underlying EBITDA which are used to measure segment
performance. This release may also include certain non-IFRS measures including Adjusted effective tax rate, Attributable profit excluding exceptional items, Free cash flow, Gearing Ratio, Net debt, Net operating assets, Underlying attributable
profit, Underlying basic earnings per share, Underlying EBIT margin, Underlying EBITDA margin, Underlying EBITDA interest coverage and Underlying return on capital. These measures are used internally by management to assess the performance of our
business, make decisions on the allocation of our resources and assess operational management. Non-IFRS measures have not been subject to audit or review and should not be considered as an indication of or alternative to an IFRS measure of
profitability, financial performance or liquidity.
Presentation of data
Unless specified otherwise, all data is presented on a continuing operations basis to exclude the contribution from assets that were demerged with South32 and
references to Underlying EBITDA margin and Underlying EBIT margin exclude third party trading activities.
No offer of securities
Nothing in this presentation should be construed as either an offer to sell or a solicitation of an offer to buy or sell BHP Billiton securities in any jurisdiction, or be treated
or relied upon as a recommendation or advice by BHP Billiton.
Reliance on third party information
The views expressed in this presentation contain information that has been derived from publicly available sources that have not been independently verified. No representation or
warranty is made as to the accuracy, completeness or reliability of the information. This presentation should not be relied upon as a recommendation or forecast by BHP Billiton.
BHP Billiton Investor Briefing, Copper Overview December 2015 2 bhpbilliton
Statement of Mineral Resources
Mineral Resources
The information in this presentation that relates to the FY2015 Mineral
Resources (inclusive of Ore Reserves) was first reported by the Company in compliance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, 2012 (The JORC Code 2012 Edition) in
the 2015 BHP Billiton Annual Report of September 2015.
All reports are available to view on http://www.bhpbilliton.com.
Mineral Resources are reported by S. OConnell (MAusIMM, employed by BHP Billiton) for Olympic Dam, L. Soto (MAusIMM), M Cortes (MAusIMM, both employed by Minera
Escondida Limitada) for Escondida, Pampa Escondida, Pinta Verde, L. Vaccia (MAusIMM, employed by Minera Escondida Limitada) for Chimborazo, J. Cespedes (MAusIMM, employed by BHP Billiton) for Cerro Colorado and Spence
combined as Pampa Norte, L. Canchis (MAusIMM, employed by Minera Antamina SA) for Antamina.
The Company confirms that it is not aware of any new information
or data that materially affects the information included in the original market announcements and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the relevant
market announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons findings are presented have not been materially modified from the original market
announcements.
The above-mentioned persons are full-time employees of BHP Billiton, unless otherwise stated, and have the required qualifications and experience to
qualify as Competent Persons for Mineral Resources under the 2012 edition of the JORC Code. The compilers verify that this presentation is based on and fairly reflects the Mineral Resources information in the supporting documentation and agree with
the form and context of the information presented.
BHP Billiton Investor Briefing, Copper Overview December 2015 3 bhpbilliton
Mineral Inventory classifications
Mineral Resources
Asset
Deposit
Ore Type
Measured Resource (Mt)
Indicated Resource (Mt)
Inferred Resource (Mt)
FY15 ROM production (Mt)
BHP Billiton interest (%)
Copper
Escondida Cluster
Escondida1 All 5,870 @ 0.64% Cu 3,230 @ 0.50% Cu 10,100 @ 0.50% Cu
Pampa Escondida Sulphide 294 @ 0.53% Cu 1,150 @ 0.55% Cu 6,000 @ 0.43% Cu
Pinta Verde All leach ore types 109 @ 0.60% Cu 87 @ 0.52% Cu 52 @ 0.48% Cu
Chimborazo Leach sulphide NA 139 @ 0.50% Cu 84 @ 0.60% Cu 193 57.5
Pampa
Norte Cerro Colorado All leach ore types 79 @ 0.53% Cu 281 @ 0.58% Cu 45 @ 0.63% Cu 18
Spence
All leach ore types 205 @ 0.83% Cu 108 @ 0.42% Cu 27 @ 0.24 Cu 27 100
Hypogene sulphide 514 @
0.47% Cu, 200ppm Mo 789 @ 0.45% Cu, 130ppm Mo 996 @ 0.40% Cu, 80ppm Mo NA
Olympic Dam Sulphide1,330 @ 0.96% Cu, 0.29kg/t U3O8, 0.40g/t Au, 2g/t Ag 4,610 @ 0.79%
Cu, 0.24kg/t U3O8, 0.32g/t Au, 1g/t Ag 4,120 @ 0.71% Cu, 0.25kg/t U3O8, 0.24g/t Au, 1g/t Ag 92 100
Antamina Sulphide 247@ 0.91% Cu, 11g/t Ag, 0.7% Zn, 280 ppm Mo
848@ 0.89% Cu, 10g/t Ag, 0.9% Zn, 200 ppm Mo 1,280@ 0.88% Cu, 11g/t Ag, 0.7% Zn, 170 ppm Mo 58 33.75
1. Escondida includes Escondida and Escondida Norte combined.
2. Represents total material mined instead of processed to account for unplanned mill outage.
BHP Billiton Investor Briefing, Copper Overview December 2015 4 bhpbilliton
Experienced and diverse leadership team
President Daniel Malchuk
Copper Business
Graham Tiver Vice President Finance
Hilmar Rode Asset President Escondida
Vicky Binns Vice President Marketing Copper
Alex Jaques Vice President Human Resources
María Olivia Recart Vice President Corporate Affairs
Kevin
O´Kane Asset President Pampa Norte
Andrew Arthur Vice President Strategy & Development
Jean Des Rivieres Vice President Exploration
Marcos Bastías Vice President Major
Projects
Matt Currie Vice President HSE
Jacqui McGill Asset President Olympic
Dam
Santiago Montt Vice President Group Legal Copper
BHP Billiton Investor
Briefing, Copper Overview December 2015 5 bhpbilliton
Key themes
We value safe
and sustainable operations above all else
Attractive fundamentals expected to support long-term prices
robust long-term demand growth and industry-wide supply challenges point to structural deficit
We have the largest resource base
large, long-life, expandable assets competitively
positioned on the cost curve
World-class operating capability
targeting unit costs of US$1.08/lb1 by FY17 (34% reduction since FY12)
differentiated water and power solutions to provide a competitive advantage
Release of latent capacity delivers more volumes at very low cost
Escondida: ~1.2 Mtpa average production capacity for a decade from FY16
Spence: optimisation initiatives to support utilisation of ~200 ktpa capacity from
FY16
Olympic Dam: SMA2 expected to support utilisation of ~200 ktpa capacity from FY16 and ~220 ktpa by FY19
Strong growth pipeline with competitive returns
SGO2 advanced to feasibility with
potential first production in FY20
creating staged optionality for substantial long-term growth at Olympic Dam
1. Unit cash costs presented net of one-off items, by-product credits, freight and TCRCs for operated copper assets (Escondida, Pampa Norte, Olympic Dam).
2. SMA: Southern Mine Area; SGO: Spence Growth Option.
BHP Billiton Investor Briefing, Copper
Overview December 2015 6 bhpbilliton
Sustainability
Attractive
market fundamentals
Productivity and operating excellence
High-return latent
capacity
Compelling longer-term options
Keeping our people and operations
safe
Despite our goal to achieve zero fatalities
BHP Billiton tragically lost
five colleagues in FY15
Copper Business suffered two fatalities
we are intensifying our efforts to eliminate fatal and other serious incidents
A company-level safety intervention was initiated in FY15 with clear actions defined
we are improving road safety through a comprehensive traffic plan
we are enhancing verification of critical controls for fatality risks across our assets
We have achieved strong and consistent TRIF performance during a period of significant project activity
BHP Billiton Copper safety performance
12 month rolling average TRIF1 per million hours worked
12 8 4 0
FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 YTD
Working to
eliminate incidents with potential significant
impact in our Copper Business2
Index, July 2013=1.0, average incidents per month
1.5 1.0 0.5 0.0
FY14 FY15 FY16 YTD
1. Total Recordable Injury Frequency (TRIF) for Escondida, Pampa Norte and
Olympic Dam.
2. Incidents with uncontrolled release of energy for Escondida, Pampa Norte and Olympic Dam.
BHP Billiton Investor Briefing, Copper Overview December 2015 7 bhpbilliton
Sustainability
Attractive
market fundamentals
Productivity and operating excellence
High-return latent
capacity
Compelling longer-term options
Committed to sustainable development
Focused on environmental sustainability
The Kelar gas-fired power plant will
support less emissions-intensive growth
Reducing our reliance on local aquifers
comprehensive water management plan
increasing desalinated
water capacity from 500 l/s to 3,000 l/s by FY17
Supporting conservation of biodiversity across 500 square km in Valdivian Coastal Reserve
Making a positive contribution to our communities
Applying our principles of good governance,
sustainability, collaboration and alignment
key partner in establishment of CREO1
supporting programs in primary, technical and professional education
US$255 million
invested in community projects since FY11
Valdivian Coastal Reserve
Early
childhood education
1. A long-term plan supported by the OECD to improve quality of life in Antofagasta, aligning public and private investment with citizen
participation.
BHP Billiton Investor Briefing, Copper Overview December 2015 8 bhpbilliton
Sustainability
Attractive
market fundamentals
Productivity and operating excellence
High-return latent
capacity
Compelling longer-term options
Copper a key pillar of BHP
Billiton
Our Copper business continues to deliver exceptional returns
23% of Group production1
24% of Group Underlying EBIT
average
Underlying EBIT margin of 37%
24% of Group capital expenditure
average return on net operating assets of 20%2
Our world-class portfolio and the attractive market outlook ensures Copper remains a key pillar of BHP Billiton
Note: All measures calculated over the period FY13 to FY15.
1. Based on
copper equivalent production calculated using FY13 average realised prices.
2. Represents Underlying EBIT divided by Net Operating Assets.
A major contributor to production1
% of BHP Billiton production
30 20 10 0
FY13 FY14 FY15
A significant contributor to earnings
% of BHP Billiton EBIT Underlying EBIT margin, %
30 60
20 40
10 20
0 0
FY13 FY14 FY15
Copper Underlying EBIT share
Copper Underlying EBIT margin
BHP Billiton Investor Briefing, Copper Overview December 2015
bhpbilliton 9
Sustainability
Attractive
market fundamentals
Productivity and operating excellence
High-return latent
capacity
Compelling longer-term options
Industry fundamentals are attractive
Modest surplus in the short term
Demand growth moderating due to economic
rebalancing in China
Limited reaction from higher-cost supply to weaker prices
Fundamentals expected to support higher long-run prices
Compelling long-term
growth in global demand
Structural supply deficit expected
declining
grades at current operations
greenfield projects restricted by geopolitical challenges and social tensions
insufficient high-quality discoveries
Industry-wide challenges expected to support
attractive margins for those with competitive cost position
Source: BHP Billiton analysis; Wood Mackenzie.
