e6vk
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, D.C. 20549
FORM 6-K
Report of Foreign Private Issuer
Pursuant to Rule 13a-16 or 15d-16 of
the Securities Exchange Act of 1934
For the quarterly period ended March 31, 2011
Commission file number 1-12874
TEEKAY CORPORATION
(Exact name of Registrant as specified in its charter)
4th Floor, Belvedere Building
69 Pitts Bay Road
Hamilton, HM 08 Bermuda
(Address of principal executive office)
Indicate by check mark whether the registrant files or will file annual reports under cover Form
20-F or Form 40-F.
Form 20-F þ Form 40- F o
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by
Regulation S-T Rule 101(b)(1).
Yes o No þ
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by
Regulation S-T Rule 101(b)(7).
Yes o No þ
TEEKAY CORPORATION AND SUBSIDIARIES
REPORT ON FORM 6-K FOR THE QUARTERLY PERIOD ENDED MARCH 31, 2011
INDEX
|
|
|
|
|
|
|
PAGE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3 |
|
|
|
|
|
|
|
|
|
4 |
|
|
|
|
|
|
|
|
|
5 |
|
|
|
|
|
|
|
|
|
6 |
|
|
|
|
|
|
|
|
|
7 |
|
|
|
|
|
|
|
|
|
8 |
|
|
|
|
|
|
|
|
|
19 |
|
|
|
|
|
|
|
|
|
33 |
|
|
|
|
|
|
|
|
|
35 |
|
|
|
|
|
|
|
|
|
36 |
|
|
|
|
|
|
Page 2 of 36
|
|
|
ITEM 1 - |
|
FINANCIAL STATEMENTS |
TEEKAY CORPORATION AND SUBSIDIARIES
UNAUDITED
CONSOLIDATED STATEMENTS OF INCOME (LOSS)
(in thousands of U. S. dollars, except share and per share amounts)
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended March 31, |
|
|
|
2011 |
|
|
2010 |
|
|
|
$ |
|
|
$ |
|
|
|
|
|
|
|
|
|
|
REVENUES |
|
|
488,024 |
|
|
|
572,875 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
OPERATING EXPENSES |
|
|
|
|
|
|
|
|
Voyage expenses |
|
|
45,126 |
|
|
|
72,550 |
|
Vessel operating expenses (note 15) |
|
|
161,577 |
|
|
|
154,535 |
|
Time-charter hire expense |
|
|
63,031 |
|
|
|
79,251 |
|
Depreciation and amortization |
|
|
105,038 |
|
|
|
108,230 |
|
General and administrative (notes 9 and 15) |
|
|
70,218 |
|
|
|
48,091 |
|
Loss on sale of vessels and equipment net of write-downs of vessels and equipment (note 7) |
|
|
3,593 |
|
|
|
760 |
|
Restructuring charges (note 12) |
|
|
4,961 |
|
|
|
3,783 |
|
|
|
|
|
|
|
|
Total operating expenses |
|
|
453,544 |
|
|
|
467,200 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Income from vessel operations |
|
|
34,480 |
|
|
|
105,675 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
OTHER ITEMS |
|
|
|
|
|
|
|
|
Interest expense |
|
|
(32,794 |
) |
|
|
(32,152 |
) |
Interest income |
|
|
2,465 |
|
|
|
4,274 |
|
Realized and unrealized gain (loss) on non-designated derivative instruments (note 15) |
|
|
23,257 |
|
|
|
(87,847 |
) |
Equity income (loss) from joint ventures |
|
|
6,394 |
|
|
|
(2,666 |
) |
Foreign exchange (loss) gain (notes 8 and 15) |
|
|
(20,340 |
) |
|
|
29,026 |
|
Loss on notes repurchase (note 8) |
|
|
|
|
|
|
(12,108 |
) |
Other income (note 13) |
|
|
94 |
|
|
|
2,422 |
|
|
|
|
|
|
|
|
Net income before income taxes |
|
|
13,556 |
|
|
|
6,624 |
|
Income tax (expense) recovery (note 16) |
|
|
(811 |
) |
|
|
7,307 |
|
|
|
|
|
|
|
|
Net income |
|
|
12,745 |
|
|
|
13,931 |
|
Less: Net income attributable to non-controlling interests |
|
|
(42,402 |
) |
|
|
(27,933 |
) |
|
|
|
|
|
|
|
Net loss attributable to stockholders of Teekay Corporation |
|
|
(29,657 |
) |
|
|
(14,002 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Per common share of Teekay Corporation (note 17) |
|
|
|
|
|
|
|
|
Basic loss attributable to stockholders of Teekay Corporation |
|
|
(0.41 |
) |
|
|
(0.19 |
) |
Diluted loss attributable to stockholders of Teekay Corporation |
|
|
(0.41 |
) |
|
|
(0.19 |
) |
Cash dividends declared |
|
|
0.3163 |
|
|
|
0.3163 |
|
Weighted average number of common shares outstanding (note 17) |
|
|
|
|
|
|
|
|
Basic |
|
|
71,946,997 |
|
|
|
72,788,591 |
|
Diluted |
|
|
71,946,997 |
|
|
|
72,788,591 |
|
The accompanying notes are an integral part of the unaudited consolidated financial
statements.
Page 3 of 36
TEEKAY CORPORATION AND SUBSIDIARIES
UNAUDITED
CONSOLIDATED BALANCE SHEETS
(in thousands of U.S. dollars, except share and per share amounts)
|
|
|
|
|
|
|
|
|
|
|
As at |
|
|
As at |
|
|
|
March 31, |
|
|
December 31, |
|
|
|
2011 |
|
|
2010 |
|
|
|
$ |
|
|
$ |
|
ASSETS |
|
|
|
|
|
|
|
|
Current |
|
|
|
|
|
|
|
|
Cash and cash equivalents (note 8) |
|
|
567,325 |
|
|
|
779,748 |
|
Restricted cash |
|
|
92,733 |
|
|
|
86,559 |
|
Accounts receivable, including non-trade of $30,972 (2010 $35,960) |
|
|
283,303 |
|
|
|
244,879 |
|
Net investment in direct financing leases (note 5) |
|
|
26,126 |
|
|
|
26,791 |
|
Prepaid expenses |
|
|
128,563 |
|
|
|
94,282 |
|
Current portion of derivative assets (note 15) |
|
|
41,293 |
|
|
|
27,215 |
|
Other assets |
|
|
2,538 |
|
|
|
2,616 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total current assets |
|
|
1,141,881 |
|
|
|
1,262,090 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Restricted cash non-current |
|
|
493,633 |
|
|
|
489,712 |
|
|
|
|
|
|
|
|
|
|
Vessels and equipment (note 8) |
|
|
|
|
|
|
|
|
At cost, less accumulated depreciation of $2,070,325 (2010 $1,997,411) |
|
|
5,618,789 |
|
|
|
5,692,812 |
|
Vessels under capital leases, at cost, less accumulated amortization of $177,866 (2010 $172,113) |
|
|
872,396 |
|
|
|
880,576 |
|
Advances on newbuilding contracts (note 10a) |
|
|
261,335 |
|
|
|
197,987 |
|
|
|
|
|
|
|
|
Total vessels and equipment |
|
|
6,752,520 |
|
|
|
6,771,375 |
|
|
|
|
|
|
|
|
Net investment in direct financing leases non-current (note 5) |
|
|
454,122 |
|
|
|
460,725 |
|
Marketable securities |
|
|
22,849 |
|
|
|
21,380 |
|
Loans to joint ventures and joint venture partners, bearing interest between 4.4% to 8.0% |
|
|
33,500 |
|
|
|
32,750 |
|
Derivative assets (note 15) |
|
|
46,301 |
|
|
|
55,983 |
|
Deferred income tax asset (note 16) |
|
|
17,268 |
|
|
|
17,001 |
|
Investment in joint ventures (note 10b) |
|
|
220,563 |
|
|
|
207,633 |
|
Investment in term loans (note 4) |
|
|
186,184 |
|
|
|
116,014 |
|
Other non-current assets |
|
|
109,142 |
|
|
|
117,351 |
|
Intangible assets net |
|
|
151,306 |
|
|
|
155,893 |
|
Goodwill |
|
|
203,191 |
|
|
|
203,191 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total assets |
|
|
9,832,460 |
|
|
|
9,911,098 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIABILITIES AND EQUITY |
|
|
|
|
|
|
|
|
Current |
|
|
|
|
|
|
|
|
Accounts payable |
|
|
52,709 |
|
|
|
44,990 |
|
Accrued liabilities |
|
|
369,142 |
|
|
|
377,119 |
|
Current portion of derivative liabilities (note 15) |
|
|
130,913 |
|
|
|
144,111 |
|
Current portion of long-term debt (note 8) |
|
|
472,074 |
|
|
|
276,508 |
|
Current obligation under capital leases |
|
|
270,945 |
|
|
|
267,382 |
|
Current portion of in-process revenue contracts |
|
|
42,926 |
|
|
|
43,469 |
|
Loans from joint venture partners |
|
|
14,500 |
|
|
|
59 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total current liabilities |
|
|
1,353,209 |
|
|
|
1,153,638 |
|
|
|
|
|
|
|
|
Long-term debt, including amounts due to joint venture partners of $13,383 (2010 $13,282) (note 8) |
|
|
3,979,815 |
|
|
|
4,155,556 |
|
Long-term obligation under capital leases |
|
|
470,910 |
|
|
|
470,752 |
|
Derivative liabilities (note 15) |
|
|
245,504 |
|
|
|
387,124 |
|
Asset retirement obligation |
|
|
24,092 |
|
|
|
23,018 |
|
In-process revenue contracts |
|
|
142,313 |
|
|
|
152,637 |
|
Other long-term liabilities |
|
|
192,343 |
|
|
|
194,640 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total liabilities |
|
|
6,408,186 |
|
|
|
6,537,365 |
|
|
|
|
|
|
|
|
Commitments and contingencies (notes 5, 10 and 15) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Redeemable non-controlling interest (note 10d) |
|
|
40,614 |
|
|
|
41,725 |
|
|
|
|
|
|
|
|
|
|
Equity |
|
|
|
|
|
|
|
|
Common stock and additional paid-in capital ($0.001 par value; 725,000,000 shares authorized;
71,822,916 shares outstanding (2010 72,012,843); 74,142,366 shares issued
(2010 73,749,793)) (note 9) |
|
|
685,430 |
|
|
|
672,684 |
|
Retained earnings |
|
|
1,157,117 |
|
|
|
1,313,934 |
|
Non-controlling interest |
|
|
1,544,239 |
|
|
|
1,353,561 |
|
Accumulated other comprehensive loss (note 14) |
|
|
(3,126 |
) |
|
|
(8,171 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total equity |
|
|
3,383,660 |
|
|
|
3,332,008 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total liabilities and equity |
|
|
9,832,460 |
|
|
|
9,911,098 |
|
|
|
|
|
|
|
|
The accompanying notes are an integral part of the unaudited consolidated financial
statements.
Page 4 of 36
TEEKAY CORPORATION AND SUBSIDIARIES
UNAUDITED
CONSOLIDATED STATEMENTS OF CASH FLOWS
(in thousands of U.S. dollars)
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended March 31, |
|
|
|
2011 |
|
|
2010 |
|
|
|
$ |
|
|
$ |
|
Cash and cash equivalents provided by (used for) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
OPERATING ACTIVITIES |
|
|
|
|
|
|
|
|
Net income |
|
|
12,745 |
|
|
|
13,931 |
|
Non-cash items: |
|
|
|
|
|
|
|
|
Depreciation and amortization |
|
|
105,038 |
|
|
|
108,230 |
|
Amortization of in-process revenue contracts |
|
|
(10,867 |
) |
|
|
(13,435 |
) |
Loss on sale of vessels and equipment |
|
|
193 |
|
|
|
239 |
|
Write-down of vessels and equipment |
|
|
3,400 |
|
|
|
521 |
|
Loss on repurchase of notes |
|
|
|
|
|
|
12,108 |
|
Equity (income) loss |
|
|
(6,394 |
) |
|
|
2,666 |
|
Income tax expense (recovery) |
|
|
811 |
|
|
|
(7,307 |
) |
Share-based compensation |
|
|
13,891 |
|
|
|
3,923 |
|
Unrealized foreign exchange loss (gain) |
|
|
25,408 |
|
|
|
(22,556 |
) |
Unrealized (gain) loss on derivative instruments |
|
|
(148,468 |
) |
|
|
49,763 |
|
Other |
|
|
(1,813 |
) |
|
|
(1,328 |
) |
Change in operating assets and liabilities |
|
|
(78,764 |
) |
|
|
(48,279 |
) |
Expenditures for drydocking |
|
|
(7,854 |
) |
|
|
(3,695 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net operating cash flow |
|
|
(92,674 |
) |
|
|
94,781 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FINANCING ACTIVITIES |
|
|
|
|
|
|
|
|
Proceeds from issuance of long-term debt (note 8) |
|
|
227,005 |
|
|
|
771,249 |
|
Debt issuance costs |
|
|
(1,320 |
) |
|
|
(9,565 |
) |
Scheduled repayments of long-term debt |
|
|
(68,662 |
) |
|
|
(38,413 |
) |
Prepayments of long-term debt |
|
|
(165,407 |
) |
|
|
(609,928 |
) |
Repayments of capital lease obligations |
|
|
(1,172 |
) |
|
|
(727 |
) |
Proceeds from loans from joint venture partner |
|
|
14,500 |
|
|
|
591 |
|
Repayment of loans from joint venture partner |
|
|
(59 |
) |
|
|
(1,164 |
) |
Increase in restricted cash |
|
|
(4,602 |
) |
|
|
(428 |
) |
Net proceeds from issuance of Teekay Offshore Partners L.P. units (note 6) |
|
|
|
|
|
|
94,114 |
|
Net proceeds from issuance of Teekay Tankers Ltd. shares (note 6) |
|
|
107,233 |
|
|
|
|
|
Issuance of Common Stock upon exercise of stock options |
|
|
3,862 |
|
|
|
1,974 |
|
Repurchase of Common Stock (note 9) |
|
|
(19,888 |
) |
|
|
|
|
Distribution from subsidiaries to non-controlling interests |
|
|
(48,110 |
) |
|
|
(33,083 |
) |
Cash dividends paid |
|
|
(23,172 |
) |
|
|
(22,999 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net financing cash flow |
|
|
20,208 |
|
|
|
151,621 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
INVESTING ACTIVITIES |
|
|
|
|
|
|
|
|
Expenditures for vessels and equipment |
|
|
(76,112 |
) |
|
|
(44,696 |
) |
Proceeds from sale of vessels and equipment |
|
|
5,055 |
|
|
|
10,045 |
|
Investment in term loan (note 4) |
|
|
(70,170 |
) |
|
|
|
|
Investment in joint ventures |
|
|
(4,191 |
) |
|
|
(145 |
) |
Advances to joint ventures and joint venture partners |
|
|
(1,830 |
) |
|
|
651 |
|
Investment in direct financing lease assets |
|
|
|
|
|
|
(4,199 |
) |
Direct financing lease payments received |
|
|
7,268 |
|
|
|
4,827 |
|
Other investing activities |
|
|
23 |
|
|
|
(34 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net investing cash flow |
|
|
(139,957 |
) |
|
|
(33,551 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Decrease) increase in cash and cash equivalents |
|
|
(212,423 |
) |
|
|
212,851 |
|
Cash and cash equivalents, beginning of the period |
|
|
779,748 |
|
|
|
422,510 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cash and cash equivalents, end of the period |
|
|
567,325 |
|
|
|
635,361 |
|
|
|
|
|
|
|
|
|
|
|
Supplemental cash flow information (note 18) |
|
|
|
|
|
|
|
|
The accompanying notes are an integral part of the unaudited consolidated financial statements.