1. Production from base case and highly probable projects.
Deficit expected to emerge at the
end of the decade
Copper, Mt
30 25 20 15
CY15e CY17e CY19e CY21e CY23e CY25e
Primary demand Primary supply1
Industry-wide challenges expected to maintain
shape of the cost curve in the long run
C1 cash cost, copper US$/lb
Cumulative production
CY15e CY25e
BHP Billiton Investor Briefing, Copper Overview December 2015 10 bhpbilliton
Sustainability
Attractive
market fundamentals
Productivity and operating excellence
High-return latent
capacity
Compelling longer-term options
Supply challenges support long-run
prices
Grade decline from aging orebodies and longer cycle times expected to impact the cost of global supply
industry grades expected to decline by 17% over the next decade
Desalinated water and
pumping capacity requirements will add margin pressure in Chile
sea water now provides ~16% of total industry requirements
sea water use expected to quadruple by CY25 representing ~50% of total water usage
Labour productivity in Chile and Australia remains a key challenge
industry-wide labour productivity has decreased by >20% over the last decade
Our proactive approach to address these challenges will provide a competitive
advantage
Industry grades continue to decline
Weighted average
copper grade1, %
1.4 1.2 1.0 0.8
CY01 CY05 CY09 CY13 CY17e CY21e CY25e
Water use in copper mining in Chile
m3/second
30 20 10 0
CY09 CY13 CY17e CY21e CY25e
Fresh water Sea water
Source: Australian Bureau of Statistics, Mining Council, Wood Mackenzie, Cochilco.
1. Based on
average grade weighted by paid copper.
BHP Billiton Investor Briefing, Copper Overview December 2015 11 bhpbilliton
Sustainability
Attractive
market fundamentals
Productivity and operating excellence
High-return latent
capacity
Compelling longer-term options
A simple portfolio of large,
long-life assets
A portfolio of some of the largest assets...
FY15
attributable copper production, Mt
2
1
0
Peer 1 Peer 2 BHP Billiton Peer 3 Peer 4 Peer 5 Peer 6 Peer 7
...with significant growth upside
Net equity ownership resources1, Bt
30
20
10
0
BHP Billiton Peer A Peer B Peer C Peer D Peer E Peer F Peer G
Resolution Antamina
2,380
(58) 405 Pampa Norte:
(18) Cerro Colorado
Total Resources2, Mt Singapore
1,000 (10) (MarketingHub)
(FY15 ROM Production, Mt) 340 Pampa Norte:
Measured+Indicated (27) Spence3
Inferred
Operations 10,100
Development option (9)
Santiago 19,200
Offices (193) Escondida4
Olympic Dam
1. Net equity ownership of total Mineral Resources (inclusive of Reserves).
2. Classified
Mineral Resources on a 100% basis. Total Resources rounded to the third significant figure. A complete breakdown by Resource classification is provided on slide 4.
3. Excludes 2.3 Bt Mineral Resources declared for Spence Hypogene.
4.
Excludes combined 7.9 Bt of Mineral Resources declared for Pampa Escondida, Pinta Verde and Chimborazo.
BHP Billiton Investor Briefing, Copper Overview December
2015
12
bhpbilliton
Sustainability Attractive market fundamentals Productivity and operating excellence High-return latent capacity
Compelling longer-term options
Our strong margins have significant upside
We
are competitively placed on the cost curve steep tail underpins attractive margins for low-cost producers in the long term
We will further improve our cost
competitiveness despite industry challenges productivity efforts are reducing costs across all our assets
Escondidas three concentrator
strategy sustains its cost position despite grade decline and increasing key input costs
SGO delivers a competitive cost structure over a longer life at
Spence shift to SMA significantly reduces unit costs at Olympic Dam
Targeting unit costs of US$1.08/lb1 by FY17
34% reduction since FY12
Further improving our cost competitiveness
CY15, C1 cash costs, copper US$/lb
100 mines 80 mines 90 mines
20% of total 55% of total 25% of total
output output Dam Olympic Cerro Colorado output
Olympic Dam long term
Spence Escondida
Antamina
Segment #1 Segment #2 Segment #3
Fragmented, dominated by poly-metallic mines Predominantly large, low-cost porphyry copper mines Higher-cost operations
Source: C1 cost curve based on Wood Mackenzie data for peers and BHP Billiton data for own assets.
1. Unit cash costs presented net of one-off items, by-product credits, freight and TCRCs for operated copper assets (Escondida, Pampa Norte, Olympic Dam).
BHP Billiton Investor Briefing, Copper Overview December 2015 13 bhpbilliton
Sustainability Attractive market fundamentals Productivity and operating excellence High-return latent capacity
Compelling longer-term options
Our differentiated water and power solutions
Our proactive approach to securing sustainable water and power supply will emerge as a key competitive advantage
Our water strategy balances our requirements with sustainable use of aquifers
we are
optimising water recovery from our concentrator process with a targeted 30% reduction in fresh water consumption
EWS1 is 67% complete and will enable
transition from ~10% to >40% use of desalinated water by FY18
Kelar will provide 517 MW of gas-fired power and secure our long-term supply needs in a more
sustainable way while providing flexibility
can support expansion options at Escondida and Pampa Norte
83% complete and on track to be commissioned in H2 CY16
1. EWS: Escondida Water Supply
project.
Reverse smosis building
Electrical building
Pre- treatment
Reagents
Sand filters
Escondida Water Supply project
BHP Billiton Investor Briefing, Copper Overview December 2015 14 bhpbilliton
Sustainability Attractive market fundamentals Productivity and operating excellence High-return latent capacity
Compelling longer-term options
Our differentiated approach to productivity
We
have embedded US$3.2 billion of annualised productivity gains since FY12
We are methodically re-setting our cost structure through a bottom-up process
underpinned by our common operating model and systems
Our simple approach to productivity
enables continuous safe and sustainable improvement
understanding the key value and cost drivers
using benchmarks and knowledge sharing to identify the gaps
executing the required changes
safely and sustainably
1. Reported Underlying EBIT excludes Other and Third Party Products.
Our operating model for continuous improvement
What is important What is possible Closing the
gap
Key value and cost driver trees Benchmarking Execution tools
Productivity
impact on Copper Business Underlying EBIT
US$ billion
6
4
2
0
FY12 FY13 FY14 FY15
Productivity volume
Operating cash cost efficiency
Reduction in exploration and business development
Reported Underlying EBIT1
Underlying EBIT without productivity gains
BHP Billiton Investor Briefing, Copper Overview December 2015 15 bhpbilliton
Sustainability Attractive market fundamentals Productivity and operating excellence High-return latent capacity
Compelling longer-term options
Step change in productivity across all assets
Escondida
7% reduction in unit costs at Escondida to US$1.01/lb1 in FY15
supported by operational improvements, supply optimisation and labour productivity
Grade adjusted unit costs expected to decline a further 14% in FY162
an additional 7%
reduction anticipated in FY172
Moving more tonnes per FTE3 at a lower cost
Escondida, index, FY14=100
170
135
100
65
30
FY14 FY15 12 months 3 months Oct 15
to Oct 15 to Oct 15
Mine unit cost Material mined per FTE
Productivity efforts offset grade decline at Escondida
US$/lb1
1.50
1.00 14%
0.50
0.00
FY12 FY13 FY14 FY15 FY16e FY17e
Unit cost Unit cost (grade adjusted) Grade impact
1. Unit cash costs presented net of one-off
items, by-product credits, freight and TCRCs. Relative to FY14. FY15 one-off items relate to the implementation of the Escondida voluntary redundancy program which is expected to reduce employee head count by >20%.
2. FY16 and FY17 unit costs presented on a FY15 grade-equivalent basis; unit costs prior to grade adjustment of US$1.21/lb in FY16 and US$1.08/lb in FY17; exchange rates of USD/CLP
702 in FY16e and 729 in FY17e.
3. Full time equivalent (FTE) employees and contractors.
BHP Billiton Investor Briefing, Copper Overview December 2015 16 bhpbilliton
Sustainability Attractive market fundamentals Productivity and operating excellence High-return latent capacity
Compelling longer-term options
Step change in productivity across all assets
Pampa Norte
Significantly reduced unit costs at Spence
targeting a 10% reduction to US$0.87/lb by FY171
dry plant throughput expected
to increase 20% to 56 ktpd by FY161
Improving competitiveness at Cerro Colorado
targeting a 10% reduction to US$1.91/lb by FY171
supported by
increased throughput as well as contractor and labour productivity
Olympic Dam
~48% reduction in unit costs to US$1.00/lb in FY172
labour
efficiencies and contract and supply renegotiations
Reducing unit costs at Pampa Norte1
US$/lb
4.0
3.0
2.0
1.0
0.0
FY12 FY13 FY14 FY15 FY16e FY17e
Spence Cerro Colorado
Transformational reduction of unit costs at Olympic Dam2
US$/lb
4.0
3.0
2.0
1.0
0.0
FY12 FY13 FY14 FY15 FY16e FY17e
1. Relative to FY15. Unit cash costs presented net of one-off items and freight with sales volumes adjusted for impact of intercompany sales and purchases. Based on exchange rates
of USD/CLP 702 in FY16e and 729 in FY17e.
2. Relative to FY15. Unit cash costs presented net of by-product credits. Based on exchange rates of AUD/USD 0.73 in
FY16e and 0.72 in FY17e.
BHP Billiton Investor Briefing, Copper Overview December 2015 17 bhpbilliton
Sustainability Attractive market fundamentals Productivity and operating excellence High-return latent capacity
Compelling longer-term options
Releasing latent capacity at low cost
Escondida
~1.2 Mtpa average production capacity for a decade from FY16
guidance maintained at 940 kt in FY16
~15% production uplift
expected in FY17
no new major capital required for a decade
grades recover to ~1% in the early 2020s
OGP1 concentrator achieved mechanical completion in May 2015
reaching full production during FY16
EWS on schedule for completion in CY17
supports three concentrator strategy
Working to extend the life of Los Colorados to at least FY301
supports a 70%2 uplift in throughput to 375 ktpd at very low capital intensity
Grade
decline will be offset by higher throughput
Production, Mt Mill head grade, %
1.5 1.8
1.0 1.4
0.5 1.0
0.0 0.6
FY12 FY13 FY14 FY15 FY16e FY17e
Total production Mill head grade
Limited capital required beyond EWS
Escondida major capital expenditure3, US$ billion
3.0
2.0
1.0
0.0
FY12 FY13 FY14 FY15 FY16e FY17e
1. Subject to Escondida Owners Council
approval.
2. Three concentrators with potential to increase throughput capacity to ~375 ktpd relative to the 220 ktpd average achieved in FY14.
3. Excludes maintenance and minor and improvement capital.
BHP Billiton Investor Briefing,
Copper Overview December 2015 18 bhpbilliton
Sustainability Attractive market fundamentals Productivity and operating excellence High-return latent capacity
Compelling longer-term options
Releasing latent capacity at low cost
Olympic
Dam
Access to higher-grade SMA ore optimises utilisation of existing surface infrastructure
low-cost acceleration of drilling plans
will support copper grades >2.2% from
FY21
potential to achieve average utilisation of ~220 ktpa capacity over the next decade
Spence Recovery Optimisation Project
Low capital intensity project to accelerate heap leach
kinetics
increases leach pad utilisation and improves recoveries by 12 percentage points
can support tankhouse capacity of ~200 ktpa between FY16 and FY19
grades
expected to average ~0.7% for remaining mine-life of supergene to mid 2020s
Accessing SMA to fully utilise surface infrastructure
Olympic Dam production, kt Mill head grade, %
225 2.5
150 2.0
75 1.5
0 1.0
FY12 FY13 FY14 FY15 FY16e FY17e
Total production Mill head grade
Improved recoveries through heap leach optimisation
Spence production, kt Grade, %
225 1.5
150 1.0
75 0.5
0 0.0
FY12 FY13 FY14 FY15 FY16e FY17e
Total production Grade
BHP Billiton Investor Briefing, Copper Overview December 2015
19
bhpbilliton
Sustainability Attractive market fundamentals Productivity and operating excellence High-return latent capacity
Compelling longer-term options
Releasing latent capacity at low cost
Total
production expected to return to 1.7 Mt by FY17
Mt
2.0
1.5
1.0
0.5
0.0
FY12 FY13 FY14 FY15 FY16e FY17e
Escondida Spence Cerro Colorado
Olympic Dam Antamina
Unit costs expected to decline to US$1.08/lb by FY171
US$/lb
2.0
1.5
1.0
0.5
0.0
FY12 FY13 FY14 FY15 FY16e FY17e
Escondida grade impact
Unit cost (Escondida grade adjusted)
Unit cost
1. Unit cash costs presented net of one-off items, by-product credits, freight and TCRCs for operated copper assets (Escondida, Pampa Norte, Olympic Dam).
BHP Billiton Investor Briefing, Copper Overview December 2015 20 bhpbilliton
Sustainability Attractive market fundamentals Productivity and operating excellence High-return latent capacity
Compelling longer-term options
A compelling long-term growth pipeline
Spence
Growth Option
Development of the 2.3 Bt hypogene resource
The project has
advanced to feasibility with final Board review expected in 18 months
potential to start production in FY20
Competitive capital cost estimate of less than US$2.2 billion will support attractive returns1
construction of a 95 ktpd concentrator
supergene leaching
continues until ~FY25 supplemented by low-grade hypogene leaching from early 2020s
potential to deliver incremental copper capacity of ~200 ktpa in the
first 10 years
Outsourcing options being assessed for development of desalination plant
Attractive copper and molybdenum grades will support solid second segment C1 cost position
1.
Excludes desalination plant.
2. Solvent extraction and electrowinning.
Current operations SGO scope
Heap leaching Concentrator
Oxide Supergene Hypogene
Primary crushing Primary crushing
Stacking & leaching
95 ktpd concentrator plant
SX & EW plant2 Outsourcing
Copper cathodes Desalination plant Copper concentrate
BHP Billiton Investor Briefing, Copper Overview December 2015 21 bhpbilliton
Sustainability Attractive market fundamentals Productivity and operating excellence High-return latent capacity
Compelling longer-term options
A compelling long-term growth pipeline
Olympic
Dam Underground Expansion
Underground expansion to increase ore hoisted to ~20 Mtpa through an additional shaft
Potential to deliver ~450 ktpa1 of total copper production from CY25
First segment C1 cost
position post by-product credits
Includes a capital-efficient heap leach stream operating in parallel with current concentrator and uranium leach operations
Progressing to pre-feasibility in CY17 subject to internal approval
Maintains
longer-term optionality for open-pit development
Cribs at heap leach pilot plant facility
1. ~750 ktpa on a copper equivalent basis (including gold, silver and uranium by-products).
BHP Billiton Investor Briefing, Copper Overview December 2015
22
bhpbilliton
Sustainability Attractive market fundamentals Productivity and operating excellence High-return latent capacity
Compelling longer-term options
Working to expand our long-term options
Exploration
Increasing our long-term copper options is a strategic priority
greenfield exploration budget of US$65 million for FY16
Greenfield
exploration targeting Tier 1 discoveries in the Americas
Safe, focused and disciplined programs governed by strong frameworks
>70% reduction in operational costs since FY13 supported by drilling efficiencies
Resolution (BHP Billiton 45%, Rio Tinto 55%)
Significant long-term growth
option as one of the best undeveloped copper deposits in the world
Focused on optimising value through active engagement with our joint venture partner
Our exploration program is focused on the Americas
Tucson
Lima
Santiago
Exploration offices
Porphyry copper belts
BHP Billiton Investor Briefing, Copper Overview December 2015
23
bhpbilliton
Key themes
We value safe
and sustainable operations above all else
Attractive fundamentals expected to support long-term prices
robust long-term demand growth and industry-wide supply challenges point to structural deficit
We have the largest resource base
large, long-life, expandable assets competitively
positioned on the cost curve
World-class operating capability
targeting unit costs of US$1.08/lb1 by FY17 (34% reduction since FY12) differentiated water and power solutions to provide a competitive advantage
Release
of latent capacity delivers more volumes at very low cost
Escondida: ~1.2 Mtpa average production capacity for a decade from FY16
Spence: optimisation initiatives to support utilisation of ~200 ktpa capacity from FY16
Olympic Dam: SMA2 expected to support utilisation of ~200 ktpa capacity from FY16 and ~220 ktpa by FY19
Strong growth pipeline with competitive returns
SGO2 advanced to feasibility with
potential first production in FY20
creating staged optionality for substantial long-term growth at Olympic Dam
1. Unit cash costs presented net of one-off items, by-product credits, freight and TCRCs for operated copper assets (Escondida, Pampa Norte, Olympic Dam).
2. SMA: Southern Mine Area; SGO: Spence Growth Option.
BHP Billiton Investor Briefing, Copper
Overview December 2015
24
bhpbilliton
bhpbilliton
bhpbilliton
Copper
Marketing
Attractive industry fundamentals
Vicky Binns, Vice President
Marketing, Copper
Andrew Arthur, Vice President Strategy and Development, Copper
Port Coloso
Disclaimer
Forward-looking statements
This presentation contains forward-looking
statements, including statements regarding: trends in commodity prices and currency exchange rates; demand for commodities; plans, strategies and objectives of management; closure or divestment of certain operations or facilities (including
associated costs); anticipated production or construction commencement dates; capital costs and scheduling; operating costs and shortages of materials and skilled employees; anticipated productive lives of projects, mines and facilities; provisions
and contingent liabilities; tax and regulatory developments.
Forward-looking statements can be identified by the use of terminology such as intend,
aim, project, anticipate, estimate, plan, believe, expect, may, should, will, continue, annualised or
similar words.
These statements discuss future expectations concerning the results of operations or financial condition, or provide other forward-looking
statements.
These forward-looking statements are not guarantees or predictions of future performance, and involve known and unknown risks, uncertainties and other
factors, many of which are beyond our control, and which may cause actual results to differ materially from those expressed in the statements contained in this presentation. Readers are cautioned not to put undue reliance on forward-looking
statements.
For example, future revenues from our operations, projects or mines described in this presentation will be based, in part, upon the market price of the
minerals, metals or petroleum produced, which may vary significantly from current levels. These variations, if materially adverse, may affect the timing or the feasibility of the development of a particular project, the expansion of certain
facilities or mines, or the continuation of existing operations.
Other factors that may affect the actual construction or production commencement dates, costs or
production output and anticipated lives of operations, mines or facilities include our ability to profitably produce and transport the minerals, petroleum and/or metals extracted to applicable markets; the impact of foreign currency exchange rates
on the market prices of the minerals, petroleum or metals we produce; activities of government authorities in some of the countries where we are exploring or developing these projects, facilities or mines, including increases in taxes, changes in
environmental and other regulations and political uncertainty; labour unrest; and other factors identified in the risk factors discussed in BHP Billitons filings with the US Securities and Exchange Commission (the SEC) (including
in Annual Reports on Form 20-F) which are available on the SECs website at www.sec.gov.
Except as required by applicable regulations or by law, the Group
does not undertake any obligation to publicly update or review any forward-looking statements, whether as a result of new information or future events.
Past
performance cannot be relied on as a guide to future performance.
Non-IFRS financial information
BHP Billiton results are reported under International Financial Reporting Standards (IFRS) including Underlying EBIT and Underlying EBITDA which are used to measure segment
performance. This release may also include certain non-IFRS measures including Adjusted effective tax rate, Attributable profit excluding exceptional items, Free cash flow, Gearing Ratio, Net debt, Net operating assets, Underlying attributable
profit, Underlying basic earnings per share, Underlying EBIT margin, Underlying EBITDA margin, Underlying EBITDA interest coverage and Underlying return on capital. These measures are used internally by management to assess the performance of our
business, make decisions on the allocation of our resources and assess operational management. Non-IFRS measures have not been subject to audit or review and should not be considered as an indication of or alternative to an IFRS measure of
profitability, financial performance or liquidity.
Presentation of data
Unless specified otherwise, all data is presented on a continuing operations basis to exclude the contribution from assets that were demerged with South32 and
references to Underlying EBITDA margin and Underlying EBIT margin exclude third party trading activities.
No offer of securities
Nothing in this presentation should be construed as either an offer to sell or a solicitation of an offer to buy or sell BHP Billiton securities in any jurisdiction, or be treated
or relied upon as a recommendation or advice by BHP Billiton.
Reliance on third party information
The views expressed in this presentation contain information that has been derived from publicly available sources that have not been independently verified. No representation or
warranty is made as to the accuracy, completeness or reliability of the information. This presentation should not be relied upon as a recommendation or forecast by BHP Billiton.
BHP Billiton Investor Briefing, Marketing December 2015
2
bhpbilliton
Key themes
Our
proprietary view on the copper market is supported by deep fundamental analysis
Robust copper demand expected from China and non-OECD countries
copper demand is sustained across the economic development cycle
continued
displacement of copper through substitution is a risk
Supply is increasingly challenged
current production battling falling grades, disruptions and delays
future
production expected to require significant infrastructure investment
Forecast near-term oversupply expected to transition to a structural deficit from FY19
We are increasing transparency and capturing full value-in-use for our products
BHP Billiton Investor Briefing, Marketing December 2015
3
bhpbilliton
Our copper market analysis is rigorous
Our outlook is based on a granular understanding of key global trends
sectoral
consumption patterns
technological innovation
evolving policy
landscape
Proprietary analysis underpins our understanding of market dynamics
product substitution and recycling
mine by mine production and
cost profiles over time
timing, capex and capacity of new sources of supply
Copper demand analysis driver tree
China
Power
Distribution
Incremental
F GDP
demand
infrastructure
cable
length
Power cable
coefficient
Generators
Copper
intensity
# of units
Construction
Transformers
Copper intensity
Consumer
durables
Others
Transportation
Legend
Capital goods
Addition
Multiplication
F Function
Other
Example breakdown for power sector
BHP Billiton Investor Briefing, Marketing December 2015
4 bhpbilliton
China is rebalancing towards sustainable growth
Short term
Expecting a trade-off between growth and government reforms in CY16
Growth target for the 13th Five Year Plan for period CY16-CY20 expected to be ~6.5% per annum
Longer term
We expect China will continue to rebalance to slower, more
sustainable growth
consumption and services oriented
Economic reform
is crucial
social, State-Owned Enterprise (SOE) reforms and financial liberalisation
Source: CEIC, IHS World Industry Services.