Page 5 of 36
TEEKAY CORPORATION AND SUBSIDIARIES
UNAUDITED
CONSOLIDATED STATEMENT OF CHANGES IN TOTAL EQUITY
(in thousands of U.S. dollars)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL EQUITY |
|
|
|
Thousands |
|
|
Common |
|
|
|
|
|
|
Accumulated |
|
|
|
|
|
|
|
|
|
of Shares |
|
|
Stock and |
|
|
|
|
|
|
Other |
|
|
|
|
|
|
|
|
|
of Common |
|
|
Additional |
|
|
|
|
|
|
Comprehensive |
|
|
Non- |
|
|
|
|
|
|
Stock |
|
|
Paid-in |
|
|
Retained |
|
|
Income |
|
|
controlling |
|
|
|
|
|
|
Outstanding |
|
|
Capital |
|
|
Earnings |
|
|
(Loss) |
|
|
Interest |
|
|
Total |
|
|
|
# |
|
|
$ |
|
|
$ |
|
|
$ |
|
|
$ |
|
|
$ |
|
Balance as at December 31, 2010 |
|
|
72,013 |
|
|
|
672,684 |
|
|
|
1,313,934 |
|
|
|
(8,171 |
) |
|
|
1,353,561 |
|
|
|
3,332,008 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net (loss) income |
|
|
|
|
|
|
|
|
|
|
(29,657 |
) |
|
|
|
|
|
|
41,064 |
|
|
|
11,407 |
|
Other comprehensive income (loss): |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Unrealized gain on marketable securities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1,468 |
|
|
|
|
|
|
|
1,468 |
|
Pension adjustments, net of taxes |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
192 |
|
|
|
|
|
|
|
192 |
|
Unrealized loss on qualifying cash flow hedging
instruments (note 15) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4,042 |
|
|
|
1,456 |
|
|
|
5,498 |
|
Realized loss on qualifying cash flow hedging
instruments (note 15) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(657 |
) |
|
|
(328 |
) |
|
|
(985 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Comprehensive income |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
42,192 |
|
|
|
17,580 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Dividends declared |
|
|
|
|
|
|
|
|
|
|
(23,175 |
) |
|
|
|
|
|
|
(48,110 |
) |
|
|
(71,285 |
) |
Reinvested dividends |
|
|
1 |
|
|
|
3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3 |
|
Exercise of stock options |
|
|
393 |
|
|
|
3,862 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3,862 |
|
Repurchase of Common Stock (note 9) |
|
|
(583 |
) |
|
|
(5,010 |
) |
|
|
(14,878 |
) |
|
|
|
|
|
|
|
|
|
|
(19,888 |
) |
Employee stock option compensation (note 9) |
|
|
|
|
|
|
13,891 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
13,891 |
|
Dilution gain on public offering of Teekay Tankers
(note 6) |
|
|
|
|
|
|
|
|
|
|
5,736 |
|
|
|
|
|
|
|
|
|
|
|
5,736 |
|
Sale of 49% interest of OPCO to Teekay Offshore
(note 6) |
|
|
|
|
|
|
|
|
|
|
(94,843 |
) |
|
|
|
|
|
|
94,843 |
|
|
|
|
|
Increase to non-controlling interest from share and
unit issuances of subsidiaries and other |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
101,753 |
|
|
|
101,753 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Balance as at March 31, 2011 |
|
|
71,824 |
|
|
|
685,430 |
|
|
|
1,157,117 |
|
|
|
(3,126 |
) |
|
|
1,544,239 |
|
|
|
3,383,660 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Page 6 of 36
TEEKAY CORPORATION AND SUBSIDIARIES
UNAUDITED
CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME (LOSS)
(in thousands of U.S. dollars)
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended March 31, |
|
|
|
2011 |
|
|
2010 |
|
|
|
$ |
|
|
$ |
|
|
|
|
|
|
|
|
|
|
Net income |
|
|
12,745 |
|
|
|
13,931 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other comprehensive income (loss): |
|
|
|
|
|
|
|
|
Unrealized gain (loss) on marketable securities |
|
|
1,468 |
|
|
|
(1,777 |
) |
Pension adjustments, net of taxes |
|
|
192 |
|
|
|
349 |
|
Unrealized gain (loss) on qualifying cash flow hedging instruments |
|
|
5,498 |
|
|
|
(3,940 |
) |
Realized (gain) loss on qualifying cash flow hedging instruments |
|
|
(985 |
) |
|
|
1,013 |
|
|
|
|
|
|
|
|
Other comprehensive income (loss) |
|
|
6,173 |
|
|
|
(4,355 |
) |
|
|
|
|
|
|
|
Comprehensive income |
|
|
18,918 |
|
|
|
9,576 |
|
Less: Comprehensive income attributable to non-controlling interests |
|
|
(43,530 |
) |
|
|
(27,476 |
) |
|
|
|
|
|
|
|
|
|
|
Comprehensive loss attributable to stockholders of Teekay Corporation |
|
|
(24,612 |
) |
|
|
(17,900 |
) |
|
|
|
|
|
|
|
Page 7 of 36
TEEKAY CORPORATION AND SUBSIDIARIES
NOTES TO THE UNAUDITED CONSOLIDATED FINANCIAL STATEMENTS
(all tabular amounts stated in thousands of U.S. dollars, except share data)
1. Basis of Presentation
The unaudited interim consolidated financial statements have been prepared in conformity with
United States generally accepted accounting principles (or GAAP). They include the accounts of
Teekay Corporation (or Teekay), which is incorporated under the laws of the Republic of the
Marshall Islands, and its wholly-owned or controlled subsidiaries (collectively, the Company).
Certain information and footnote disclosures required by GAAP for complete annual financial
statements have been omitted and, therefore, it is suggested that these interim financial
statements be read in conjunction with the Companys audited financial statements for the year
ended December 31, 2010, included in the Companys Annual Report on Form 20-F. In the opinion of
management, these unaudited financial statements reflect all adjustments, of a normal recurring
nature, necessary to present fairly, in all material respects, the Companys consolidated financial
position, results of operations, cash flows and changes in total equity for the interim periods
presented. The results of operations for the three months ended March 31, 2011, are not necessarily
indicative of those for a full fiscal year. Significant intercompany balances and transactions have
been eliminated upon consolidation.
The preparation of financial statements in conformity with GAAP requires management to make
estimates and assumptions that affect the amounts reported in the financial statements and
accompanying notes. Actual results could differ from those estimates. Given the current credit
markets, it is possible that the amounts recorded as derivative assets and liabilities could vary
by material amounts.
Certain of the comparative figures have been reclassified to conform with the presentation adopted
in the current period, relating to the reclassification of revenues of $8.3 million for the three
months ended March 31, 2010 from time-charter hire expense to revenues in the consolidated
statements of income (loss).
2. Adoption of New Accounting Policies
In January 2011, the Company adopted an amendment to Financial Accounting Standards Board (or FASB)
Accounting Standards Codification (or ASC) 605, Revenue Recognition, that provides for a new
methodology for establishing the fair value for a deliverable in a multiple-element arrangement.
When vendor specific objective or third-party evidence for deliverables in a multiple-element
arrangement cannot be determined, the Company will be required to develop a best estimate of the
selling price of separate deliverables and to allocate the arrangement consideration using the
relative selling price method. This amendment became effective for the Company on January 1, 2011.
The adoption of this standard did not have an impact on the Companys consolidated financial
statements.
3. Segment Reporting
The following tables present results for the Companys four segments for the three months ended
March 31, 2011 and 2010.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Shuttle |
|
|
|
|
|
|
Liquefied |
|
|
Conventional |
|
|
|
|
|
|
Tanker and FSO |
|
|
FPSO |
|
|
Gas |
|
|
Tanker |
|
|
|
|
|
|
Segment |
|
|
Segment |
|
|
Segment |
|
|
Segment |
|
|
Total |
|
Three Months ended March 31, 2011 |
|
$ |
|
|
$ |
|
|
$ |
|
|
$ |
|
|
$ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Revenues |
|
|
151,212 |
|
|
|
104,618 |
|
|
|
64,633 |
|
|
|
167,561 |
|
|
|
488,024 |
|
Voyage expenses |
|
|
19,329 |
|
|
|
|
|
|
|
49 |
|
|
|
25,748 |
|
|
|
45,126 |
|
Vessel operating expenses |
|
|
53,614 |
|
|
|
52,722 |
|
|
|
11,077 |
|
|
|
44,164 |
|
|
|
161,577 |
|
Time-charter hire expense |
|
|
19,627 |
|
|
|
|
|
|
|
|
|
|
|
43,404 |
|
|
|
63,031 |
|
Depreciation and amortization |
|
|
30,619 |
|
|
|
23,731 |
|
|
|
14,856 |
|
|
|
35,832 |
|
|
|
105,038 |
|
General and administrative (2) |
|
|
18,306 |
|
|
|
14,723 |
|
|
|
6,605 |
|
|
|
30,584 |
|
|
|
70,218 |
|
Loss on sale of vessels and equipment,
net of write-downs of vessels and equipment |
|
|
171 |
|
|
|
|
|
|
|
|
|
|
|
3,422 |
|
|
|
3,593 |
|
Restructuring charges |
|
|
3,920 |
|
|
|
|
|
|
|
129 |
|
|
|
912 |
|
|
|
4,961 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Income (loss) from vessel operations |
|
|
5,626 |
|
|
|
13,442 |
|
|
|
31,917 |
|
|
|
(16,505 |
) |
|
|
34,480 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Segment assets |
|
|
1,815,116 |
|
|
|
1,214,009 |
|
|
|
2,879,614 |
|
|
|
2,844,395 |
|
|
|
8,753,134 |
|
Page 8 of 36
TEEKAY CORPORATION AND SUBSIDIARIES
NOTES TO THE UNAUDITED CONSOLIDATED FINANCIAL STATEMENTS
(all tabular amounts stated in thousands of U.S. dollars, except share data)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Shuttle |
|
|
|
|
|
|
Liquefied |
|
|
Conventional |
|
|
|
|
|
|
Tanker and FSO |
|
|
FPSO |
|
|
Gas |
|
|
Tanker |
|
|
|
|
|
|
Segment |
|
|
Segment |
|
|
Segment |
|
|
Segment |
|
|
Total |
|
Three Months ended March 31, 2010 |
|
$ |
|
|
$ |
|
|
$ |
|
|
$ |
|
|
$ |
|
|
|
|
Revenues (1) |
|
|
155,948 |
|
|
|
131,998 |
|
|
|
62,534 |
|
|
|
222,395 |
|
|
|
572,875 |
|
Voyage expenses |
|
|
29,303 |
|
|
|
|
|
|
|
(27 |
) |
|
|
43,274 |
|
|
|
72,550 |
|
Vessel operating expenses |
|
|
43,321 |
|
|
|
47,965 |
|
|
|
11,370 |
|
|
|
51,879 |
|
|
|
154,535 |
|
Time charter hire expense |
|
|
25,038 |
|
|
|
|
|
|
|
|
|
|
|
54,213 |
|
|
|
79,251 |
|
Depreciation and amortization |
|
|
30,559 |
|
|
|
23,748 |
|
|
|
15,527 |
|
|
|
38,396 |
|
|
|
108,230 |
|
General and administrative (2) |
|
|
12,145 |
|
|
|
8,826 |
|
|
|
4,771 |
|
|
|
22,349 |
|
|
|
48,091 |
|
Loss on sale of vessels and equipment,
net of write-downs vessels and equipment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
760 |
|
|
|
760 |
|
Restructuring charges |
|
|
325 |
|
|
|
|
|
|
|
119 |
|
|
|
3,339 |
|
|
|
3,783 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Income from vessel operations |
|
|
15,257 |
|
|
|
51,459 |
|
|
|
30,774 |
|
|
|
8,185 |
|
|
|
105,675 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Segment assets |
|
|
1,700,867 |
|
|
|
1,201,301 |
|
|
|
2,836,617 |
|
|
|
2,844,239 |
|
|
|
8,583,024 |
|
|
|
|
(1) |
|
FPSO segment includes $30.0 million in revenue for the three months ended March 31, 2010,
related to operations in previous years as a result of executing a contract amendment in March
2010. |
|
(2) |
|
Includes direct general and administrative expenses and indirect general and administrative
expenses (allocated to each segment based on estimated use of corporate resources). |
A reconciliation of total segment assets to amounts presented in the accompanying consolidated
balance sheets is as follows:
|
|
|
|
|
|
|
|
|
|
|
March 31, |
|
|
December 31, |
|
|
|
2011 |
|
|
2010 |
|
|
|
$ |
|
|
$ |
|
Total assets of all segments |
|
|
8,753,134 |
|
|
|
8,673,337 |
|
Cash |
|
|
567,325 |
|
|
|
779,748 |
|
Accounts receivable and other assets |
|
|
512,001 |
|
|
|
458,013 |
|
|
|
|
|
|
|
|
Consolidated total assets |
|
|
9,832,460 |
|
|
|
9,911,098 |
|
|
|
|
|
|
|
|
4. Investment in Term Loans
In February 2011, Teekay loaned $70 million to an unrelated ship-owner of a 2011-built Very Large
Crude Carrier (or VLCC). The loan bears interest at 9% per annum and is payable quarterly. The loan
is repayable in full in February 2014. However, it may be repaid prior to maturity at the option of
the borrower. The loan is collateralized by a first priority mortgage on a 2011-built VLCC,
together with other related collateral.