GDP growth has been moderating in China
GDP growth, %
12
10
8
6
4
Mar 11
Sep 12
Mar 14
Sep 15
YoY
QoQ (annualised)
Chinas shift to consumption-led growth is underway
Sectoral share of Chinese GDP, %
100
75
50
25
0
CY80
CY90
CY00
CY10
CY20e
CY30e
Agricultural
Industry
Services
BHP Billiton Investor Briefing, Marketing December 2015
5 bhpbilliton
Chinas shift to consumption supports copper demand
Continued urbanisation and greater prosperity
a further 240 million people
are expected to urbanise by CY30
growing middle class will increase consumption
driving copper demand from all sectors of the economy
refurbishment and fit out
of new and existing housing
increasing penetration of consumer durables and passenger cars
expansion and upgrade of power infrastructure
Source: United Nations; Wood Mackenzie;
BHP Billiton analysis.
1. Purchasing Power Parity (PPP).
Copper intensity
expected to increase in China
kg/capita
40
US, 1960-2010
30
Japan, 1960-2010
Germany, 1960-2010
20
Korea, 1971-2010
10
China, 1980-2015
0
India, 1980-2015
0
20
40
60
GDP per capita, US$000 2010 PPP1
Copper demand expected to rebalance with economy
% of total demand in China
100
75
50
25
0
CY00
CY15e
CY30e
CY00
CY15e
CY30e
Investment-driven
Power & infrastructure
Consumption-driven
Construction - installation
Other
Capital goods
Construction - refurbishment
Consumer durables
Transportation
Other
BHP Billiton Investor Briefing, Marketing December 2015
6 bhpbilliton
Chinas consumption of primary copper is increasing
China will continue to require additional primary units
primary copper consumption is
expected to grow by ~2% per annum to CY30
An increasing share of Chinas demand is expected to be satisfied by scrap
currently ~30% of copper consumed
potentially rising to >35% by CY30
We analyse Chinese scrap availability in depth
scrap generation is a
function of product life-cycle and recycling rates
scrap availability forecast to increase by 3-4% per annum to CY30
market to remain price sensitive
Chinas growth in scrap and primary consumption
Mt 20 15 10 5 0 CY15e
CY20e CY25e CY30e
Primary copper consumption Scrap consumption
Product life-cycle critical to scrap availability
China vs. Global, years
80 60 40 20 0
Power Construction Consumer durables Transportation Capital goods
China range Global average
Source: Wood Mackenzie; Antaike; ICA; Fraunhofer ISI; BHP Billiton analysis.
BHP Billiton Investor Briefing, Marketing December 2015
7 bhpbilliton
Consumption growth ex-China remains robust
Total demand in non-OECD countries is expected to grow at ~3.6% per annum to CY30
infrastructure build-out is a key government focus in India
substantial scope for urban development in other developing countries such as Indonesia and
Vietnam
Total demand in OECD countries is expected to fall ~0.6% per annum to CY30
renewables and growing penetration of electric vehicles are likely to support demand
World ex-China contributes half of global demand by CY30
Forecast global
total copper demand by region, %
CY15e OECD 36 China 44 Non-OECD 20
CY30e
OECD 24 China 51 Non-OECD 25
Sustained demand growth ex-China
Forecast total
copper demand, index CY10=100
200 150 100 50 0
CY10 CY15e CY20e CY25e CY30e
Non-OECD ex China OECD Total ex-China
Source: Wood Mackenzie.
BHP Billiton Investor Briefing, Marketing December 2015
8 bhpbilliton
Opportunities and threats to copper demand
Copper demand is resilient across different scenarios, including a low-carbon environment
rising demand for energy efficient technologies
copper-intensive solutions in the power and machinery sectors
Substitution risks from aluminium in power cable and other end-use products
growing acceptance of aluminium alloy cable (AAC) by Chinese grid companies
we
assume 2-6% of total Chinese copper demand loss by CY30
International Copper Association (ICA) promoting copper power cable benefits
Source: ICA; BHP Billiton analysis.
1. Relative to long-term demand in central case.
2. China Nonferrous Metals Industry Association.
Long-term commodity demand
range in a 2°C world
Index, central case = 100
125 100 75 50
Energy coal Metallurgical coal Oil Henry Hub gas Copper
Long-term demand range across Global
Accord scenario and shock event1
2014 actual demand1 Iron ore
Tracking
substitution developments
National codification Chinese national standard is drafted and about to be released
CNIA2 attitude Promoting aluminium substitution to provide solution for aluminium overcapacity
Chinas grid attitude
Southern Grid endorsed usage of AAC
State Grid identified AAC as potential technology
One local cable maker affiliated with State
Grid began to produce AAC
Price difference
Metal cost 30-50% cheaper; however
efficiency losses and higher installation/maintenance cost
BHP Billiton Investor Briefing, Marketing December 2015
9 bhpbilliton
New copper supply growing in the near term
Projects executed in high price environment over the past decade are starting to ramp up
~2.7 Mt of potential net additional output anticipated by CY17
To date
the supply response to lower prices has been limited
exchange rate movements have partially offset impact of falling prices on margins
cost saving initiatives and lower fuel prices have limited closures
Mine disruptions
and delays have provided some relief
primary mine disruptions are likely to exceed historical average this year
significant project delays
Market expected to remain modestly oversupplied over the
next few years
Growing supply in the short run as new projects ramp up
Net
annual incremental potential production, Mtpa
2.0 1.5 1.0 0.5 0.0
CY15 CY16
CY17
Supply continues to face disruptions
% of forecast annual production
8 6 4 2 0
CY04 CY05 CY06 CY07 CY08 CY09 CY10 CY11 CY12 CY13 CY14 YTD CY15
Other Cost related Average Sep
Source: Wood Mackenzie; BHP Billiton analysis.
BHP Billiton Investor Briefing, Marketing December 2015
10 bhpbilliton
but a significant structural deficit is forecast
2% annual potential supply reduction is expected following peak production in CY17, equivalent to ~400 kt per annum
grade has reduced by 19% since CY00
grades expected to decline a further 17% by
CY25 due to maturing porphyry orebodies
Depletion of current operations adds to supply decline
no significant new discoveries to offset impact of ageing orebodies
A structural
deficit is forecast to emerge towards the end of the decade
additional supply will be required to meet growing demand in the long run
Expecting continued ore grade decline
Copper grades1, %
1.50 1.30 1.10 0.90
CY00 CY05 CY10 CY15e CY20e CY25e
Deficit expected to emerge at the end of the decade
Copper, Mt
30 25 20 15 10
CY15e CY20e CY25e
Base case supply Highly probable supply
Primary demand
Source: Wood Mackenzie; BHP Billiton analysis.
1. Based on average grade weighted by paid
copper.
BHP Billiton Investor Briefing, Marketing December 2015
11
bhpbilliton
Higher cost of new supply expected to support stronger long-term prices
New supply expected to come from higher-cost projects facing increasing challenges
higher capital for infrastructure such as desalination capacity to manage water constraints in Chile
power and logistics will require significant investment
(e.g. the African Copperbelt)
community opposition and permitting issues are making approvals increasingly difficult (e.g. Peru, Chile and USA)
location in higher-risk jurisdictions impacts execution timelines and requires higher returns
These factors underpin higher project and expansion incentive prices in the long run
Demand
growth is expected to keep price in the steep part of the cost curve supporting high margins for low-cost producers
Continuous capital expenditure escalation
Initial capital intensity1, 2013 US$000/tpa copper equivalent
18 12 6 0
CY11 CY12 CY13 CY14
Greenfield Brownfield
Long-run incentive price/cost curve
C1 copper cost, US$/lb
Potential primary supply, Mtpa
Current Committed
Uncommitted induced Uncommitted not induced
Source: Wood Mackenzie; BHP Billiton analysis.
1. Based on original expenditure and actual commissioning year.
BHP Billiton
Investor Briefing, Marketing December 2015
12 bhpbilliton
Increasing transparency to enhance value
We continue to drive market transparency and improve price realisation
we report to
price index providers to facilitate price transparency
shifting away from annual benchmark pricing for TCRCs1 and cathode premiums
increasing proportion of sales utilising short-term pricing mechanisms and spot terms
Copper Marketing has identified ~15 value-accretive projects to support the productivity agenda
optimised vessel sizes and discharge ports added US$8.4 million in FY15
optimising cathode supply chain to reduce working capital by ~US$36 million in FY16
Copper TCRC indices outperforming benchmark
Treatment charge, US$/dmt
150 Benchmark
100 50 0
Jan 15 Feb 15 Mar 15 Apr 15 May 15 Jun 15 Jul 15 Aug 15 Sep 15 Oct 15
WoodMac mine-to-trader index
CRU mine-to-smelter index
MB index2
Source: Wood Mackenzie; CRU; Metal Bulletin; BHP Billiton analysis.
1. Treatment charge and refining charge.
2. Tonnage-weighted calculation of actual
transactions normalised to a base specification and delivery point, using the value-in-use for materials applied by the market.
BHP Billiton Investor Briefing,
Marketing December 2015
13 bhpbilliton
Realising the fair value of our products
The value of Escondidas concentrate to customers depends on individual smelter constraints and our grade relative to others
Value-in-use (VIU) is mainly determined by the composition of the copper concentrate
copper grade
slag to copper ratio
sulphur to copper ratio
impurities
precious metals
We optimise grades and recoveries at Escondida based on key value-in-use drivers
Improving the
understanding of our concentrate value
Escondida TCRC premium or discount by technology and blending1
Premium
Discount
Lower slag improves smelter metal recoveries
Slag to copper ratio
5 4 3 2 1 0 Escondida
1. Escondida copper concentrate TCRC premium or discount in relation to
average concentrate qualities in the market based on internal VIU analysis for sample smelters.
BHP Billiton Investor Briefing, Marketing December 2015
14 bhpbilliton
Key themes
Our
proprietary view on the copper market is supported by deep fundamental analysis
Robust copper demand expected from China and non-OECD countries
copper demand is sustained across the economic development cycle
continued
displacement of copper through substitution is a risk
Supply is increasingly challenged
current production battling falling grades, disruptions and delays
future
production expected to require significant infrastructure investment
Forecast near-term oversupply expected to transition to a structural deficit from FY19
We are increasing transparency and capturing full value-in-use for our products
BHP Billiton Investor Briefing, Marketing
December 2015
15 bhpbilliton
bhpbilliton
bhpbilliton
Copper
Financial Performance
Strong margins through the cycle
Graham Tiver
Vice President Finance, Copper
Escondida
Disclaimer
Forward-looking statements
This presentation contains forward-looking
statements, including statements regarding: trends in commodity prices and currency exchange rates; demand for commodities; plans, strategies and objectives of management; closure or divestment of certain operations or facilities (including
associated costs); anticipated production or construction commencement dates; capital costs and scheduling; operating costs and shortages of materials and skilled employees; anticipated productive lives of projects, mines and facilities; provisions
and contingent liabilities; tax and regulatory developments.
Forward-looking statements can be identified by the use of terminology such as intend,
aim, project, anticipate, estimate, plan, believe, expect, may, should, will, continue, annualised or
similar words.
These statements discuss future expectations concerning the results of operations or financial condition, or provide other forward-looking
statements.
These forward-looking statements are not guarantees or predictions of future performance, and involve known and unknown risks, uncertainties and other
factors, many of which are beyond our control, and which may cause actual results to differ materially from those expressed in the statements contained in this presentation. Readers are cautioned not to put undue reliance on forward-looking
statements.
For example, future revenues from our operations, projects or mines described in this presentation will be based, in part, upon the market price of the
minerals, metals or petroleum produced, which may vary significantly from current levels. These variations, if materially adverse, may affect the timing or the feasibility of the development of a particular project, the expansion of certain
facilities or mines, or the continuation of existing operations.