5. Vessel Charters
In addition to the Companys minimum charter hire payments to be paid and received under the Head
Leases and Subleases for the Tangguh LNG Carriers, which are described in Note 9 to the audited
consolidated financial statements included in the Companys Annual Report on Form 20-F for the year
ended December 31, 2010, the additional minimum estimated charter hire payments in the next five
fiscal years, as at March 31, 2011, for the Companys vessels chartered-in and vessels
chartered-out were as follows:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Remainder |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
of 2011 |
|
|
2012 |
|
|
2013 |
|
|
2014 |
|
|
2015 |
|
|
|
(in millions of U.S. dollars) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Charters-in operating leases |
|
|
132.3 |
|
|
|
110.2 |
|
|
|
66.3 |
|
|
|
23.0 |
|
|
|
16.0 |
|
Charters-in capital leases (1) |
|
|
301.8 |
|
|
|
24.0 |
|
|
|
24.0 |
|
|
|
24.0 |
|
|
|
24.0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
434.1 |
|
|
|
134.2 |
|
|
|
90.3 |
|
|
|
47.0 |
|
|
|
40.0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Charters-out operating leases (2) |
|
|
875.8 |
|
|
|
948.8 |
|
|
|
718.2 |
|
|
|
602.7 |
|
|
|
560.3 |
|
Charters-out direct financing leases |
|
|
51.4 |
|
|
|
62.4 |
|
|
|
49.5 |
|
|
|
48.1 |
|
|
|
47.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
927.2 |
|
|
|
1,011.2 |
|
|
|
767.7 |
|
|
|
650.8 |
|
|
|
607.4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(1) |
|
As at March 31, 2011 and December 31, 2010, the Company had $565.3 million and $559.8
million, respectively of cash which, including any interest earned on such amounts, is
restricted to being used for charter hire payments of certain vessels chartered-in under
capital leases. The Company also maintains restricted cash deposits relating to certain term
loans, which cash totaled $16.6 million and $12.3 million as at March 31, 2011 and December
31, 2010, respectively. |
|
(2) |
|
The minimum scheduled future charter hire payments for vessels chartered out should not be
construed to reflect total charter hire revenues for any of the periods. In addition, minimum
scheduled future revenues have been reduced by estimated off-hire time for period maintenance.
The amounts may vary given unscheduled future events such as vessel maintenance. |
Page 9 of 36
TEEKAY CORPORATION AND SUBSIDIARIES
NOTES TO THE UNAUDITED CONSOLIDATED FINANCIAL STATEMENTS
(all tabular amounts stated in thousands of U.S. dollars, except share data)
6. Financing Transactions
In February 2011, Teekays subsidiary, Teekay Tankers Ltd. (or Teekay Tankers) completed a public
offering of 9.9 million common shares of its Class A Common Stock (including 1.3 million common
shares issued upon the exercise of the underwriters overallotment option) at a price of $11.33 per
share, for gross proceeds of approximately $112.1 million. As a result, Teekays ownership of
Teekay Tankers was reduced to 26.0%. Teekay maintains voting control of Teekay Tankers through its
ownership of shares of Teekay Tankers Class A and Class B common stock and continues to
consolidate this subsidiary. As a result of the offering, the Company recorded an increase to
retained earnings of $5.7 million, which represents the Companys dilution gain from the issuance
of shares in Teekay Tankers during the three months ended March 31, 2011.
In March 2011, Teekay sold a 49% interest in Teekay Offshore Operating L.P. (or OPCO) to Teekays
subsidiary, Teekay Offshore Partners L.P. (or Teekay Offshore), for a total purchase price of
$386.3 million. The sale increased Teekay Offshores ownership in OPCO from 51% to 100%. The
purchase price was paid with $175 million in cash (less $15 million in distributions made by OPCO
to Teekay between December 31, 2010 and the date of acquisition) and 7.6 million newly issued
Teekay Offshore common units. Teekays ownership in Teekay Offshore increased to 36.9% (including
the Companys 2% general partner interest). Consequently, the Company recognized a decrease to
retained earnings and an increase in non-controlling interest of $94.8 million as the Company
accounts for changes in its ownership interest in controlled subsidiaries as equity transactions.
See Note 19 to these unaudited consolidated financial statements for information relating to an
equity offering by Teekays subsidiary, Teekay LNG Partners L.P. (or Teekay LNG) in April 2011.
7. Vessel Sale and Write-down
a) Vessel Sale
In March 2011, the Company sold a 1988-built floating storage and offtake (or FSO) unit. The FSO
unit was part of the Companys FSO and shuttle tanker segment. The Company realized a loss of $0.2
million from the sale of the FSO unit.
b) Vessel Write-down
The Companys consolidated statements of income (loss) for the three months ended March 31, 2011,
include a $3.4 million write-down for impairment of a 1993-built Aframax tanker to its estimated
fair value of $14.5 million, as the vessel carrying value exceeded the estimated fair value. The
fair value was calculated based on the value of its estimated discounted cash flows which primarily
includes the estimated sales price. The write-down is included within the Companys conventional
tanker segment.
8. Long-Term Debt
|
|
|
|
|
|
|
|
|
|
|
March 31, 2011 |
|
|
December 31, 2010 |
|
|
|
$ |
|
|
$ |
|
|
|
|
Revolving Credit Facilities |
|
|
1,723,469 |
|
|
|
1,697,237 |
|
Senior Notes (8.875%) due July 15, 2011 |
|
|
16,201 |
|
|
|
16,201 |
|
Senior Notes (8.5%) due January 15, 2020 |
|
|
446,623 |
|
|
|
446,559 |
|
Norwegian Kroner-denominated Bonds due November 2013 |
|
|
108,315 |
|
|
|
103,061 |
|
U.S. Dollar-denominated Term Loans due through 2021 |
|
|
1,752,359 |
|
|
|
1,782,423 |
|
Euro-denominated Term Loans due through 2023 |
|
|
391,539 |
|
|
|
373,301 |
|
U.S. Dollar-denominated Unsecured Demand Loans due to Joint Venture Partners |
|
|
13,383 |
|
|
|
13,282 |
|
|
|
|
|
|
|
|
Total |
|
|
4,451,889 |
|
|
|
4,432,064 |
|
Less current portion |
|
|
472,074 |
|
|
|
276,508 |
|
|
|
|
|
|
|
|
Long-term portion |
|
|
3,979,815 |
|
|
|
4,155,556 |
|
|
|
|
|
|
|
|
As of March 31, 2011, the Company had 15 long-term revolving credit facilities (or the Revolvers)
available, which, as at such date, provided for aggregate borrowings of up to $3.3 billion, of
which $1.6 billion was undrawn. Interest payments are based on LIBOR plus margins; at March 31,
2011 and December 31, 2010, the margins ranged between 0.45% and 3.25%. At March 31, 2011 and
December 31, 2010, the three-month LIBOR was 0.30%. The total amount available under the Revolvers
reduces by $223.3 million (remainder of 2011), $353.3 million (2012), $760.2 million (2013), $791.8
million (2014), $226.4 million (2015) and $930.4 million (thereafter). The Revolvers are
collateralized by first-priority mortgages granted on 64 of the Companys vessels, together with
other related security, and include a guarantee from Teekay or its subsidiaries for all outstanding
amounts.
Page 10 of 36
TEEKAY CORPORATION AND SUBSIDIARIES
NOTES TO THE UNAUDITED CONSOLIDATED FINANCIAL STATEMENTS
(all tabular amounts stated in thousands of U.S. dollars, except share data)
In January 2010, the Company completed a public offering of senior unsecured notes due January 15,
2020 (or the 8.5% Notes) with a principal amount of $450 million. The 8.5% Notes were sold at a
price equal to 99.181% of par and the discount is accreted using the effective interest rate of
8.625% per year. The Company capitalized issuance costs of $9.4 million, which is recorded in other
non-current assets in the consolidated balance sheet and is amortized to interest expense over the
term of the senior unsecured notes. The 8.5% Notes and the 8.875% senior unsecured notes due July
15, 2011 (or the 8.875% Notes) rank equally in right of payment with all of Teekays existing and
future senior unsecured debt and senior to any future subordinated debt of Teekay. The 8.5% Notes
and 8.875% Notes are not guaranteed by any of Teekays subsidiaries and effectively rank behind all
existing and future secured debt of Teekay and other liabilities of its subsidiaries. In 2010, the
Company repurchased a principal amount of $160.5 million of the 8.875% Notes, using a portion of
the proceeds of the 8.5% Notes offering, and recognized a loss on repurchase of $12.6 million.
The Company may redeem the 8.5% Notes in whole or in part at any time before their maturity date at
a redemption price equal to the greater of (i) 100% of the principal amount of the 8.5% Notes to be
redeemed and (ii) the sum of the present values of the remaining scheduled payments of principal
and interest on the 8.5% Notes to be redeemed (excluding accrued interest) discounted to the
redemption date on a semi-annual basis, at the treasury yield plus 50 basis points, plus accrued
and unpaid interest to the redemption date. In addition, at any time or from time to time prior to
January 15, 2013, the Company may redeem up to 35% of the aggregate principal amount of the 8.5%
Notes issued under the indenture with the net cash proceeds of one or more qualified equity
offerings at a redemption price equal to 108.5% of the principal amount of the 8.5% Notes to be
redeemed, plus accrued and unpaid interest, if any, to the redemption date, provided certain
conditions are met. No such redemptions have been made as at March 31, 2011.
In November 2010, Teekay Offshore issued NOK 600 million in senior unsecured bonds that mature in
November 2013 in the Norwegian bond market. Teekay Offshore capitalized issuance costs of $1.3
million, which is recorded in other non-current assets in the consolidated balance sheet and is
amortized over the term of the senior unsecured bonds. The bonds are listed on the Oslo Stock
Exchange. Interest payments on the senior unsecured bonds are based on NIBOR plus a margin of
4.75%. Teekay Offshore has entered into a cross currency swap arrangement to swap the interest
payments from NIBOR into LIBOR and principal from Norwegian Kroner to U.S. dollars (see Note 15).
As of March 31, 2011, the Company had 14 U.S. Dollar-denominated term loans outstanding, which
totaled $1.8 billion (December 31, 2010 $1.8 billion). Certain of the term loans with a total
outstanding principal balance of $406.2 million as at March 31, 2011 (December 31, 2010 $417.4
million) bear interest at a weighted-average fixed rate of 5.3% (December 31, 2010 5.3%).
Interest payments on the remaining term loans are based on LIBOR plus a margin. At March 31, 2011
and December 31, 2010, the margins ranged between 0.3% and 3.25%. At March 31, 2011 and December
31, 2010, the three-month LIBOR was 0.30%. The term loan payments are made in quarterly or
semi-annual payments commencing three or six months after delivery of each newbuilding vessel
financed thereby, and 13 of the term loans have balloon or bullet repayments due at maturity. The
term loans are collateralized by first-priority mortgages on 27 (December 31, 2010 28) of the
Companys vessels, together with certain other security. In addition, at March 31, 2011, all but
$105.7 million (December 31, 2010 $122.5 million) of the outstanding term loans were guaranteed
by Teekay or its subsidiaries.
The Company has two Euro-denominated term loans outstanding, which, as at March 31, 2011, totaled
276.5 million Euros ($391.5 million). The Company repays the loans with funds generated by two
Euro-denominated long-term time-charter contracts. Interest payments on the loans are based on
EURIBOR plus a margin. At March 31, 2011 and December 31, 2010, the margins ranged between 0.6% and
0.66% and the one-month EURIBOR at March 31, 2011, was 0.97% (December 31, 2010 0.78%). The
Euro-denominated term loans reduce in monthly payments with varying maturities through 2023 and are
collateralized by first-priority mortgages on two of the Companys vessels, together with certain
other security, and are guaranteed by a subsidiary of Teekay.
Both Euro-denominated term loans are revalued at the end of each period using the then prevailing
Euro/U.S. Dollar exchange rate. Due in part to this revaluation which is unrealized, the Company
recognized a foreign exchange loss of $20.3 million during the three months ended March 31, 2011
(2010 $29.0 million gain).
The Company has two U.S. Dollar-denominated loans outstanding owing to two joint venture partners,
which, as at March 31, 2011, totaled $13.4 million (2010 one loan totaling $13.8 million),
including accrued interest. Interest payments on the loan, which are based on a fixed interest rate
of 4.84%, commenced in February 2008. This loan is repayable on demand no earlier than February 27,
2027.
The weighted-average effective interest rate on the Companys long-term aggregate debt as at March
31, 2011 was 2.3% (December 31, 2010 2.3%). This rate does not include the effect of the
Companys interest rate swap agreements (see Note 15).