Other factors that may affect the actual construction or production commencement dates, costs or
production output and anticipated lives of operations, mines or facilities include our ability to profitably produce and transport the minerals, petroleum and/or metals extracted to applicable markets; the impact of foreign currency exchange rates
on the market prices of the minerals, petroleum or metals we produce; activities of government authorities in some of the countries where we are exploring or developing these projects, facilities or mines, including increases in taxes, changes in
environmental and other regulations and political uncertainty; labour unrest; and other factors identified in the risk factors discussed in BHP Billitons filings with the US Securities and Exchange Commission (the SEC) (including
in Annual Reports on Form 20-F) which are available on the SECs website at www.sec.gov.
Except as required by applicable regulations or by law, the Group
does not undertake any obligation to publicly update or review any forward-looking statements, whether as a result of new information or future events.
Past
performance cannot be relied on as a guide to future performance.
Non-IFRS financial information
BHP Billiton results are reported under International Financial Reporting Standards (IFRS) including Underlying EBIT and Underlying EBITDA which are used to measure segment
performance. This release may also include certain non-IFRS measures including Adjusted effective tax rate, Attributable profit excluding exceptional items, Free cash flow, Gearing Ratio, Net debt, Net operating assets, Underlying attributable
profit, Underlying basic earnings per share, Underlying EBIT margin, Underlying EBITDA margin, Underlying EBITDA interest coverage and Underlying return on capital. These measures are used internally by management to assess the performance of our
business, make decisions on the allocation of our resources and assess operational management. Non-IFRS measures have not been subject to audit or review and should not be considered as an indication of or alternative to an IFRS measure of
profitability, financial performance or liquidity.
Presentation of data
Unless specified otherwise, all data is presented on a continuing operations basis to exclude the contribution from assets that were demerged with South32 and
references to Underlying EBITDA margin and Underlying EBIT margin exclude third party trading activities.
No offer of securities
Nothing in this presentation should be construed as either an offer to sell or a solicitation of an offer to buy or sell BHP Billiton securities in any jurisdiction, or be treated
or relied upon as a recommendation or advice by BHP Billiton.
Reliance on third party information
The views expressed in this presentation contain information that has been derived from publicly available sources that have not been independently verified. No representation or
warranty is made as to the accuracy, completeness or reliability of the information. This presentation should not be relied upon as a recommendation or forecast by BHP Billiton.
BHP Billiton Investor Briefing, Copper Finance
December 2015
2
bhpbilliton
Key themes
Our Copper
Business delivers strong margins through the cycle
average Underlying EBIT margin of 37% over the last three years
Sustainable productivity gains
offsetting grade decline and industry cost pressures
targeting unit costs of US$1.08/lb1 by FY17
>US$1 billion of supply
savings expected by FY172
Improving capital efficiency to sustain current operations and enable future growth
all opportunities that deserve investment are receiving capital
we continue to optimise
maintenance and minor and improvement capital
our major growth options will benefit from attractive longer-term fundamentals
We have a platform for outstanding long-term cash flow generation
1. Unit cash costs presented
net of one-off items, by-product credits, freight and TCRCs for operated copper assets (Escondida, Pampa Norte, Olympic Dam).
2. Relative to FY14.
BHP Billiton Investor Briefing, Copper Finance
December 2015
3
bhpbilliton
A high-margin business with strong returns
Over the last three years the Copper Business has delivered consistently strong results
average copper production of 1.7 Mtpa
average Underlying EBIT margin of 37%
average return on net operating assets of 20%1
EBIT contribution by asset is
diversified by process, product and location
Our major capital commitments are rolling-off supporting even greater cash flow flexibility
expenditure at Escondida expected to decrease to <US$400 million in FY17 from an average of US$1.7 billion over FY12-162
OGP1 recently commissioned and EWS to be completed in CY17
continuing to improve the capital
efficiency of SGO and the Olympic Dam Expansion
Underlying EBIT
US$ billion
Index, FY13=100
6 125
4 100
2 75
0 50
FY13 FY14 FY15 FY16e FY17e
EBIT
Copper realised price (RHS)
Cash unit cost (Escondida grade adjusted to FY15, RHS)
Underlying EBIT Contribution by Asset3
FY17e, %
Olympic Dam
18
Antamina
15 Escondida
56
Pampa Norte
11
1. Represents Underlying EBIT divided by Net Operating Assets.
2. Excludes maintenance and minor and improvement capital.
3. Excludes Other which
includes division overheads; Escondida shown on BHP Billiton share basis.
BHP Billiton Investor Briefing, Copper Finance
December 2015
4
bhpbilliton
Mitigating lower grades and prices through productivity
We are offsetting the impact of lower grades and prices through greater productivity
US$3.2
billion of annualised productivity gains since FY12
Focused cost and productivity programs are delivering results across all our assets
employee and contractor productivity
price and demand led supply savings
plant and equipment utilisation
Targeting a 34% reduction1 in unit cash costs at our operated
assets between FY12 and FY17
Higher volumes from the release of latent capacity will dilute our fixed cost base
three concentrator strategy at Escondida2
recovery optimisation at Spence
Southern Mine Area at Olympic Dam
Significant reduction in cash unit cost since FY121
US$/lb
2.0
1.63
1.41
1.39
1.27
1.10
1.08
1.0
0.0
FY12
FY13
FY14
FY15
FY16e
FY17e
Escondida grade impact
Driven by productivity led improvements1
US$/lb
down 34%
2.0
1.63
1.0
0.27
1.08
0.88
0.15
0.13
0.20
0.0
FY12
Exchange rate benefit
Productivity (volumes)
Productivity (costs)
FY17e
Escondida grade adjustment
FY17e grade adjusted
1. Unit cash costs presented net of one-off items, by-product credits,
freight and TCRCs for operated copper assets (Escondida, Pampa Norte, Olympic Dam).
Escondida grade adjusted to FY15.
2. Subject to Escondida Owners Council approval.
BHP Billiton Investor Briefing, Copper
Finance
December 2015
5
bhpbilliton
Achieving significant cost efficiencies
We expect our sustainable productivity programs to more than offset industry-wide cost pressures
we will improve our position on the cost curve
We are moving more material at
lower costs to offset grade decline
27% increase in material movement from FY12 to FY17
cash costs per tonne of material mined are expected to decline ~40% from FY12 to FY17
Our
water and power solutions will enable increased throughput albeit at higher costs
electricity cost expected to increase ~10%2 by end of the decade at Escondida
average cost of water expected to increase ~35%3 by end of the decade at Escondida
pursuing opportunities to offset cost increases through mitigating strategies
Moving more
material (ex-pit) at lower cost1
Index, FY12=100
140
120
100
80
60
FY12
FY13
FY14
FY15
FY16e
FY17e
Material mined
Cash costs per tonne of material mined
Cash cost breakdown1
Currency split1
FY17e, %
Other
FY17e, %
7
Labour
Fuel &
14
energy
17
Local
43
US$
57
Consumables
Contractors
28
34
1. Operated copper assets (Escondida, Pampa Norte and Olympic Dam).
2. Relative to FY15; Based on internal BHP Billiton price protocol.
3. Relative to FY15;
Includes cost of electricity; From all sources: fresh, recovered and desalinated.
BHP Billiton Investor Briefing, Copper Finance
December 2015
6
bhpbilliton
A step change in people productivity
All assets are delivering a step change in people productivity supported by FTE1 reductions in FY162
implementation of Voluntary Redundancy Program and contractor optimisation drives 28% reduction at Escondida
insourcing contractor activities will contribute to a net 19% reduction at Pampa Norte
20%
reduction expected at Olympic Dam
Functional headcount expected to decline 45% by FY17 through simplification of support structures
delayering organisation levels
reviewing optimal span of control
aggregation of certain activities in Santiago
leveraging shared services
Improving people productivity
Material mined (ex-pit), kt/FTE1
50
up 80%
40
30
20
10
0
FY14
FY15
FY16e
FY17e
Simplifying our support functions
Functional FTE3
2,500
down 30%
further 15% reduction
2,000
1,500
1,000
500
0
FY14
FY15
FY16e
FY17e4
1. Full time equivalent (FTE) comprises employees and contractors at BHP Billiton operated assets.
2. Relative to FY14.
3. Functional full time equivalent includes Finance, Supply, Information
Systems, Human Resources, Strategy & Business Development, Health Safety & Environment and Major Projects.
4. FY16 to FY17 driven by reduced
Major Project activity.
BHP Billiton Investor Briefing, Copper Finance
December 2015
7
bhpbilliton
>US$1 billion of supply savings by FY17
We expect to achieve >US$1 billion of sustainable annualised supply savings by FY171
~45%
of targeted savings have been achieved as at 31 October 2015
further upside to come from a robust pipeline of opportunities
We are resetting our cost base by challenging the status quo
ensuring our vendors are fully
subscribed to our productivity agenda
switching to performance based vendor payment structures
exploring low-cost country sourcing opportunities
>US$1 billion reduction in external
expenditure by FY171
(US$ billion)
1.5
1.0
0.5
0.0
Demand reduction
Process optimisation
Contract negotiation
Insourcing
Delivering tangible results
Asset
Service
% Saving
How was this achieved?
Escondida
Maintenance contractor
53
Tool-time improvement and supplier consolidation
Escondida
Equipment rental
50
Cross-asset initiatives resulting in price saving and reduction in demand
Pampa Norte
Plant production services
39
Competitive bidding process
Olympic Dam
Consumable supplier
34
Low-cost country sourcing
1. Annualised basis relative to FY14.
BHP Billiton Investor Briefing, Copper Finance
December 2015
8
bhpbilliton
Maximising plant and equipment utilisation
Our focus on maximising the underlying performance of our plant and equipment is delivering results
each incremental tonne further dilutes the fixed cost base and delivers a cash margin of ~70%1
Overall Equipment Effectiveness (OEE) improved for Ultra Class Trucks
fleet
optimisation through monitoring truck queue and shovel wait time
larger, less frequent blasts
OEE also improved for Semi Autogenous Grinding (SAG) mills
optimisation of maintenance
strategies
adoption of advanced monitoring technology resulting in system stability improvements
Improving Ultra Class Truck performance2
OEE, %
70
60
50
FY13
FY14
FY15
FY16
Improving SAG mill performance2
Concentrator OEE, %
100
75
Planned shutdowns
50
FY13
FY14
FY15
FY16
1. Based on fixed/variable cost split of 48%:52%; exchange rates of USD/CLP 728 and AUD/USD 0.72; copper price of US$2.10/lb.