Among other matters, the Companys long-term debt agreements generally provide for maintenance of
certain vessel market value-to-loan ratios and minimum consolidated financial covenants. Certain
loan agreements require that a minimum level of free cash be maintained and as at March 31, 2011
and December 31, 2010, this amount was $100.0 million. Certain of the loan agreements also require
that the Company maintain an aggregate level of free liquidity and undrawn revolving credit lines
with at least six months to maturity of at least 7.5% of total debt. As at March 31, 2011, this
amount was $236.7 million (December 31, 2010 $236.5 million).
The aggregate annual long-term debt principal repayments required to be made by the Company
subsequent to March 31, 2011, are $222.7 million (remainder of 2011), $524.9 million (2012), $463.2
million (2013), $912.7 million (2014), $216.8 million (2015) and $2.1 billion (thereafter).
As at March 31, 2011, the Company was in compliance with all covenants in the credit facilities and
long-term debt.
Page 11 of 36
TEEKAY CORPORATION AND SUBSIDIARIES
NOTES TO THE UNAUDITED CONSOLIDATED FINANCIAL STATEMENTS
(all tabular amounts stated in thousands of U.S. dollars, except share data)
9. Capital Stock
The authorized capital stock of Teekay at March 31, 2011 and December 31, 2010, was 25 million
shares of Preferred Stock, with a par value of $1 per share, and 725 million shares of Common
Stock, with a par value of $0.001 per share. During the three months ended March 31, 2011, the
Company issued 0.4 million shares of common stock upon the exercise of stock options, and
repurchased 0.6 million shares. As at March 31, 2011, Teekay had 74,142,366 shares of Common Stock
issued (December 31, 2010 73,749,793) and no shares of Preferred Stock issued. As at March 31,
2011, Teekay had 71,822,916 shares of Common Stock outstanding (December 31, 2010 72,012,843).
During 2008, Teekay announced that its Board of Directors had authorized the repurchase of up to
$200 million of shares of its Common Stock in the open market, subject to cancellation upon
approval by the Board of Directors. As at March 31, 2011, Teekay had repurchased approximately 1.8
million shares of Common Stock for $60 million pursuant to such authorization. The total remaining
share repurchase authorization at March 31, 2011, was $140 million.
During March 2011, the Company granted 91,431 stock options with an exercise price of $34.93 per
share, 358,180 restricted stock units with a fair value of $12.5 million, 73,349 performance shares
with a fair value of $3.7 million and 29,663 shares of restricted stock with a fair value of $1.0
million to certain of the Companys employees and directors. Each stock option has a ten-year term
and vests equally over three years from the grant date. Each restricted stock unit and performance
share is equal in value to one share of the Companys common stock plus reinvested dividends from
the grant date to the vesting date. The restricted stock units vest equally over three years from
the grant date and the performance shares vest three years from the grant date. Upon vesting, the
value of the restricted stock units and performance shares are paid to each grantee in the form of
shares. The number of performance share units that vest will range from zero to three times the
original number granted, based on certain performance and market conditions.
In March 2011, the Company incurred a one-time $11.0 million increase to the pension plan benefits
of Bjorn Moller, who retired from his position as the Companys President and Chief Executive
Officer on April 1, 2011. The additional pension benefit was in recognition of Mr. Mollers service
to the Company. In addition, the Company recognized a compensation expense of approximately $4.7
million which relates to the portion of Mr. Mollers outstanding stock-based compensation grants
that had not yet vested on the date of his retirement. The total compensation expense related to
Mr. Mollers retirement of $15.7 million was recorded in general and administrative expense in the
consolidated statements of income (loss) for the three months ended March 31, 2011.
The weighted-average grant-date fair value of stock options granted during March 2011 was $11.27
per option. The fair value of each stock option granted was estimated on grant date using the
Black-Scholes option pricing model. The following weighted-average assumptions were used in
computing the fair value of the stock options granted: expected volatility of 53.6%; expected life
of four years; dividend yield of 3.8%; risk-free interest rate of 2.1%; and estimated forfeiture
rate of 11%. The expected life of the stock options granted was estimated using the historical
exercise behavior of employees. The expected volatility was generally based on historical
volatility as calculated using historical data during the five years prior to the grant date.
10. Commitments and Contingencies
a) Vessels Under Construction
In October 2010, the Company signed a contract with Petroleo Brasileiro SA (or Petrobras) to
provide a floating, production, storage and offloading (or FPSO) unit for the Tiro and Sidon fields
located in the Santos Basin offshore Brazil. The contract with Petrobras will be serviced by a
newly converted FPSO unit, to be named the Petrojarl Cidade de Itajai, which is currently under
conversion from an existing Aframax tanker, for a total estimated cost of approximately $345
million, excluding capitalized interest. In May 2011, the Company signed an agreement with
Odebrecht Oil & Gas S.A. (or Odebrecht) to be a 50% partner in this project. The new FPSO is
scheduled to be delivered in the second quarter of 2012. Upon delivery, the unit will commence
operations under a nine-year, fixed-rate time-charter contract to Petrobras with six additional
one-year extension options.
As at March 31, 2011, the Company was committed to the construction of three liquefied petroleum
gas (or LPG) carriers, two shuttle tankers and the conversion of an existing Aframax tanker to an
FPSO unit (as described above), at a total cost of approximately $702.4 million, excluding
capitalized interest. One shuttle tanker delivered in May 2011 and the other shuttle tanker is
scheduled for delivery in July 2011. The three LPG carriers are scheduled for delivery in 2011 and
the FPSO unit is scheduled to be delivered in 2012. As at March 31, 2011, payments made towards
these commitments totaled $236.1 million (excluding $22.3 million of capitalized interest and other
miscellaneous construction costs), and long-term financing arrangements existed for $191.8 million
of the unpaid cost of these vessels. As at March 31, 2011, the remaining payments required to be
made under these newbuilding contracts were $403.2 million (remainder of 2011) and $63.1 million
(2012).
Page 12 of 36
TEEKAY CORPORATION AND SUBSIDIARIES
NOTES TO THE UNAUDITED CONSOLIDATED FINANCIAL STATEMENTS
(all tabular amounts stated in thousands of U.S. dollars, except share data)
b) Joint Ventures
The Company has a 33% interest in a joint venture that will charter four newbuilding 160,400-cubic
meter liquefied natural gas (or LNG) carriers for a period of 20 years to the Angola LNG Project,
which is being developed by subsidiaries of Chevron Corporation, Sociedade Nacional de Combustiveis
de Angola EP, BP Plc, Total S.A. and ENI SpA. Final award of the charter was made in December
2007. The vessels will be chartered at fixed rates, with inflation adjustments, commencing in
2011. The other members of the joint venture are Mitsui & Co., Ltd. and NYK Bulkship (Europe) Ltd.,
which hold 34% and 33% interests in the joint venture, respectively. In connection with this award,
the joint venture has entered into agreements with Samsung Heavy Industries Co. Ltd. to construct
the four LNG carriers at a total cost of approximately $906.0 million (of which the Companys 33%
portion is $299.0 million), excluding capitalized interest. As at March 31, 2011, payments made
towards these commitments by the joint venture company totaled $339.7 million (of which the
Companys 33% contribution was $112.1 million), excluding capitalized interest and other
miscellaneous construction costs. As at March 31, 2011, the remaining payments required to be made
under these contracts were $430.3 million (remainder of 2011) and $135.9 million (2012), of which
the Companys share is 33% of these amounts. In accordance with existing agreements, the Company is
required to offer to its subsidiary Teekay LNG Partners L.P. (or Teekay LNG) its 33% interest in
these vessels and related charter contracts, no later than 180 days before the scheduled delivery
dates of the vessels. Deliveries of the vessels are scheduled between August 2011 and January 2012.
In February 2011, the Company offered to Teekay LNG its 33% ownership interest in these vessels and
related charter contracts. The transaction was approved in March 2011 by the Board of Directors of
Teekay LNGs general partner and by its Conflicts Committee. The Company has also provided certain
guarantees in relation to the performance of the joint venture company. The fair value of the
guarantees were liabilities of $1.7 million and $1.8 million, respectively, as at March 31, 2011
and December 31, 2010 and are included as part of other long-term liabilities in the Companys
consolidated balance sheets.
In September 2010, Teekay Tankers entered into a joint venture arrangement (the Joint Venture) with
Wah Kwong Maritime Transport Holdings Limited (or Wah Kwong) to have a VLCC newbuilding
constructed, managed and chartered to third parties. Teekay Tankers has a 50% economic interest in
the Joint Venture, which is jointly controlled by Teekay Tankers and Wah Kwong. The VLCC has an
estimated purchase price of approximately $98 million (of which the Companys 50% portion is $49
million), excluding capitalized interest and other miscellaneous construction costs. The vessel is
expected to deliver during the second quarter of 2013. As at March 31, 2011, the remaining payments
required to be made under this newbuilding contract, including Wah Kwongs 50% share, was $nil
(remainder of 2011), $39.2 million (2012) and $39.2 million (2013). As of March 31, 2011, the Joint
Venture did not have any financing arrangements for these expenditures. Teekay Tankers and Wah
Kwong have each agreed to finance 50% of the costs to acquire the VLCC that are not financed with
commercial bank financing. As of March 31, 2011, Teekay Tankers had advanced $9.8 million to the
Joint Venture and the amount is recorded in loans to joint ventures and joint venture partners in
the consolidated balance sheet. A third party has agreed to time-charter the vessel following its
delivery for a term of five years at a daily rate and has also agreed to pay the Joint Venture 50%
of any additional amounts if the daily rate of any sub-charter earned by the third party exceeds a
certain threshold.
c) Legal Proceedings and Claims
The Company may, from time to time, be involved in legal proceedings and claims that arise in the
ordinary course of business. The Company believes that any adverse outcome of existing claims,
individually or in the aggregate, would not have a material effect on its financial position,
results of operations or cash flows, when taking into account its insurance coverage and
indemnifications from charterers.
d) Redeemable Non-Controlling Interest
During February 2010, an unrelated party contributed a shuttle tanker with a value of $35.0 million
to a subsidiary of Teekay Offshore for a 33% equity interest in the subsidiary. The non-controlling
interest owner of Teekay Offshores 67% owned subsidiary holds a put option which, if exercised,
would obligate Teekay Offshore to purchase the non-controlling interest owners 33% share in the
entity for cash in accordance with a defined formula. The redeemable non-controlling interest is
subject to remeasurement if the formulaic redemption amount exceeds the carrying value. No
remeasurement was required as at March 31, 2011.
e) Other
The Company enters into indemnification agreements with certain officers and directors. In
addition, the Company enters into other indemnification agreements in the ordinary course of
business. The maximum potential amount of future payments required under these indemnification
agreements is unlimited. However, the Company maintains what it believes is appropriate liability
insurance that reduces its exposure and enables the Company to recover future amounts paid up to
the maximum amount of the insurance coverage, less any deductible amounts pursuant to the terms of
the respective policies, the amounts of which are not considered material.
Page 13 of 36
TEEKAY CORPORATION AND SUBSIDIARIES
NOTES TO THE UNAUDITED CONSOLIDATED FINANCIAL STATEMENTS
(all tabular amounts stated in thousands of U.S. dollars, except share data)
11. Financial Instruments
a) Fair Value Measurements
For a description of how the Company estimates fair value, refer to Note 11 to the audited
consolidated financial statements in the Companys Annual Report on Form 20-F for the year ended
December 31, 2010. The estimated fair value of the Companys financial instruments and other
non-financial assets and categorization using the fair value hierarchy for those financial
instruments that are measured at fair value on a recurring basis is as follows:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
March 31, 2011 |
|
|
December 31, 2010 |
|
|
|
|
|
|
|
Carrying |
|
|
Fair |
|
|
Carrying |
|
|
Fair |
|
|
|
Fair Value |
|
|
Amount |
|
|
Value |
|
|
Amount |
|
|
Value |
|
|
|
Hierarchy |
|
|
Asset (Liability) |
|
|
Asset (Liability) |
|
|
Asset (Liability) |
|
|
Asset (Liability) |
|
|
|
Level(1) |
|
|
$ |
|
|
$ |
|
|
$ |
|
|
$ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cash and cash equivalents, restricted
cash, and marketable securities |
|
Level 1 |
|
|
1,176,540 |
|
|
|
1,176,540 |
|
|
|
1,377,399 |
|
|
|
1,377,399 |
|
Investment in term loans and interest
receivable (note 4) |
|
|
|
|
|
|
188,493 |
|
|
|
191,031 |
|
|
|
117,825 |
|
|
|
120,837 |
|
Loans to joint ventures and joint
venture partners |
|
|
|
|
|
|
33,500 |
|
|
|
33,500 |
|
|
|
32,750 |
|
|
|
32,750 |
|
Loans from joint venture partners |
|
|
|
|
|
|
(14,500 |
) |
|
|
(14,500 |
) |
|
|
(59 |
) |
|
|
(59 |
) |
Long-term debt |
|
|
|
|
|
|
(4,451,889 |
) |
|
|
(4,217,058 |
) |
|
|
(4,432,064 |
) |
|
|
(4,192,646 |
) |
Derivative instruments (note 15) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Interest rate swap agreements (2) |
|
Level 2 |
|
|
(394,964 |
) |
|
|
(394,964 |
) |
|
|
(557,991 |
) |
|
|
(557,991 |
) |
Interest rate swap agreements (2) |
|
Level 2 |
|
|
55,631 |
|
|
|
55,631 |
|
|
|
66,869 |
|
|
|
66,869 |
|
Cross currency swap agreement |
|
Level 2 |
|
|
10,503 |
|
|
|
10,503 |
|
|
|
4,233 |
|
|
|
4,233 |
|
Foreign currency contracts |
|
Level 2 |
|
|
22,511 |
|
|
|
22,511 |
|
|
|
11,375 |
|
|
|
11,375 |
|
Forward freight agreements |
|
Level 2 |
|
|
(7 |
) |
|
|
(7 |
) |
|
|
|
|
|
|
|
|
Foinaven embedded derivative |
|
Level 2 |
|
|
(3,507 |
) |
|
|
(3,507 |
) |
|
|
(3,500 |
) |
|
|
(3,500 |
) |
|
|
|
(1) |
|
The fair value hierarchy level is only applicable to each financial instrument on the
consolidated balance sheets that are recorded at fair value on a recurring basis. |
|
(2) |
|
The fair value of the Companys interest rate swap agreements at March 31, 2011 includes
$21.0 million (December 31, 2010 $31.0 million) of net accrued interest which is recorded in
accrued liabilities on the consolidated balance sheet. |
Other than certain items disclosed in Note 7(b) to these consolidated financial statements, there
are no other non-financial assets or non-financial liabilities carried at fair value at March 31,
2011.