2. Operated copper assets (Escondida, Pampa Norte, Olympic Dam).
BHP Billiton Investor
Briefing, Copper Finance
December 2015
9
bhpbilliton
Improving our capital efficiency
Maintenance capital
We will not compromise the integrity of our plant and equipment
reduction in maintenance capital supported by improved equipment and people productivity
Minor and improvement capital
We are unlocking latent capacity at very low capital intensity
to deliver near-term growth
three concentrator strategy at Escondida
recovery
optimisation at Spence
Southern Mine Area at Olympic Dam
Growth capital
Escondida can maintain production for a decade with minimal capital following completion of EWS
SGO now in feasibility with capital efficiency improving through each toll-gating phase
Maintenance & minor and improvement1 capital expenditure
US$ billion
1.5
down 42%
1.0
0.5
0.0
FY12
FY13
FY14
FY15
FY16e
FY17e
Maintenance
Minor and improvement
LCE
Improving the capital efficiency of SGO
Index, start early development=100
Layout
Levering market
100
optimisation
Technology
conditions and further
initiatives
productivity gains
75
50
25
0
Start early development
End early development
End of pre-feasibility
Target
1. Operated copper assets (Escondida, Pampa Norte, Olympic Dam); minor and improvement
includes Olympic Dam Major Smelter Works and infrastructure associated with the development of the Southern Mine Area at Olympic Dam; minor and improvement excludes underground mine development and open-cut deferred stripping.
BHP Billiton Investor Briefing, Copper Finance
December 2015
10
bhpbilliton
Contributing to our communities
Our Copper Business is a substantial tax contributor
we are the largest private tax payer in
Chile with US$1.1 billion paid in CY14
Olympic Dam pays royalties of ~US$60 million1 per annum to the State of South Australia
Where possible we source products and services locally from our host communities
US$5.3
billion paid to suppliers in Chile during CY14 with 91% of all suppliers locally based
US$1.4 billion paid to suppliers in Australia during FY15 with US$0.4
billion spent within the State of South Australia
BHP Billiton is committed to voluntarily contribute 1% pre-tax profits2 to support local communities
US$33 million invested in social projects within Chile in CY14
Escondida Community Sport
Program
Textil Isluga exhibition, Iquique Regional Museum
1. Average FY13 to
FY15.
2. Average pre-tax profits in the previous three fiscal years.
BHP
Billiton Investor Briefing, Copper Finance
December 2015
11
bhpbilliton
Key themes
Our Copper
Business delivers strong margins through the cycle
average Underlying EBIT margin of 37% over the last three years
Sustainable productivity gains
offsetting grade decline and industry cost pressures
targeting unit costs of US$1.08/lb1 by FY17
>US$1 billion of supply
savings expected by FY172
Improving capital efficiency to sustain current operations and enable future growth
all opportunities that deserve investment are receiving capital
we continue to optimise
maintenance and minor and improvement capital
our major growth options will benefit from attractive longer-term fundamentals
We have a platform for outstanding long-term cash flow generation
1. Unit cash costs presented
net of one-off items, by-product credits, freight and TCRCs for operated copper assets (Escondida, Pampa Norte, Olympic Dam).
2. Relative to FY14.
BHP Billiton Investor Briefing, Copper Finance
December 2015
12
bhpbilliton
bhpbilliton
Appendix: Unit cash cost calculations
Operated Copper unit costs (US$ million)
FY12 FY13 FY14 FY15 FY16e FY17e
Revenue 11,258 12,382 11,658 10,500
Underlying EBITDA 5,125 6,261 5,838 5,106
Cash costs (gross) 6,133 6,121 5,820 5,394
Less: one-off items 206 103 - 188
Less: by-product credits 813 795 658 596
Less: freight 132 159 159 132
Less: treatment and refining charges 218 300 341 474
Cash costs (net) 4,763 4,764 4,662 4,004
Sales (kt)1 1,325 1,531 1,525 1,644
Cash cost per pound (US$) 1.63 1.41 1.39
1.10 1.27 1.08
Escondida grade adjustment2 (0.20) 0.01 (0.07) Base year (0.26) (0.20)
Adjusted cash cost per pound (US$) 1.43 1.42 1.32 1.10 1.01 0.88
Escondida unit costs (US$
million)
FY12 FY13 FY14 FY15 FY16e FY17e
Revenue 6,960 8,596 8,085 7,819
Underlying EBITDA 3,654 5,175 4,754 4,064
Cash costs (gross) 3,306 3,421
3,331 3,755
Less: one-off items 171 103 - 188
Less: by-product credits 252
211 175 177
Less: freight 115 142 139 117
Less: treatment and refining
charges 218 300 341 474
Cash costs (net) 2,549 2,665 2,676 2,799
Sales (kt)1
863 1,130 1,116 1,259
Cash cost per pound (US$) 1.34 1.07 1.09 1.01 1.21 1.08
Escondida grade adjustment2 (0.24) 0.01 (0.08) Base year (0.34) (0.27)
Adjusted cash cost per pound (US$) 1.10 1.08 1.01 1.01 0.87 0.81
1. Sales
volumes adjusted for impact of intercompany sales and purchases.
2. Escondida sales volumes grade adjusted to FY15.
BHP Billiton Investor Briefing, Copper Finance
December 2015
14
bhpbilliton
bhpbilliton
Olympic Dam
Realising our full potential
Daniel Malchuk
President, Copper
Olympic Dam
Disclaimer
Forward-looking statements
This presentation contains forward-looking
statements, including statements regarding: trends in commodity prices and currency exchange rates; demand for commodities; plans, strategies and objectives of management; closure or divestment of certain operations or facilities (including
associated costs); anticipated production or construction commencement dates; capital costs and scheduling; operating costs and shortages of materials and skilled employees; anticipated productive lives of projects, mines and facilities; provisions
and contingent liabilities; tax and regulatory developments.
Forward-looking statements can be identified by the use of terminology such as intend,
aim, project, anticipate, estimate, plan, believe, expect, may, should, will, continue, annualised or
similar words.
These statements discuss future expectations concerning the results of operations or financial condition, or provide other forward-looking
statements.
These forward-looking statements are not guarantees or predictions of future performance, and involve known and unknown risks, uncertainties and other
factors, many of which are beyond our control, and which may cause actual results to differ materially from those expressed in the statements contained in this presentation. Readers are cautioned not to put undue reliance on forward-looking
statements.
For example, future revenues from our operations, projects or mines described in this presentation will be based, in part, upon the market price of the
minerals, metals or petroleum produced, which may vary significantly from current levels. These variations, if materially adverse, may affect the timing or the feasibility of the development of a particular project, the expansion of certain
facilities or mines, or the continuation of existing operations.
Other factors that may affect the actual construction or production commencement dates, costs or
production output and anticipated lives of operations, mines or facilities include our ability to profitably produce and transport the minerals, petroleum and/or metals extracted to applicable markets; the impact of foreign currency exchange rates
on the market prices of the minerals, petroleum or metals we produce; activities of government authorities in some of the countries where we are exploring or developing these projects, facilities or mines, including increases in taxes, changes in
environmental and other regulations and political uncertainty; labour unrest; and other factors identified in the risk factors discussed in BHP Billitons filings with the US Securities and Exchange Commission (the SEC) (including
in Annual Reports on Form 20-F) which are available on the SECs website at www.sec.gov.
Except as required by applicable regulations or by law, the Group
does not undertake any obligation to publicly update or review any forward-looking statements, whether as a result of new information or future events.
Past
performance cannot be relied on as a guide to future performance.
Non-IFRS financial information
BHP Billiton results are reported under International Financial Reporting Standards (IFRS) including Underlying EBIT and Underlying EBITDA which are used to measure segment
performance. This release may also include certain non-IFRS measures including Adjusted effective tax rate, Attributable profit excluding exceptional items, Free cash flow, Gearing Ratio, Net debt, Net operating assets, Underlying attributable
profit, Underlying basic earnings per share, Underlying EBIT margin, Underlying EBITDA margin, Underlying EBITDA interest coverage and Underlying return on capital. These measures are used internally by management to assess the performance of our
business, make decisions on the allocation of our resources and assess operational management. Non-IFRS measures have not been subject to audit or review and should not be considered as an indication of or alternative to an IFRS measure of
profitability, financial performance or liquidity.
Presentation of data
Unless specified otherwise, all data is presented on a continuing operations basis to exclude the contribution from assets that were demerged with South32 and
references to Underlying EBITDA margin and Underlying EBIT margin exclude third party trading activities.
No offer of securities
Nothing in this presentation should be construed as either an offer to sell or a solicitation of an offer to buy or sell BHP Billiton securities in any jurisdiction, or be treated
or relied upon as a recommendation or advice by BHP Billiton.
Reliance on third party information
The views expressed in this presentation contain information that has been derived from publicly available sources that have not been independently verified. No representation or
warranty is made as to the accuracy, completeness or reliability of the information. This presentation should not be relied upon as a recommendation or forecast by BHP Billiton.
BHP Billiton Investor Briefing, Olympic Dam
December 2015
2
bhpbilliton
Statement of Mineral Resources and Mineral Inventory Classifications
Mineral Resources
The information in this presentation that relates to the FY2015 Mineral
Resources (inclusive of Ore Reserves) was first reported by the Company in compliance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, 2012 (The JORC Code 2012 Edition) in
the 2015 BHP Billiton Annual Report of September 2015.
All reports are available to view on http://www.bhpbilliton.com.
Mineral Resources are reported by S. OConnell (MAusIMM) Olympic Dam who is employed by BHP Billiton.
The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and, in the case of
estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form and context
in which the Competent Persons findings are presented have not been materially modified from the original market announcements.
The above-mentioned persons
are full-time employees of BHP Billiton, unless otherwise stated, and have the required qualifications and experience to qualify as Competent Persons for Mineral Resources under the 2012 edition of the JORC Code. The compilers verify that this
presentation is based on and fairly reflects the Mineral Resources information in the supporting documentation and agree with the form and context of the information presented.
Asset
Deposit
Ore Type
Measured Resource (Mt)
Indicated Resource (Mt)
Inferred Resource (Mt)
FY15 ROM production (Mt)
BHP Billiton interest (%)
Copper
Olympic Dam
Sulphide
1,330 @
0.96% Cu,
0.29kg/t U3O8,
0.40g/t Au,
2g/t Ag
4,610 @
0.79% Cu,
0.24kg/t U3O8,
0.32g/t Au,
1g/t Ag
4,120 @
0.71% Cu,
0.25kg/t U3O8,
0.24g/t Au,
1g/t Ag
91
100
1. Represents total material mined instead of processed to account for unplanned mill outage.
BHP Billiton Investor Briefing, Olympic Dam
December 2015
3
bhpbilliton
Key themes
Creating safe
and stable operations with a focus on material risk management
We are releasing latent capacity through low-risk, capital-efficient underground expansions
accessing the Southern Mine Area (SMA) will enable full utilisation of smelter and refinery
~200 ktpa of copper production expected from FY16 to FY18
~220 ktpa of copper
production capacity by FY19
near-term expansions maintain long-term optionality
We are resetting our cost base through higher volumes and greater efficiencies
total
cost reduction of >US$400 million expected to support US$1.00/lb by FY171
Our world-class orebody provides substantial growth optionality for decades
~450 ktpa of copper production capacity from CY25 with first segment unit costs through potential heap leach technology
1. Relative to FY14. Unit cash costs presented net of by-product credits.
BHP Billiton
Investor Briefing, Olympic Dam
December 2015
4
bhpbilliton
Relentless focus on safety
Tragically we lost one of our colleagues in FY15
We have intensified our
efforts to enhance our material risk management systems
improving incident investigation for significant events with serious potential
identifying and assessing all fatality risks with controls implemented and verified
shaping the culture to effectively reinforce safe behaviours
Safety
performance
12 month rolling average TRIF1 per million hours worked
30
20
10
0
FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 YTD
Incidents with potential significant impact2
Index, July 2013=1.0, number of incidents, 3
month rolling average
2.0
1.5
1.0
0.5
0.0
FY14 FY15 FY16 YTD
1. Total Recordable Injury Frequency (TRIF).
2. Incidents with uncontrolled release of energy.
BHP Billiton Investor Briefing, Olympic Dam
December 2015
5
bhpbilliton
Making a positive contribution
Environment
60 square km conservation and research Arid Recovery initiative adjacent to
Olympic Dam
four species of locally extinct mammals have been reintroduced
Evaluating technologies that could lead to step reductions in greenhouse gas emissions
Community
Locally focused community-driven partnerships
education and health initiatives improving quality of life
~US$426 million of
expenditure in FY15 with local suppliers, including ~US$6 million with indigenous businesses
we have an indigenous employment program and 130 aboriginal
employees
Olympic Dam greenhouse gas emissions
CO2 emissions, kt
900
800
700
600
FY12 FY13 FY14 FY15
Education partnership fosters local education
BHP Billiton Investor Briefing, Olympic Dam
December 2015
6
bhpbilliton
A Tier 1 Resource
An
attractive 10 Bt poly-metallic Resource1
fifth largest copper deposit in the world
largest uranium deposit
third largest gold deposit
Sublevel open stoping underground mine allows selective access to specific grades
Underground
operations
UG Mining
UG broken stock
Hoisting x 2
UG transportation
Surface stockpile
Surface operations
Milling
Flotation
Tails Leach
Tailings storage facility
SX
Uranium
EW
DBF Smelter
ER
Copper
Gold Silver
1. A breakdown by Resource classification is provided on slide 3.
BHP Billiton Investor Briefing, Olympic Dam
December 2015
7
bhpbilliton
Unlocking Resource potential starts with operational stability
Surface operations geared to production capacity of ~220 ktpa of copper
milling
processes are stable with a focus on improving uptime
concentrate blending and burner modifications have improved smelting capability
operational stability will further benefit from expected higher feed rates and higher Cu:S ratio1
We have significantly improved the productivity of our underground equipment
improved
Reserving parameters supports mine plan optimisation
Mill utilisation now above pre-outage levels
Utilisation, %
100
50
0
H1
FY14
H2 FY14
H1 FY15
H2 FY15
YTD Oct 15
Oct 15
Svedala mill utilisation
Fuller mill utilisation
along with smelter performance
Concentrate smelted, index, H1 FY14=100
150
100
50
H1 FY14
H2 FY14
H1 FY15
H2 FY15
Oct 15 YTD
Oct 15
1. Improvements in copper to sulphur ratio (Cu:S) increase efficiency of the smelting process.
BHP Billiton Investor Briefing, Olympic Dam
December 2015
8
bhpbilliton
Continued improvements in productivity
~40% more units of copper per employee in FY16 YTD with further improvements planned1
targeting ~50% by FY171
Manufacturing process rigour will underpin improved operational performance
targeting ~57% improvement in truck productivity by FY171
targeting ~20%
improvement in production drilling by FY171
Producing more units of copper per employee
Index, FY14=100
180
140
100
60
FY14
FY15
FY16e
FY17e
Sustainable improvements in operational performance
Equipment productivity2, index, FY14=100
180
140
100
60
FY14 FY15 FY16e FY17e
Jumbo productivity
Truck productivity
1. Relative to FY14.
2. Metres advanced per jumbo; tonnes moved per kilometre per hour by
truck.
BHP Billiton Investor Briefing, Olympic Dam
December 2015
9
bhpbilliton
A staged approach delivering more value
Delivering value from our installed infrastructure1
Near-term copper production guidance and
aspirational capacity, ktpa
Debottleneck underground mine
Fully utilise
smelter and refinery
1
2
Optimisation
Restoring stability and improving efficiency and productivity
Accelerating material moved with underground infrastructure
Accessing the SMA to increase
contained metal supply
Resetting our cost base
Potential debottlenecking
3
Further optimisation
Potential to increase capacity through minor debottlenecking investment
Potential to double
capacity
4
Longer-term options2
Underground expansion
Staged or up-front investment
Heap leaching technology
Preserving optionality for open pit
~1801
~200+
~220
~235 - 255
~450
FY12-FY15 FY16e FY19e FY21e FY25e+
Very low capital
Potential capacity by FY25
Optimised capital with high IRR
1. Represents actual production for FY12-FY15 (adjusted for
FY15 mill outage), extrapolated for FY16 and beyond (production guidance and aspirational capacity).
2. Subject to approval.
BHP Billiton Investor Briefing, Olympic Dam
December 2015
10
bhpbilliton
Rapidly expanding our mine footprint
We are accessing the high-grade Southern Mine Area (SMA) which contains ~70% of the total Resource
expected increase in ore supply will move bottleneck to the smelter and refinery plants by FY18
We expect to achieve successive records in material movement in FY16, FY17 and FY18
~26% increase in mine development expected in FY161
fully utilising our two ore hoisting systems with a combined nominal capacity of 10.5 Mtpa
Accessing the SMA
Mined stopes last 27 years
NMA2 ~30% of Resource
Planned stopes next five years
Future stopes
SMA ~70% of Resource
Increasing mine development
Mtpa
13
12
11
10
9
8
km
40
35
30
25
20
15
FY12 FY13 FY14 FY15 FY16e FY17e
Material movement3
SMA
Development
1. Relative to FY14.
2. Northern Mine Area (NMA).
3. Underground material movement including NMA and waste material.
BHP Billiton Investor
Briefing, Olympic Dam
December 2015
11
bhpbilliton
Delivering more metal production capacity
Accessing the SMA and shifting the bottleneck to the plant supports higher forecast metal production
~200 ktpa copper production from FY16
~220 ktpa copper production capacity by
FY19
~20% lift in copper grade to >2.2% from FY211
~18%
improvement in Cu:S ratio from FY211
Our current surface infrastructure can sustain strong production at these rates for decades
Significant improvements in copper production
Production, ktpa
200
175
150
125
100
Copper grade, %
2.4
2.3
2.1
2.0
1.8
FY12 FY13 FY14 FY15 FY16e FY17e
Production
Copper grade
1. Relative to FY14.
BHP Billiton Investor Briefing, Olympic Dam
December 2015
12
bhpbilliton
Transitioning a Tier 1 Resource into a Tier 1 operation
Higher metal volumes will dilute our fixed cost base
Expect to reduce unit cash costs by ~34%
in FY161
targeting a position near the first segment of the cost curve in the short term
Transforming our cost base with an expected total reduction of >US$400 million by FY171
targeting unit cash costs of US$1.00/lb2
>US$120 million
cost saving through 36% workforce reduction
>US$30 million cost saving through insourcing of mine development activities
Transformational reduction of our unit costs2
US$/lb, net of by-product credits
3.0
2.5
2.0
1.5
1.0
FY12 FY13 FY14 FY15 FY16e FY17e
Further improving our cost competitiveness
CY15, C1 cash costs, US$/lb
Short term
Olympic Dam today
1. Relative to FY15.
2. Unit cash costs presented net of by-product credits. Based on exchange
rates of AUD/USD 0.73 in FY16e and 0.72 in FY17e.
BHP Billiton Investor Briefing, Olympic Dam
December 2015
13
bhpbilliton
Substantial long-term growth optionality
Underground expansion expected to double ore hoisting capacity through an additional shaft
potential to deliver ~450 ktpa1 of copper production capacity from CY25
considering staged investment approach to optimise capital efficiency
progress to pre-feasibility in CY17, subject to internal approval
first segment C1 cost position post by-product credits
preserving optionality for open pit scenarios
Encouraging test results from ongoing large-scale integrated heap leach pilot plant
conclusive results expected in FY19
Encouraging test results from heap leach pilot
plant
Achieving first segment cost position in the long term
CY15, C1 cash
costs, US$/lb
Long term
Short term
Olympic Dam today
1. ~750 ktpa on a copper equivalent basis (including gold, silver and
uranium by products).
BHP Billiton Investor Briefing, Olympic Dam
December
2015
14
bhpbilliton
Key themes
Creating safe
and stable operations with a focus on material risk management
We are releasing latent capacity through low-risk, capital-efficient underground expansions
accessing the Southern Mine Area (SMA) will enable full utilisation of smelter and refinery
~200 ktpa of copper production expected from FY16 to FY18
~220 ktpa of copper
production capacity by FY19
near-term expansions maintain long-term optionality
We are resetting our cost base through higher volumes and greater efficiencies
total
cost reduction of >US$400 million expected to support US$1.00/lb by FY171
Our world-class orebody provides substantial growth optionality for decades
~450 ktpa of copper production capacity from CY25 with first segment unit costs through potential heap leach technology
1. Relative to FY14. Unit cash costs presented net of by-product credits.
BHP Billiton
Investor Briefing, Olympic Dam
December 2015
15
bhpbilliton
bhpbilliton
bhpbilliton
Antamina
A safe and highly productive Tier 1 asset
Andrew Arthur
Vice President Strategy and Development, Copper
Antamina
Disclaimer
Forward-looking statements
This presentation contains forward-looking
statements, including statements regarding: trends in commodity prices and currency exchange rates; demand for commodities; plans, strategies and objectives of management; closure or divestment of certain operations or facilities (including
associated costs); anticipated production or construction commencement dates; capital costs and scheduling; operating costs and shortages of materials and skilled employees; anticipated productive lives of projects, mines and facilities; provisions
and contingent liabilities; tax and regulatory developments.
Forward-looking statements can be identified by the use of terminology such as intend,
aim, project, anticipate, estimate, plan, believe, expect, may, should, will, continue, annualised or
similar words.
These statements discuss future expectations concerning the results of operations or financial condition, or provide other forward-looking
statements.
These forward-looking statements are not guarantees or predictions of future performance, and involve known and unknown risks, uncertainties and other
factors, many of which are beyond our control, and which may cause actual results to differ materially from those expressed in the statements contained in this presentation. Readers are cautioned not to put undue reliance on forward-looking
statements.
For example, future revenues from our operations, projects or mines described in this presentation will be based, in part, upon the market price of the
minerals, metals or petroleum produced, which may vary significantly from current levels. These variations, if materially adverse, may affect the timing or the feasibility of the development of a particular project, the expansion of certain
facilities or mines, or the continuation of existing operations.
Other factors that may affect the actual construction or production commencement dates, costs or
production output and anticipated lives of operations, mines or facilities include our ability to profitably produce and transport the minerals, petroleum and/or metals extracted to applicable markets; the impact of foreign currency exchange rates
on the market prices of the minerals, petroleum or metals we produce; activities of government authorities in some of the countries where we are exploring or developing these projects, facilities or mines, including increases in taxes, changes in
environmental and other regulations and political uncertainty; labour unrest; and other factors identified in the risk factors discussed in BHP Billitons filings with the US Securities and Exchange Commission (the SEC) (including
in Annual Reports on Form 20-F) which are available on the SECs website at www.sec.gov.
Except as required by applicable regulations or by law, the Group
does not undertake any obligation to publicly update or review any forward-looking statements, whether as a result of new information or future events.
Past
performance cannot be relied on as a guide to future performance.