b) Financing Receivables
The following table contains a summary of the Companys financing receivables by type of borrower
and the method by which the Company monitors the credit quality of its financing receivables on a
quarterly basis.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
March 31, |
|
|
December 31, |
|
|
|
Credit Quality |
|
|
|
2011 |
|
|
2010 |
|
Class of Financing Receivable |
|
Indicator |
|
Grade |
|
$ |
|
|
$ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Direct financing leases |
|
Payment activity |
|
Performing |
|
|
480,248 |
|
|
|
487,516 |
|
Other loan receivables |
|
|
|
|
|
|
|
|
|
|
|
|
Investment in term loans and interest receivable |
|
Collateral |
|
Performing |
|
|
188.493 |
|
|
|
117,825 |
|
Loans to joint ventures current and long-term |
|
Other internal metrics |
|
Performing |
|
|
34,682 |
|
|
|
33,932 |
|
Long-term receivable included in other assets |
|
Payment activity |
|
Performing |
|
|
503 |
|
|
|
410 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
703,926 |
|
|
|
639,683 |
|
|
|
|
|
|
|
|
|
|
|
|
12. Restructuring Charges
During the three months ended March 31, 2011, the Company incurred $5.0 million of restructuring
costs. The restructuring costs primarily relate to the sale of an FSO unit, Karratha Spirit, and
the termination of the time-charter for the Basker Spirit. The Company committed to plans for
termination of the employment of certain seafarers of the two vessels. At March 31, 2011 and
December 31, 2010, $3.8 and $0.1 million, respectively, of restructuring liabilities were recorded
in accrued liabilities on the consolidated balance sheets.
13. Other Income
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended March 31, |
|
|
|
2011 |
|
|
2010 |
|
|
|
$ |
|
|
$ |
|
Volatile organic compound emission plant lease income |
|
|
903 |
|
|
|
1,430 |
|
Miscellaneous (loss) income |
|
|
(809 |
) |
|
|
992 |
|
|
|
|
|
|
|
|
Other income |
|
|
94 |
|
|
|
2,422 |
|
|
|
|
|
|
|
|
Page 14 of 36
TEEKAY CORPORATION AND SUBSIDIARIES
NOTES TO THE UNAUDITED CONSOLIDATED FINANCIAL STATEMENTS
(all tabular amounts stated in thousands of U.S. dollars, except share data)
14. Accumulated Other Comprehensive Loss
As at March 31, 2011 and December 31, 2010, the Companys accumulated other comprehensive loss
consisted of the following components:
|
|
|
|
|
|
|
|
|
|
|
March 31, |
|
|
December 31, |
|
|
|
2011 |
|
|
2010 |
|
|
|
$ |
|
|
$ |
|
Unrealized gain on qualifying cash flow hedging instruments |
|
|
5,692 |
|
|
|
2,307 |
|
Pension adjustments, net of tax recoveries |
|
|
(17,359 |
) |
|
|
(17,551 |
) |
Unrealized gain on marketable securities |
|
|
8,541 |
|
|
|
7,073 |
|
|
|
|
|
|
|
|
|
|
|
(3,126 |
) |
|
|
(8,171 |
) |
|
|
|
|
|
|
|
15. Derivative Instruments and Hedging Activities
The Company uses derivatives to manage certain risks in accordance with its overall risk management
policies.
Foreign Exchange Risk
The Company economically hedges portions of its forecasted expenditures denominated in foreign
currencies with foreign currency forward contracts. Certain foreign currency forward contracts are
designated, for accounting purposes, as cash flow hedges of forecasted foreign currency
expenditures.
As at March 31, 2011, the Company was committed to the following foreign currency forward
contracts:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fair Value / Carrying Amount |
|
|
|
|
|
|
Contract Amount |
|
|
Average |
|
|
of Asset / (Liability) |
|
|
Expected Maturity |
|
|
|
In Foreign |
|
|
Forward |
|
|
|
|
|
|
|
|
|
Remainder of |
|
|
|
|
|
|
Currency |
|
|
Rate(1) |
|
|
Hedge |
|
|
Non-Hedge |
|
|
2011 |
|
|
2012 |
|
|
|
(millions) |
|
|
|
|
|
|
(in millions of U.S. Dollars) |
|
Norwegian Kroner |
|
|
910.5 |
|
|
|
6.24 |
|
|
$ |
7.1 |
|
|
$ |
9.2 |
|
|
$ |
93.7 |
|
|
$ |
52.3 |
|
Euro |
|
|
41.9 |
|
|
|
0.75 |
|
|
|
|
|
|
|
2.9 |
|
|
|
39.9 |
|
|
|
16.2 |
|
Canadian Dollar |
|
|
22.5 |
|
|
|
1.03 |
|
|
|
1.3 |
|
|
|
|
|
|
|
14.3 |
|
|
|
7.4 |
|
British Pounds |
|
|
30.1 |
|
|
|
0.65 |
|
|
|
0.5 |
|
|
|
1.5 |
|
|
|
32.2 |
|
|
|
13.9 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$ |
8.9 |
|
|
$ |
13.6 |
|
|
$ |
180.1 |
|
|
$ |
89.8 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(1) |
|
Average contractual exchange rate represents the contracted amount of foreign currency
one U.S. Dollar will buy. |
The Company incurs interest expense on its Norwegian Kroner-denominated bonds. The Company entered
into a cross currency swap agreement to economically hedge the foreign exchange risk on the
principal and interest. As at March 31, 2011, the Company was committed to one cross currency swap
with the notional amounts of NOK 600 million and $98.5 million, which exchanges a receipt of
floating interest based on NIBOR plus a margin of 4.75% with a payment of floating interest based
on LIBOR plus a margin of 5.04%. In addition, the cross currency swap locks in the transfer of
principal to $98.5 million upon maturity in exchange for NOK 600 million. The fair value of the
cross currency swap agreement as at March 31, 2011 and December 31, 2010 was $10.5 million and $4.2
million, respectively.
Interest Rate Risk
The Company enters into interest rate swap agreements which exchange a receipt of floating interest
for a payment of fixed interest to reduce the Companys exposure to interest rate variability on
its outstanding floating-rate debt. In addition, the Company holds interest rate swaps which
exchange a payment of floating rate interest for a receipt of fixed interest in order to reduce the
Companys exposure to the variability of interest income on its restricted cash deposits. The
Company has not designated its interest rate swap agreements as cash flow hedges for accounting
purposes.
Page 15 of 36
TEEKAY CORPORATION AND SUBSIDIARIES
NOTES TO THE UNAUDITED CONSOLIDATED FINANCIAL STATEMENTS
(all tabular amounts stated in thousands of U.S. dollars, except share data)
As at March 31, 2011, the Company was committed to the following interest rate swap agreements
related to its LIBOR-based debt, restricted cash deposits and EURIBOR-based debt, whereby certain
of the Companys floating-rate debt and restricted cash deposits were swapped with fixed-rate
obligations or fixed-rate deposits:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fair Value / |
|
|
Weighted- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Carrying Amount |
|
|
Average |
|
|
Fixed |
|
|
|
|
|
|
Principal |
|
|
of Asset / |
|
|
Remaining |
|
|
Interest |
|
|
|
Interest |
|
|
Amount |
|
|
(Liability) |
|
|
Term |
|
|
Rate |
|
|
|
Rate Index |
|
|
$ |
|
|
$ |
|
|
(Years) |
|
|
(%)(1) |
|
LIBOR-Based Debt: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
U.S. Dollar-denominated interest rate swaps (2) |
|
LIBOR |
|
|
433,707 |
|
|
|
(50,108 |
) |
|
|
25.8 |
|
|
|
4.9 |
|
U.S. Dollar-denominated interest rate swaps |
|
LIBOR |
|
|
3,257,937 |
|
|
|
(292,565 |
) |
|
|
8.8 |
|
|
|
4.1 |
|
U.S. Dollar-denominated interest rate swaps (3) |
|
LIBOR |
|
|
200,000 |
|
|
|
(36,636 |
) |
|
|
20.0 |
|
|
|
5.7 |
|
LIBOR-Based Restricted Cash Deposit: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
U.S. Dollar-denominated interest rate swaps (2) |
|
LIBOR |
|
|
471,245 |
|
|
|
54,961 |
|
|
|
25.8 |
|
|
|
4.8 |
|
EURIBOR-Based Debt: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Euro-denominated interest rate swaps (4) (5) |
|
EURIBOR |
|
|
391,539 |
|
|
|
(14,985 |
) |
|
|
13.2 |
|
|
|
3.8 |
|
|
|
|
(1) |
|
Excludes the margins the Company pays on its variable-rate debt, which at of March 31, 2011
ranged from 0.30% to 3.25%. |
|
(2) |
|
Principal amount reduces quarterly. |
|
(3) |
|
Commencement dates of swaps are between June 2011 and September 2011 for a total principal
amount of $200 million. |
|
(4) |
|
Principal amount reduces monthly to 70.1 million Euros ($99.2 million) by the maturity dates of
the swap agreements. |
|
(5) |
|
Principal amount is the U.S. Dollar equivalent of 276.5 million Euros. |
Spot Tanker Market Risk
In order to reduce variability in revenues from fluctuations in certain spot tanker market rates,
from time to time the Company has entered into forward freight agreements (or FFAs). FFAs involve
contracts to move a theoretical volume of freight at fixed-rates, thus attempting to reduce the
Companys exposure to spot tanker market rates. These FFAs expire between April and June 2011. The
Company has not designated these contracts as cash flow hedges for accounting purposes. Net gains
and losses from FFAs are recorded within realized and unrealized gain (loss) on non-designated
derivative instruments in the consolidated statements of income (loss).
Commodity Price Risk
The Company enters into bunker fuel swap contracts relating to a portion of its bunker fuel
expenditures. As at March 31, 2011, the Company had no bunker fuel swap contract commitments. Net
gains and losses from bunker fuel swap contracts are recorded within realized and unrealized gain
(loss) on non-designated derivative instruments in the consolidated statements of income (loss).