Non-IFRS financial information
BHP Billiton results are reported under International Financial Reporting Standards (IFRS) including Underlying EBIT and Underlying EBITDA which are used to measure segment
performance. This release may also include certain non-IFRS measures including Adjusted effective tax rate, Attributable profit excluding exceptional items, Free cash flow, Gearing Ratio, Net debt, Net operating assets, Underlying attributable
profit, Underlying basic earnings per share, Underlying EBIT margin, Underlying EBITDA margin, Underlying EBITDA interest coverage and Underlying return on capital. These measures are used internally by management to assess the performance of our
business, make decisions on the allocation of our resources and assess operational management. Non-IFRS measures have not been subject to audit or review and should not be considered as an indication of or alternative to an IFRS measure of
profitability, financial performance or liquidity.
Presentation of data
Unless specified otherwise, all data is presented on a continuing operations basis to exclude the contribution from assets that were demerged with South32 and
references to Underlying EBITDA margin and Underlying EBIT margin exclude third party trading activities.
No offer of securities
Nothing in this presentation should be construed as either an offer to sell or a solicitation of an offer to buy or sell BHP Billiton securities in any jurisdiction, or be treated
or relied upon as a recommendation or advice by BHP Billiton.
Reliance on third party information
The views expressed in this presentation contain information that has been derived from publicly available sources that have not been independently verified. No representation or
warranty is made as to the accuracy, completeness or reliability of the information. This presentation should not be relied upon as a recommendation or forecast by BHP Billiton.
BHP Billiton Investor Briefing, Antamina
December 20152
bhpbilliton
Statement of Mineral Resources and Mineral Inventory Classifications
Mineral Resources
The information in this presentation that relates to the FY2015 Mineral
Resources (inclusive of Ore Reserves) was first reported by the Company in compliance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, 2012 (The JORC Code 2012 Edition) in
the 2015 BHP Billiton Annual Report of September 2015.
All reports are available to view on http://www.bhpbilliton.com.
Mineral Resources are reported by L. Canchis (MAusIMM, employed by Minera Antamina SA) for Antamina.
The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and, in the case of
estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form and context
in which the Competent Persons findings are presented have not been materially modified from the original market announcements.
The above-mentioned persons
are full-time employees of BHP Billiton, unless otherwise stated, and have the required qualifications and experience to qualify as Competent Persons for Mineral Resources under the 2012 edition of the JORC Code. The compilers verify that this
presentation is based on and fairly reflects the Mineral Resources information in the supporting documentation and agree with the form and context of the information presented.
Measured Resource Indicated Resource Inferred Resource FY15 ROM BHP Billiton
Asset Deposit Ore
Type production interest
(Mt) (Mt) (Mt) (Mt) (%)
Copper
247@ 848@ 1,280@
0.91% Cu, 0.89% Cu, 0.88% Cu,
Antamina Sulphide 11g/t Ag, 10g/t Ag, 11g/t Ag, 58 33.75
0.7% Zn, 0.9% Zn, 0.7% Zn,
280 ppm Mo 200 ppm Mo 170 ppm Mo
BHP Billiton Investor Briefing, Antamina
December 20153
bhpbilliton
Key themes
Outstanding
safety performance supported by continuous improvement in material risk management
Strong relationships with government and community
Asset quality and leading cost curve position supports strong margins
copper unit cash cost of
US$0.56/lb1 expected in FY16
FY16 production guidance of ~402 kt of copper and 106 kt of copper equivalent by-products2
World-class orebody with medium and long-term development options
high-grade 2.4 Bt resource
expected to support >40 years of mining operations
1. C1 cost. Including zinc, silver, molybdenum and lead by-product credits.
2. 100% basis. Copper equivalent calculation using LME and Perth Mint prices as of 21 September 2015.
BHP Billiton Investor Briefing, Antamina
December 20154
bhpbilliton
A world-class orebody
Antamina is among the worlds largest copper deposits
Polymetallic skarn
orebody (copper, zinc, molybdenum, silver and lead)
Resources of ~2.4 Bt1
0.89% copper and 0.75% zinc2
Independently operated by
Compañía Minera Antamina
Joint venture partners
BHP
Billiton 33.75%
Glencore 33.75%
Teck Resources 22.50%
Mitsubishi Corporation 10.00%
Antamina Pit 4,500 meters above
sea level
Growing resource base2
Bt
2.5
2.0
1.5
1.0
FY10 FY11 FY12 FY13 FY14 FY15
1. Mineral resource inclusive of reserves.
2. June 2015 BHP Billiton resource and reserve declaration.
BHP Billiton Investor Briefing,
Antamina
December 20155
bhpbilliton
Our safety and risk management focus
TRIF1 consistently <2.0 over the last five years
CY15 YTD at ~2.2 with two lost time
injuries2
Continued enhancement of mature risk management processes
independent verification of Antaminas risk management process
adoption
of best practices in material risk management with support from BHP Billiton
implementation of performance standards and field verifications of critical controls
focus on high potential incidents and quality of investigations
critical risk
training for all employees and contractors
extending safety culture to the families of employees
Safety performance
TRIF1 per million hours worked
8
4
0
CY05 CY06 CY07 CY08 CY09 CY10 CY11 CY12 CY13 CY14 YTD CY15
Embedding safety
through family visits
1. Total Recordable Injury Frequency (TRIF).
2.
Occurrences that resulted in loss of productive work as of 31 October 2015.
BHP Billiton Investor Briefing, Antamina
December 20156
bhpbilliton
Environmental and social responsibility
Environment
Antamina recognised for Environmental Protection Efforts1
Industry-leading water practices
recycling 99.3% of process water, targeting 100% by
CY17
Community
Recognised as one of the most respected companies in Peru2
Committed to sustainable development of local communities
proactive
and consultative engagement with local communities
Antamina is important to the development of Peru
US$420 million contributed to local communities from CY06 to CY14
contributed 6%
of national income tax revenues3
Providing water and sewage services to local communities
Antamina tax contribution
Peruvian mining tax3, % Peruvian corporate income tax3, %
94
58 Others
Others 42
Antamina
6
Antamina
1. Recognised by Perus National Society of Mining, Petroleum and Energy.
2. PricewaterhouseCoopers Las Empresas Mas Admiradas del Peru 2014.
3. Total
Mining Corporate Income Tax (3rd category) and Corporate Income Tax (3rd category) paid in 2013, including regularisations collected by the National Customs and Tax Administration Authority (SUNAT).
BHP Billiton Investor Briefing, Antamina
December 2015
bhpbilliton
7
A world class operation
Commenced mining in 2001 with resources expected to support >40 years of mining operations
Copper and zinc concentrate produced in one concentrator plant
molybdenum and lead
concentrates and silver credits add incremental value
Current equipment capacity optimised to realise average mill feed of ~145 ktpd
Wholly-owned pipeline and port infrastructure guarantees access and minimises risks
Antamina
operations
Open pit operation
Primary crushing
Coarse ore stockpile x 3
Ball mills x 4
SAG mills x 2
Cu (Bulk) flotation
Cells tank 4 rows x 8
Zn flotation
Cells tank 4 rows x 8
Mo/Bi separation
Concentrate thickening and storage
Tails to impoundment
Mine site
Mo and Bi concentrate
Port site
Concentrate pipeline
Thickening
Dewatering
To irrigation
Water treatment
Concentrate storage
Ship loading
BHP Billiton Investor Briefing, Antamina
December 2015
8
bhpbilliton
Benchmark plant and equipment productivity
Antamina has increased crusher throughput from 130 ktpd to 145 ktpd for minimal capital
potential to realise >165 ktpd based on recent performance
record throughput expected in CY15
Availability and utilisation metrics for mine fleet at internal benchmark levels in Copper
OEE1 for Komatsu 930 haul truck fleet of 71%
OEE1 for P&H
4100 shovel fleet of 74%
expect to achieve record material moved in CY15
Moving more material at lower costs
Mtpa, 100% basis US$/t
300 4.0
250 3.5
200 3.0
150 2.5
100 2.0
CY10 CY11 CY12 CY13 CY14 CY15e
Tonnes moved Total cost per tonne moved
1. Overall equipment effectiveness (OEE).
BHP Billiton Investor Briefing, Antamina
December 2015
9
bhpbilliton
Transition to higher grades further supports production
Production guidance1 for FY16 of ~402 kt of copper and 106 kt of by-products
copper grade
expected to increase from 0.77% in FY15 to 0.92% in FY16
copper grades will average 0.94% over the next five years
zinc grades will average 0.97% over the next five years, increasing from 0.59% in FY16
Near-term production upside
Copper equivalent production kt, 100% basis
grade, %
600 1.2
400 0.8
200 0.4
0 0.0
FY12 FY13 FY14 FY15 FY16e
Copper By-products
Copper grade Zinc grade
1. 100% basis. Copper equivalent calculation using LME and Perth Mint
prices as of 21 September 2015.
BHP Billiton Investor Briefing, Antamina
December 2015
10
bhpbilliton
Strongly positioned on the cost curve
Antamina is well positioned at the bottom of the cost curve
significant by-product credits
from zinc and silver
C1 cost of US$0.56/lb expected in FY161
strong earnings
and margin generation, although historic margins under pressure
Cost-saving initiatives have removed ~US$385 million since CY14
renegotiation of contracts with suppliers and strategic partners
organisational restructure
and headcount reduction
capital savings or deferral
Attractive position on
the industry cost curve
CY15, C1 cash costs, US$/lb
Antamina
Strong earnings and margin
US$ billion, 100% basis %
3.0 100
1.5 50
0.0 0
FY13 FY14 FY15
Underlying EBITDA Underlying EBITDA margin
Source: C1 cost curve based on Wood Mackenzie data
for peers and BHP Billiton data for Antamina.
1. Including zinc, silver, molybdenum and lead by-product credits.
BHP Billiton Investor Briefing, Antamina
December 2015
11
bhpbilliton
Significant Resource potential
High-grade 2.4 Bt Resource1
0.89% copper, 0.75% zinc, 11 g/t silver and 0.019%
molybdenum
>40 years of mining operations expected
Working to
unlock medium and long-term development opportunities considering simultaneous open pit life extension and underground operations
developing alternatives to
address increasing haul distances and higher strip ratios
apparent continuity of mineralisation 1.5 km below current pit topography
Significant upside underneath current pit
B
A
A
B
A
Caving potential Sublevel open stoping potential
B Open at depth
500m
Sublevel open stoping potential Caving potential 220m
1. June 2015 BHP Billiton Resource and
Reserve declaration.
BHP Billiton Investor Briefing, Antamina
December 201512
bhpbilliton
Key themes
Outstanding
safety performance supported by continuous improvement in material risk management
Strong relationships with government and community
Asset quality and leading cost curve position supports strong margins
copper unit cash cost of
US$0.56/lb1 expected in FY16
FY16 production guidance of ~402 kt of copper and 106 kt of copper equivalent by-products2
World-class orebody with medium and long-term development options
high-grade 2.4 Bt resource
expected to support >40 years of mining operations
1. C1 cost. Including zinc, silver, molybdenum and lead by-product credits.
2. 100% basis. Copper equivalent calculation using LME and Perth Mint prices as of 21 September 2015.
BHP Billiton Investor Briefing, Antamina
December 2015
13
bhpbilliton
bhpbilliton
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
BHP Billiton Limited and BHP Billiton Plc | ||||||
Date: December 1, 2015 | By: | /s/ Rachel Agnew | ||||
Name: | Rachel Agnew | |||||
Title: | Company Secretary |