Tabular Disclosure
The following table presents the location and fair value amounts of derivative instruments,
segregated by type of contract, on the Companys consolidated balance sheets.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Current |
|
|
|
|
|
|
|
|
|
|
Current |
|
|
|
|
|
|
Portion of |
|
|
|
|
|
|
|
|
|
|
Portion of |
|
|
|
|
|
|
Derivative |
|
|
Derivative |
|
|
Accrued |
|
|
Derivative |
|
|
Derivative |
|
|
|
Assets |
|
|
Assets |
|
|
Liabilities |
|
|
Liabilities |
|
|
Liabilities |
|
|
|
|
As at March 31, 2011: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Derivatives designated as a cash flow hedge: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Foreign currency contracts |
|
|
6,890 |
|
|
|
2,030 |
|
|
|
|
|
|
|
(30 |
) |
|
|
|
|
Derivatives not designated as a cash flow hedge: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Foreign currency contracts |
|
|
10,952 |
|
|
|
2,906 |
|
|
|
|
|
|
|
(237 |
) |
|
|
|
|
Interest rate swaps |
|
|
16,889 |
|
|
|
33,798 |
|
|
|
(21,250 |
) |
|
|
(123,265 |
) |
|
|
(245,504 |
) |
Cross currency swap agreement |
|
|
2,695 |
|
|
|
7,567 |
|
|
|
241 |
|
|
|
|
|
|
|
|
|
Forward freight agreements |
|
|
7 |
|
|
|
|
|
|
|
|
|
|
|
(14 |
) |
|
|
|
|
Foinaven embedded derivative |
|
|
3,860 |
|
|
|
|
|
|
|
|
|
|
|
(7,367 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
41,293 |
|
|
|
46,301 |
|
|
|
(21,009 |
) |
|
|
(130,913 |
) |
|
|
(245,504 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
As at December 31, 2010: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Derivatives designated as a cash flow hedge: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Foreign currency contracts |
|
|
3,437 |
|
|
|
1,546 |
|
|
|
|
|
|
|
(652 |
) |
|
|
|
|
Derivatives not designated as a cash flow hedge: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Foreign currency contracts |
|
|
4,988 |
|
|
|
3,172 |
|
|
|
|
|
|
|
(1,050 |
) |
|
|
(66 |
) |
Interest rate swap agreements |
|
|
16,759 |
|
|
|
45,524 |
|
|
|
(31,174 |
) |
|
|
(135,171 |
) |
|
|
(387,058 |
) |
Cross currency swap agreement |
|
|
2,031 |
|
|
|
2,003 |
|
|
|
199 |
|
|
|
|
|
|
|
|
|
Foinaven embedded derivative |
|
|
|
|
|
|
3,738 |
|
|
|
|
|
|
|
(7,238 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
27,215 |
|
|
|
55,983 |
|
|
|
(30,975 |
) |
|
|
(144,111 |
) |
|
|
(387,124 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Page 16 of 36
TEEKAY CORPORATION AND SUBSIDIARIES
NOTES TO THE UNAUDITED CONSOLIDATED FINANCIAL STATEMENTS
(all tabular amounts stated in thousands of U.S. dollars, except share data)
For the periods indicated, the following table presents the effective portion of gains (losses) on
foreign currency contracts designated and qualifying as cash flow hedges that was recognized in (1)
accumulated other comprehensive income (or AOCI), (2) recorded in accumulated other comprehensive
income (loss) during the term of the hedging relationship and reclassified to earnings, and (3) the
ineffective portion of gains (losses) on derivative instruments designated and qualifying as cash
flow hedges.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended March 31, 2011 |
|
Three Months Ended March 31, 2010 |
|
Balance |
|
|
|
|
|
|
|
|
|
|
|
|
Balance |
|
|
|
|
Sheet |
|
|
|
|
|
|
|
|
|
|
|
|
Sheet |
|
|
|
|
(AOCI) |
|
|
Statement of Income (Loss) |
|
(AOCI) |
|
|
Statement of Income (Loss) |
|
Effective |
|
|
Effective |
|
|
Ineffective |
|
|
|
|
Effective |
|
|
Effective |
|
|
Ineffective |
|
|
|
|
|
Portion |
|
|
Portion |
|
|
Portion |
|
|
|
|
Portion |
|
|
Portion |
|
|
Portion |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5,498 |
|
|
|
152 |
|
|
|
(179 |
) |
|
Vessel operating expenses |
|
|
(3,940 |
) |
|
|
(374 |
) |
|
|
(2,082 |
) |
|
|
Vessel operating expenses |
|
|
|
|
|
|
833 |
|
|
|
95 |
|
|
General and administrative expenses |
|
|
|
|
|
|
(639 |
) |
|
|
(892 |
) |
|
|
General and administrative expenses |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5,498 |
|
|
|
985 |
|
|
|
(84 |
) |
|
|
|
|
(3,940 |
) |
|
|
(1,013 |
) |
|
|
(2,974 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Realized and unrealized (losses) gains from derivative instruments that are not designated
for accounting purposes as cash flow hedges are recognized in earnings and reported in realized and
unrealized (losses) gains on non-designated derivatives in the consolidated statements of income
(loss). The effect of the (loss) gain on derivatives not designated as hedging instruments in the
statements of income (loss) are as follows:
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended March 31, |
|
|
|
2011 |
|
|
2010 |
|
|
|
$ |
|
|
$ |
|
Realized (losses) gains relating to: |
|
|
|
|
|
|
|
|
Interest rate swap agreements |
|
|
(33,997 |
) |
|
|
(38,586 |
) |
Interest rate swap agreement amendments |
|
|
(92,672 |
) |
|
|
|
|
Foreign currency forward contracts |
|
|
1,325 |
|
|
|
(323 |
) |
Forward freight agreements and bunker fuel swap contracts |
|
|
49 |
|
|
|
(2,149 |
) |
|
|
|
|
|
|
|
|
|
|
(125,295 |
) |
|
|
(41,058 |
) |
|
|
|
|
|
|
|
Unrealized gains (losses) relating to: |
|
|
|
|
|
|
|
|
Interest rate swap agreements |
|
|
141,859 |
|
|
|
(45,806 |
) |
Foreign currency forward contracts |
|
|
6,707 |
|
|
|
(3,217 |
) |
Forward freight agreements and bunker fuel swap contracts |
|
|
(7 |
) |
|
|
3,145 |
|
Foinaven embedded derivative |
|
|
(7 |
) |
|
|
(911 |
) |
|
|
|
|
|
|
|
|
|
|
148,552 |
|
|
|
(46,789 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total realized and unrealized gains (losses) on non-designated derivative instruments |
|
|
23,257 |
|
|
|
(87,847 |
) |
|
|
|
|
|
|
|
Realized and unrealized gains (losses) of the cross currency swap are recognized in earnings and
reported in foreign exchange gain (loss) in the consolidated statements of income (loss). For the
three months ended March 31, 2011, an unrealized gain of $6.2 million and a realized gain of $0.7
million have been recognized in the consolidated statements of income (loss).
In January and February 2011, the Company paid $92.7 million to the counterparties of five interest
rate swap agreements, with notional amounts totaling $665.1 million, in consideration for amending
the terms of such agreements to reduce the weighted average fixed interest rate from 5.1% to 2.5%.
The amount paid was reflected in the Companys 2011 consolidated financial statements as a realized
loss on non-designated derivative instruments and a reduction in the outstanding liability of the
interest rate swaps, which are accounted for at fair value.
As at March 31, 2011, the Companys accumulated other comprehensive loss included $5.7 million of
unrealized gains on foreign currency forward contracts designated as cash flow hedges. As at March
31, 2011, the Company estimated, based on then current foreign exchange rates, that it would
reclassify approximately $4.3 million of net gains on foreign currency forward contracts from
accumulated other comprehensive loss to earnings during the next 12 months.
The Company is exposed to credit loss to the extent the fair value represents an asset in the event
of non-performance by the counterparties to the foreign currency forward contracts, and cross
currency and interest rate swap agreements; however, the Company does not anticipate
non-performance by any of the counterparties. In order to minimize counterparty risk, the Company
only enters into derivative transactions with counterparties that are rated A- or better by
Standard & Poors or A3 or better by Moodys at the time of the transaction. In addition, to the
extent possible and practical, interest rate swaps are entered into with different counterparties
to reduce concentration risk.
Page 17 of 36
TEEKAY CORPORATION AND SUBSIDIARIES
NOTES TO THE UNAUDITED CONSOLIDATED FINANCIAL STATEMENTS
(all tabular amounts stated in thousands of U.S. dollars, except share data)
16. Income Tax (Expense) Recovery
The components of the provision for income tax (expense) recovery are as follows:
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended March 31, |
|
|
|
2011 |
|
|
2010 |
|
|
|
$ |
|
|
$ |
|
Current |
|
|
(395 |
) |
|
|
(1,643 |
) |
Deferred |
|
|
(416 |
) |
|
|
8,950 |
|
|
|
|
|
|
|
|
Income tax (expense) recovery |
|
|
(811 |
) |
|
|
7,307 |
|
|
|
|
|
|
|
|
The following is a roll-forward of the Companys unrecognized tax benefits, recorded in other
long-term liabilities, from January 1, 2011 to March 31, 2011:
|
|
|
|
|
Balance of unrecognized tax benefits as at January 1, 2011 |
|
$ |
45,302 |
|
Increase for positions taken in prior years |
|
|
767 |
|
Increase for positions related to the current period |
|
|
1,039 |
|
Decrease related to statute of limitations |
|
|
(3,408 |
) |
|
|
|
|
Balance of unrecognized tax benefits as at March 31, 2011 |
|
$ |
43,700 |
|
|
|
|
|
The majority of the increase for positions for the three months ended March 31, 2011 relates to
potential tax on freight income.
The Company does not presently anticipate such uncertain tax positions will significantly increase
or decrease in the next 12 months; however, actual developments could differ from those currently
expected.
17. Loss Per Share
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended March 31, |
|
|
|
2011 |
|
|
2010 |
|
|
|
$ |
|
|
$ |
|
|
|
|
|
|
|
|
|
|
Net loss attributable to stockholders of Teekay Corporation |
|
|
(29,657 |
) |
|
|
(14,002 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Weighted average number of common stock and common stock equivalents outstanding |
|
|
71,946,997 |
|
|
|
72,788,591 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Loss per common share: |
|
|
|
|
|
|
|
|
- Basic |
|
|
(0.41 |
) |
|
|
(0.19 |
) |
- Diluted |
|
|
(0.41 |
) |
|
|
(0.19 |
) |
The anti-dilutive effect attributable to outstanding stock-based awards is excluded from the
calculation of diluted (loss) earnings per common share. For the three months ended March 31, 2011
and 2010, the anti-dilutive effect attributable to outstanding stock-based awards was 5.9 million
shares and 6.5 million shares, respectively.
18. Supplemental Cash Flow Information
In February 2010, an unrelated party contributed a shuttle tanker with a value of $35.0 million to
a subsidiary of the Company in exchange for a 33% equity interest in the subsidiary as described in
Note 10(d) to these unaudited consolidated financial statements. This contribution has been treated
as a non-cash transaction in the Companys consolidated statement of cash flows for the three
months ended March 31, 2010.
19. Subsequent Events
In April 2011, Teekay LNG completed a public offering of 4.3 million common units (including 0.6
million common units issued upon the partial exercise of the underwriters overallotment option) at
a price of $38.88 per unit, for gross proceeds (including the general partners proportionate
capital contribution) of approximately $168.7 million. As a result, Teekays ownership of Teekay
LNG was reduced to 43.6% (including the Companys 2% general partner interest). Teekay maintains
control of Teekay LNG by virtue of its control of the general partner and will continue to
consolidate the subsidiary.
Page 18 of 36
TEEKAY CORPORATION AND SUBSIDIARIES
MARCH 31, 2011
PART I FINANCIAL INFORMATION
|
|
|
ITEM 2 - |
|
MANAGEMENTS DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS |
The following Managements Discussion and Analysis of Financial Condition and Results of Operations
should be read in conjunction with the consolidated financial statements and accompanying notes
contained in Item 1 Financial Statements of this Report on Form 6-K and with our audited
consolidated financial statements contained in Item 17 Financial Statements and Managements
Discussion and Analysis of Financial Condition and Results of Operations in Item 5 Operating
and Financial Review and Prospects of our Annual Report on Form 20-F for the year ended December
31, 2010.
SIGNIFICANT DEVELOPMENTS IN EARLY 2011
Public Offering by Teekay Tankers
During February 2011, our publicly-traded subsidiary Teekay Tankers Ltd. (NYSE: TNK) (or Teekay
Tankers) completed a public offering of 9.9 million common shares of its Class A Common Stock
(including 1.3 million common shares issued upon the exercise of the underwriters overallotment
option) at a price of $11.33 per share, for gross proceeds of approximately $112.1 million. Teekay
Tankers used the net offering proceeds to repay a portion of its outstanding debt under its
revolving credit facility. As a result of the transaction, our ownership of Teekay Tankers was
reduced to 26.0% as of March 31, 2011. We maintain voting control of Teekay Tankers through our
ownership of shares of Class A and Class B Common Stock and will continue to consolidate this
subsidiary.
First Priority Ship Mortgage Loan
In February 2011, we made a $70 million loan to a third party ship-owner. The loan bears interest
at an interest rate of 9% per annum and has a fixed term of three years, repayable in full on
maturity and is collateralized by a first-priority mortgage on one 2011-built VLCC.
Sale of Remaining Interest in OPCO to Teekay Offshore
In March 2011, we sold our remaining 49% interest in Teekay Offshore Operating L.P. (or OPCO), a
subsidiary of our publicly-traded subsidiary Teekay Offshore Partners L.P. (NYSE: TOO) (or Teekay
Offshore), to Teekay Offshore for a combination of $175 million in cash (less $15 million in
distributions made by OPCO to us between December 31, 2010 and the date of acquisition) and 7.6
million newly issued Teekay Offshore common units issued to us in a private placement. In addition,
Teekay Offshore issued to its general partner a sufficient general partner interest in order for it
to maintain its 2% general partner interest. The sale increased Teekay Offshores ownership of OPCO
from 51% to 100%. As a result of the transaction, our ownership of Teekay Offshore was increased to
36.9% (including our 2% general partner interest) as of March 31, 2011. We maintain control of
Teekay Offshore by virtue of our control of the general partner and will continue to consolidate
this subsidiary.
Public Offering by Teekay LNG
In April 2011, our publicly-traded subsidiary Teekay LNG Partners L.P. (NYSE: TGP) (or Teekay LNG)
completed a public offering of 4.3 million common units (including 0.6 million common units issued
upon the partial exercise of the underwriters overallotment option) at a price of $38.88 per unit,
for gross proceeds (including the general partners proportionate capital contribution) of
approximately $168.7 million. Teekay LNG expects to use the net offering proceeds to fund the
equity purchase price of its acquisition from Teekay of a 33% interest in four newbuilding LNG
carriers. These four liquefied natural gas (or LNG) carriers will commence operations under
time-charter to the Angola LNG Project (discussed below) upon each vessels respective delivery,
scheduled between late 2011 and early 2012. Pending delivery of the vessels, all interim and
remaining net proceeds from the offering will be used to repay amounts outstanding on one of Teekay
LNGs revolving credit facilities. As a result of the public offering, our ownership of Teekay LNG
was reduced to 43.6% (including our 2% general partner interest). We maintain control of Teekay LNG
by virtue of our control of the general partner and will continue to consolidate this subsidiary.
Recent Offshore Business Developments
We recently entered into a joint venture agreement with Odebrecht Oil & Gas S.A. (or Odebrecht) to
jointly pursue floating, production, storage and offloading (or FPSO) projects in Brazil. We are
currently working with Odebrecht on potential project opportunities and have signed an agreement
with Odebrecht to be a 50% partner in the Tiro Sidon FPSO project. Odebrecht is a well-established
Brazil-based company that operates globally in the engineering and construction, petrochemical,
bio-energy, energy, oil and gas, real estate and environmental engineering sectors.
In addition, we have signed a letter of intent with a major oil and gas company to provide a new
harsh weather FPSO unit which will operate in the North Sea. Over the past several months, we have
been involved in the front-end engineering and design study for this project and are currently
working towards finalizing a contract with the customer. In connection with this project, we
recently signed a conditional contract with a ship yard to construct a newbuilding FPSO unit.
Page 19 of 36
OTHER SIGNIFICANT PROJECTS
Angola LNG Project
We have a 33% interest in a joint venture that will charter four newbuilding 160,400-cubic meter
LNG carriers for a period of 20 years to the Angola LNG Project, which is being developed by
subsidiaries of Chevron Corporation, Sociedade Nacional de Combustiveis de Angola EP, BP Plc, Total
S.A., and Eni SpA. The vessels will be chartered at fixed rates, with inflation adjustments,
commencing in 2011. Mitsui & Co., Ltd. and NYK Bulkship (Europe) Ltd. have 34% and 33% interests in
the joint venture, respectively. In accordance with existing agreements, we were
required to offer to sell to Teekay LNG our 33% interest in these vessels and related charter
contracts at our fully built-up cost, no later than 180 days before the scheduled delivery dates of
the vessels. Deliveries of the vessels are scheduled between August 2011 and January 2012. In
February 2011, we offered to sell to Teekay LNG our 33% ownership interest in these vessels and
related charter contracts. In March 2011, the transaction was approved by the Board of Directors of
Teekay LNGs general partner and by its Conflicts Committee. Please read Item 1 Financial
Statements: Note 10(b) Commitments and Contingencies Joint Ventures.
RESULTS OF OPERATIONS
We use a variety of financial and operational terms and concepts when analyzing our results of
operations. In addition, you should consider certain factors when evaluating our historical
financial performance and assessing our future prospects. These items can be found in Item 5
Operating and Financial Review and Prospects in our Annual Report on Form 20-F for the year ended
December 31, 2010.
In accordance with generally accepted accounting principles in the United States (or GAAP), we
report gross revenues in our income statements and include voyage expenses among our operating
expenses. However, ship-owners base economic decisions regarding the deployment of their vessels
upon anticipated time-charter equivalent (or TCE) rates and industry analysts typically measure
bulk shipping freight rates in terms of TCE rates. This is because under time-charter contracts and
FPSO service contracts the customer usually pays the voyage expenses, while under voyage charters
and contracts of affreightment the ship-owner usually pays the voyage expenses, which typically are
added to the hire rate at an approximate cost. Accordingly, the discussion of revenue below focuses
on net revenues and TCE rates of our four reportable segments where applicable.
We manage our business and analyze and report our results of operations on the basis of four
reportable segments: the shuttle tanker and FSO segment, the FPSO segment, the liquefied gas
segment, and the conventional tanker segment. In order to provide investors with additional
information about our conventional tanker segment, we have divided this operating segment into the
fixed-rate tanker sub-segment and the spot tanker sub-segment. Please read Item 1 Financial
Statements: Note 3 Segment Reporting.
Shuttle Tanker and FSO Segment
Our shuttle tanker and floating storage and offtake (or FSO) segment (which includes our Teekay
Navion Shuttle Tankers and Offshore business unit) includes our shuttle tankers and FSO units. We
use these vessels to provide transportation and storage services to oil companies operating
offshore oil field installations, primarily in the North Sea and Brazil. Our shuttle tankers in
this segment service the conventional spot market from time to time.
The following table presents our shuttle tanker and FSO segments operating results and compares
its net revenues (which is a non-GAAP financial measure) to revenues, the most directly comparable
GAAP financial measure.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended |
|
|
|
|
|
|
March 31, |
|
|
|
|
(in thousands of U.S. dollars, except calendar-ship-days and percentages) |
|
2011 |
|
|
2010 |
|
|
% Change |
|
|
|
|
Revenues |
|
|
151,212 |
|
|
|
155,948 |
|
|
|
(3.0 |
) |
Voyage expenses |
|
|
19,329 |
|
|
|
29,303 |
|
|
|
(34.0 |
) |
|
|
|
|
|
|
|
|
|
|
|
Net revenues |
|
|
131,883 |
|
|
|
126,645 |
|
|
|
4.1 |
|
Vessel operating expenses |
|
|
53,614 |
|
|
|
43,321 |
|
|
|
23.8 |
|
Time-charter hire expense |
|
|
19,627 |
|
|
|
25,038 |
|
|
|
(21.6 |
) |
Depreciation and amortization |
|
|
30,619 |
|
|
|
30,559 |
|
|
|
0.2 |
|
General and administrative (1) |
|
|
18,306 |
|
|
|
12,145 |
|
|
|
50.7 |
|
Loss on sale of vessels and equipment, net of write-downs of vessels and equipment |
|
|
171 |
|
|
|
|
|
|
|
|
|
Restructuring charges |
|
|
3,920 |
|
|
|
325 |
|
|
|
1,106.2 |
|
|
|
|
|
|
|
|
|
|
|
|
Income from vessel operations |
|
|
5,626 |
|
|
|
15,257 |
|
|
|
(63.1 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Calendar-Ship-Days |
|
|
|
|
|
|
|
|
|
|
|
|
Owned Vessels |
|
|
2,888 |
|
|
|
2,790 |
|
|
|
3.5 |
|
Chartered-in Vessels |
|
|
541 |
|
|
|
676 |
|
|
|
(20.0 |
) |
|
|
|
|
|
|
|
|
|
|
|
Total |
|
|
3,429 |
|
|
|
3,466 |
|
|
|
(1.1 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(1) |
|
Includes direct general and administrative expenses and indirect general and administrative
expenses allocated to the shuttle tanker and FSO segment based on estimated use of corporate
resources. For further discussion, please read Other Operating Results General and
Administrative Expenses. |
The average fleet size of our shuttle tanker and FSO segment (including vessels chartered-in), as
measured by calendar-ship-days, decreased for the three months ended March 31, 2011, compared to
the same period last year, due to a decrease in the number of chartered-in shuttle tankers and the
sale of an FSO unit in March 2011, partially offset by an increase in calendar days from the
acquisition of a shuttle tanker in February 2010 and the delivery of two newbuilding shuttle
tankers, the Amundsen Spirit and the Nansen Spirit, in July 2010 and October 2010. The shuttle
tanker and FSO segment had two shuttle tankers under construction as at March 31, 2011, of which
one shuttle was delivered in May 2011 and other is scheduled for delivery in July 2011.
Page 20 of 36
Net Revenues. Net revenues increased for the three months ended March 31, 2011, compared to
the same period last year, primarily due to:
|
|
|
an increase of $10.5 million due to delivery of the two shuttle tankers in July 2010 and
October 2010; and |
|
|
|
|
an increase of $8.7 million due to a net increase in rates on certain contracts of
affreightment, bareboat and time-charter contracts as provided for in existing contracts as
well as due to entering into new contracts during 2010; |
partially offset by
|
|
|
a decrease of $13.6 million primarily due to fewer revenue days from our shuttle tankers
due to declining oil production at mature oil fields in the North Sea and a decrease in
revenue days in the conventional spot market from lower demand for conventional crude
transportation. |
Vessel Operating Expenses. Vessel operating expenses increased for the three months ended
March 31, 2011, compared to the same period last year, primarily due to:
|
|
|
an increase of $3.5 million due to delivery of the two shuttle tankers in July 2010 and
October 2010; |
|
|
|
an increase of $3.5 million due primarily to increased crewing costs from planned
increases in crew wages; and |
|
|
|
an increase of $3.3 million due to an increase in the number of vessels drydocked, and
costs related to services and spares during 2011. Certain repair and maintenance items are
more efficient to complete while a vessel is in drydock; consequently, repair and
maintenance costs will typically increase in periods when there is an increase in the
number of vessels drydocked. |
Time-Charter Hire Expense. Time-charter hire expense decreased for the three months ended
March 31, 2011, compared to the same period last year, primarily due to the redelivery of two
chartered-in vessels to their owners in February 2010 and November 2010.
Restructuring Charges. Restructuring charges for the three months ended March 31, 2011,
primarily relate to the sale of an FSO unit, the Karratha Spirit, and the termination of the
time-charter for a shuttle tanker, the Basker Spirit.
FPSO Segment
Our FPSO segment (which includes our Teekay Petrojarl business unit) includes our FPSO units and
other vessels used to service our FPSO contracts. We use these units and vessels to provide
transportation, production, processing and storage services to oil companies operating offshore oil
field installations. These services are typically provided under long-term fixed-rate time-charter
contracts, contracts of affreightment or FPSO service contracts. Historically, the utilization of
FPSO units and other vessels in the North Sea is higher in the winter months, as favorable weather
conditions in the summer months provide opportunities for repairs and maintenance to our offshore
oil platforms, which generally reduce oil production.
The following table presents our FPSO segments operating results:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended |
|
|
|
|
|
|
March 31, |
|
|
|
|
(in thousands of U.S. dollars, except calendar-ship-days and percentages) |
|
2011 |
|
|
2010 |
|
|
% Change |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Revenues |
|
|
104,618 |
|
|
|
131,998 |
|
|
|
(20.7 |
) |
Vessel operating expenses |
|
|
52,722 |
|
|
|
47,965 |
|
|
|
9.9 |
|
Depreciation and amortization |
|
|
23,731 |
|
|
|
23,748 |
|
|
|
(0.1 |
) |
General and administrative (1) |
|
|
14,723 |
|
|
|
8,826 |
|
|
|
66.8 |
|
|
|
|
|
|
|
|
|
|
|
|
Income from vessel operations |
|
|
13,442 |
|
|
|
51,459 |
|
|
|
(73.9 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Calendar-Ship-Days |
|
|
|
|
|
|
|
|
|
|
|
|
Owned Vessels |
|
|
720 |
|
|
|
720 |
|
|
|
|
|
|
|
|
(1) |
|
Includes direct general and administrative expenses and indirect general and administrative
expenses allocated to the FPSO segment based on estimated use of corporate resources. For
further discussion, please read Other Operating Results General and Administrative
Expenses. |
Revenues. Revenues decreased for the three months ended March 31, 2011, compared to the
same period last year, primarily due to:
|
|
|
a decrease of $30.0 million for payments received under the amended operating contract
for our Petrojarl Foinaven FPSO unit related to operations in previous years recognized in
the three months ended March 31, 2010; and |
|
|
|
a decrease of $2.3 million from the decrease in amortization of contract value
liabilities relating to FPSO service contracts (as discussed below) due to extensions of
the duration of the firm periods of certain contracts; |
partially offset by
|
|
|
an increase of $3.5 million primarily due to a one-time accrual in the three months
ended March 31, 2011 relating to an agreed adjustment to revenue for services previously
rendered to the charterer of the Cidade de Rio das Ostras FPSO unit (the Rio das Ostras
FPSO). |
As part of our acquisition of Teekay Petrojarl ASA (or Teekay Petrojarl), we assumed certain FPSO
service contracts that had terms that were less favorable than prevailing market terms at the time
of acquisition. This contract value liability, which was initially recognized on the date of
acquisition, is being amortized to revenue over the remaining firm period of the current FPSO
contracts on a weighted basis, based on the
projected revenue to be earned under the contracts. The amount of amortization relating to these
contracts included in revenue for the three months ended March 31, 2011 was $10.8 million (2010
$13.1 million). The decrease for the three months ended March 31, 2011, compared to 2010, was due
to increases in the amortization periods resulting from operating contract amendments and changes
to expected contract durations for two of our FPSO units.
Page 21 of 36
Vessel Operating Expenses. Vessel operating expenses increased during the three months
ended March 31, 2011, compared to the same period last year, primarily due to:
|
|
|
an increase of $2.0 million due to increased repairs compared to the same period last
year related to work performed on the Rio das Ostras FPSO unit while on yard stay; and |
|
|
|
an increase of $1.4 million due to increased crewing costs compared to the same period
last year related to planned crew wage increases. |
Liquefied Gas Segment
Our liquefied gas segment (which includes our Teekay Gas Services business unit) consists of LNG
and liquefied petroleum gas (or LPG) carriers subject to long-term, fixed-rate time-charter
contracts. The following table presents our liquefied gas segments operating results and compares
its net revenues (which is a non-GAAP financial measure) to revenues, the most directly comparable
GAAP financial measure.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended |
|
|
|
|
|
|
March 31, |
|
|
|
|
(in thousands of U.S. dollars, except calendar-ship-days and percentages) |
|
2011 |
|
|
2010 |
|
|
% Change |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Revenues |
|
|
64,633 |
|
|
|
62,534 |
|
|
|
3.4 |
|
Voyage expenses |
|
|
49 |
|
|
|
(27 |
) |
|
|
(281.5 |
) |
|
|
|
|
|
|
|
|
|
|
|
Net revenues |
|
|
64,584 |
|
|
|
62,561 |
|
|
|
3.2 |
|
Vessel operating expenses |
|
|
11,077 |
|
|
|
11,370 |
|
|
|
(2.6 |
) |
Depreciation and amortization |
|
|
14,856 |
|
|
|
15,527 |
|
|
|
(4.3 |
) |
General and administrative (1) |
|
|
6,605 |
|
|
|
4,771 |
|
|
|
38.4 |
|
Restructuring charges |
|
|
129 |
|
|
|
119 |
|
|
|
8.4 |
|
|
|
|
|
|
|
|
|
|
|
|
Income from vessel operations |
|
|
31,917 |
|
|
|
30,774 |
|
|
|
3.7 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Calendar-Ship-Days |
|
|
|
|
|
|
|
|
|
|
|
|
Owned Vessels and Vessels under Direct Financing Lease |
|
|
1,170 |
|
|
|
1,260 |
|
|
|
(7.1 |
) |
|
|
|
(1) |
|
Includes direct general and administrative expenses and indirect general and administrative
expenses allocated to the liquefied gas segment based on estimated use of corporate resources.
For further discussion, please read Other Operating Results General and Administrative
Expenses. |
The decrease in the average fleet size of our liquefied gas segment, as measured by
calendar-ship-days, was primarily due to the sale of the Dania Spirit LPG carrier in November 2010.
At March 31, 2011, we had one LPG carrier and two multi-gas carriers under construction, which are
scheduled for delivery in 2011. In addition, we have a 33% interest in four LNG carriers under
construction that are scheduled for delivery between August 2011 and January 2012, and will be
accounted for under the equity basis. Upon delivery, all of these vessels will commence operation
under long-term, fixed-rate time-charters. Please read Item 1 Financial Statements: Note 10(a)
Commitments and Contingencies Vessels Under Construction and Note 10(b) Commitments and
Contingencies Joint Ventures.
During the three months ended March 31, 2010 one of our vessels, the Arctic Spirit was offhire for
90 days, of which approximately 22 days were related to a scheduled drydocking, with the remainder
due to the Arctic Spirit being offhire with no charter contract. The Arctic Spirit commenced a
short-term voyage charter contract during the fourth quarter of 2010.
Net Revenues. Net revenues increased for the three months ended March 31, 2011, compared to
the same period last year, primarily due to:
|
|
|
an increase of $3.1 million due to the increased time-charter rate on the Polar Spirit
and the Arctic Spirit being offhire during the three months ended March 31, 2010 as
discussed above; |
partially offset by
|
|
|
a decrease of $1.2 million due to the sale of the Dania Spirit LPG carrier. |
Vessel Operating Expenses. Vessel operating expenses decreased for the three months ended
March 31, 2011, compared to the same period last year, primarily due to:
|
|
|
a decrease of $0.8 million due to the sale of the Dania Spirit LPG carrier; and |
|
|
|
a decrease of $0.2 million due to reduced insurance premiums on our vessels; |
partially offset by
|
|
|
an increase of $0.6 million due to timing of services and an increase in manning levels
for certain of our LNG carriers. |
Page 22 of 36
Depreciation and Amortization. Depreciation and amortization expense decreased for the
three months ended March 31, 2011, compared to the same period last year, primarily due to:
|
|
|
a decrease of $0.5 million due to certain capitalized drydocking expenditures being
fully amortized during 2010; and |
|
|
|
a decrease of $0.3 million from the sale of the Dania Spirit LPG carrier. |
Conventional Tanker Segment
Our conventional tanker segment consists of conventional crude oil and product tankers that are:
subject to long-term, fixed-rate time-charter contracts, which have an original term of one year or
more; operate in the spot tanker market; or are subject to time-charters or contracts of
affreightment that are priced on a spot-market basis or are short-term, fixed-rate contracts, which
have an original term of less than one year.
a) Fixed-Rate Tanker Sub-Segment
Our fixed-rate tanker sub-segment, a subset of our conventional tanker segment (which includes our
Teekay Tankers Services business unit), includes conventional crude oil and product tankers on
fixed-rate time charters with an original duration of more than one year. In addition, we have a
50% interest in a VLCC under construction that is scheduled for delivery in 2013, which will be
accounted for under the equity basis. Upon delivery, this vessel will commence operation under a
time-charter for a term of five years. Please read Item 1 Financial Statements: Note 10(b)
Commitments and Contingencies Joint Ventures.
The following table presents our fixed-rate tanker sub-segments operating results and compares its
net revenues (which is a non-GAAP financial measure) to revenues, the most directly comparable GAAP
financial measure.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended |
|
|
|
|
|
|
March 31, |
|
|
|
|
(in thousands of U.S. dollars, except calendar-ship-days and percentages) |
|
2011 |
|
|
2010 |
|
|
% Change |
|
|
|
|
Revenues |
|
|
87,987 |
|
|
|
94,032 |
|
|
|
(6.4 |
) |
Voyage expenses |
|
|
1,161 |
|
|
|
696 |
|
|
|
66.8 |
|
|
|
|
|
|
|
|
|
|
|
|
Net revenues |
|
|
86,826 |
|
|
|
93,336 |
|
|
|
(7.0 |
) |
Vessel operating expenses |
|
|
25,843 |
|
|
|
25,997 |
|
|
|
(0.6 |
) |
Time-charter hire expense |
|
|
7,395 |
|
|
|
15,139 |
|
|
|
(51.2 |
) |
Depreciation and amortization |
|
|
21,909 |
|
|
|
19,816 |
|
|
|
10.6 |
|
General and administrative (1) |
|
|
15,626 |
|
|
|
8,979 |
|
|
|
74.0 |
|
Loss on sale of vessels and equipment, net of write-downs of vessels and equipment |
|
|
133 |
|
|
|
765 |
|
|
|
(82.6 |
) |
Restructuring charges |
|
|
1,078 |
|
|
|
106 |
|
|
|
917.0 |
|
|
|
|
|
|
|
|
|
|
|
|
Income from vessel operations |
|
|
14,842 |
|
|
|
22,534 |
|
|
|
(34.1 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Calendar-Ship-Days |
|
|
|
|
|
|
|
|
|
|
|
|
Owned Vessels |
|
|
2,939 |
|
|
|
2,866 |
|
|
|
2.5 |
|
Chartered-in Vessels |
|
|
405 |
|
|
|
711 |
|
|
|
(43.1 |
) |
|
|
|
|
|
|
|
|
|
|
|
Total |
|
|
3,343 |
|
|
|
3,577 |
|
|
|
(6.5 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(1) |
|
Includes direct general and administrative expenses and indirect general and administrative
expenses allocated to the fixed-rate tanker sub-segment based on estimated use of corporate
resources. For further discussion, please read Other Operating Results General and
Administrative Expenses. |
The average fleet size of our fixed-rate tanker sub-segment (including vessels chartered-in), as
measured by calendar-ship-days, decreased for the three months ended March 31, 2011, compared to
the same period last year, primarily due to:
|
|
|
the transfer of two Aframax tankers, on a net basis, to the spot tanker sub-segment in
2010 and early 2011 upon commencement of charters, which have an original term of less than
one year; |
|
|
|
the sale of one product tanker in August 2010; |
|
|
|
the transfer of one in-chartered VLCC to the spot tanker sub-segment in January 2011;
and |
|
|
|
an overall decrease in the number of in-chartered vessels days; |
partially offset by
|
|
|
the transfer of one Suezmax tanker from the spot tanker sub-segment in April 2010. |
The collective impact from the above noted fleet changes are referred to below as the Net Fleet
Reductions.
The Aframax transfers, discussed above, consist of the transfer of five owned vessels from the spot
tanker sub-segment, and the transfer of three owned vessels and four in-chartered vessels to the
spot tanker sub-segment. These transactions resulted in a decrease to the fixed tanker
sub-segments net revenues, time-charter hire expense, vessel operating expenses, and depreciation
and amortization.
Page 23 of 36
Net Revenues. Net revenues decreased for the three months ended March 31, 2011,
compared to the same period last year, primarily due to:
|
|
|
a decrease of $4.1 million from the Net Fleet Reductions; |
|
|
|
a decrease of $3.2 million from the transfer of an in-chartered vessel to the spot
tanker sub-segment in April 2010; and |
|
|
|
a decrease of $3.0 million from the sale of a product tanker in August 2010; |
partially offset by
|
|
|
an increase of $3.4 million resulting from interest income from our investment in term
loans, as discussed below; and |
|
|
|
an increase of $0.4 million due to adjustments to the daily charter rates based on
inflation and increases from rising interest rates in accordance with the time-charter
contracts for five Suezmax tankers (however, under the terms of these capital leases, we
had corresponding increases in our lease payments, which are reflected as increases to
interest expense; therefore, these and future similar interest rate adjustments do not
affect our cash flow or net income (loss)). |
We earned interest income of $3.4 million for the three months ended March 31, 2011 from our
investment in three term loans which totaled $186 million as at March 31, 2011 and which are
collateralized by first priority mortgages on three VLCCs. Please read Item 1 Financial
Statements: Note 4 Investment in Term Loans.
Vessel Operating Expenses. Vessel operating expenses decreased for the three month ended
March 31, 2011, compared to the same period last year, primarily due to:
|
|
|
a decrease of $2.1 million from the sale of a product tanker in August 2010; and |
|
|
|
a decrease of $0.3 million from the Net Fleet Reductions; |
partially offset by
|
|
|
an increase of $2.2 million relating to higher crewing costs, timing of repairs and
maintenance costs and vessel damage claims. |
Time-Charter Hire Expense. Time-charter hire expense decreased for the three months ended
March 31, 2011, compared to the same period last year, primarily due to the transfer of an
in-chartered VLCC to the spot tanker sub-segment and a decrease in the number of in-chartered
vessel days as vessels were redelivered to their owners upon expiration of in-charter contracts.
Depreciation and Amortization. Depreciation and amortization expense increased for the
three months ended March 31, 2011, compared to the same period last year, primarily due to:
|
|
|
an increase of $1.6 million from the Net Fleet Reductions; and |
|
|
|
an increase of $0.5 million from an increase in capitalized drydocking expenditures
incurred during the second half of 2010. |
b) Spot Tanker Sub-Segment
Our spot tanker sub-segment, a subset of our conventional tanker segment (which includes our Teekay
Tankers Services business unit), consists of conventional crude oil tankers and product carriers
operating on the spot tanker market or subject to time-charters or contracts of affreightment that
are priced on a spot-market basis or are short-term, fixed-rate contracts. We consider contracts
that have an original term of less than one year in duration to be short-term. Our conventional
Aframax, Suezmax, and large and medium product tankers are among the vessels included in the spot
tanker sub-segment.
Our spot tanker market operations contribute to the volatility of our revenues, cash flow from
operations and net income (loss). Historically, the tanker industry has been cyclical, experiencing
volatility in profitability and asset values resulting from changes in the supply of, and demand
for, vessel capacity. In addition, spot tanker markets historically have exhibited seasonal
variations in charter rates. Spot tanker markets are typically stronger in the winter months as a
result of increased oil consumption in the Northern Hemisphere and unpredictable weather patterns
that tend to disrupt vessel scheduling.
Page 24 of 36
The following table presents our spot tanker sub-segments operating results and compares its net
revenues (which is a non-GAAP financial measure) to revenues, the most directly comparable GAAP
financial measure:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended |
|
|
|
|
|
|
March 31, |
|
|
|
|
(in thousands of U.S. dollars, except calendar-ship-days and percentages) |
|
2011 |
|
|
2010 |
|
|
% Change |
|
|
|
|
Revenues |
|
|
79,574 |
|
|
|
128,363 |
|
|
|
(38.0 |
) |
Voyage expenses |
|
|
24,587 |
|
|
|
42,578 |
|
|
|
(42.3 |
) |
|
|
|
|
|
|
|
|
|
|
|
Net revenues |
|
|
54,987 |
|
|
|
85,785 |
|
|
|
(35.9 |
) |
Vessel operating expenses |
|
|
18,321 |
|
|
|
25,882 |
|
|
|
(29.2 |
) |
Time-charter hire expense |
|
|
36,010 |
|
|
|
39,074 |
|
|
|
(7.8 |
) |
Depreciation and amortization |
|
|
13,923 |
|
|
|
18,580 |
|
|
|
(25.1 |
) |
General and administrative (1) |
|
|
14,958 |
|
|
|
13,370 |
|
|
|
11.9 |
|
Loss (gain) on sale of vessels and equipment, net of write-downs of vessels and
equipment |
|
|
3,289 |
|
|
|
(5 |
) |
|
|
(65,880.0 |
) |
Restructuring charges |
|
|
(166 |
) |
|
|
3,233 |
|
|
|
(105.1 |
) |
|
|
|
|
|
|
|
|
|
|
|
Loss from vessel operations |
|
|
(31,348 |
) |
|
|
(14,349 |
) |
|
|
118.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Calendar-Ship-Days |
|
|
|
|
|
|
|
|
|
|
|
|
Owned Vessels |
|
|
1,921 |
|
|
|
2,288 |
|
|
|
(16.0 |
) |
Chartered-in Vessels |
|
|
1,645 |
|
|
|
1,437 |
|
|
|
(14.5 |
) |
|
|
|
|
|
|
|
|
|
|
|
Total |
|
|
3,566 |
|
|
|
3,725 |
|
|
|
(4.3 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(1) |
|
Includes direct general and administrative expenses and indirect general and administrative
expenses allocated to the spot tanker sub-segment based on estimated use of corporate
resources. For further discussion, please read Other Operating Results General and
Administrative Expenses. |
The average size of our spot tanker fleet (including vessels chartered-in), as measured by
calendar-ship-days, decreased for the three months ended March 31, 2011, compared to the same
period last year, primarily due to:
|
|
|
the sale two Aframax tankers in April 2010 and August 2010; and |
|
|
|
the transfer of one Suezmax tanker to the fixed-rate tanker sub-segment in
April 2010; |
partially offset by
|
|
|
the transfer of one in-chartered VLCC from the fixed-rate tanker sub-segment in January
2011; and |
|
|
|
the transfer of two Aframax tankers, on a net basis, from the fixed-rate tanker
sub-segment in 2010 and early 2011 |
The collective impact from the above noted fleet changes are referred to below as the Net Spot
Fleet Reductions.
Tanker Market and TCE Rates
While average crude tanker freight rates improved slightly in the first quarter of 2011, they
remained generally weak due primarily to an oversupply of vessels relative to demand. Rising bunker
costs throughout the course of the first quarter also had a negative impact on tanker earnings.
However, a number of factors led to a gradual improvement in tanker rates during the course of the
quarter. In the Atlantic, severe ice conditions in the Baltic coupled with disruption to Libyan oil
supply as a result of political unrest, led to volatility in European crude tanker rates,
particularly in February 2011. The decline in Libyan production also prompted OPEC to increase
crude oil production, adding to tanker tonne-mile demand. In the Pacific, the devastating
earthquake in Japan in March 2011 resulted in an increase in fuel and crude oil imports for power
generation, which provided support to Pacific Aframax rates in March and April 2011.
The world tanker fleet grew by 8.1 million deadweight tonnes (or mdwt), or 1.8%, during the first
quarter of 2011 compared to 5.2 mdwt, or 1.2%, in the same period last year. There has been a
notable increase in charterer discrimination against first generation double-hull tankers with a
small number of early 1990s-built vessels sold for scrap in the early part of this year. In
combination with the current weakness in spot tanker rates, the rising trend in scrap steel prices
may lead to an increase in scrapping later in 2011.
According to the International Energy Agency, global oil demand is expected to reach 89.2 million
barrels per day (or mb/d) in 2011, an increase of 1.3 mb/d, or 1.5%, from 2010 as global GDP is
projected to grow by 4.4% in 2011. Growth in global oil demand in 2011 is expected to arise
entirely from non-OECD countries, in particular China where oil demand grew by 10% year-on-year in
the first quarter of 2011.
Page 25 of 36
The following table outlines the TCE rates earned by the vessels in our spot tanker sub-segment for
the three months ended March 31, 2011 and 2010, and excludes the realized results of synthetic
time-charters (or STCs) and forward freight agreements (or FFAs), which we enter into at times as
hedges against a portion of our exposure to spot tanker market rates.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended |
|
|
|
March 31, 2011 |
|
|
March 31, 2010 |
|
|
|
Net |
|
|
|
|
|
|
TCE |
|
|
Net |
|
|
|
|
|
|
TCE |
|
|
|
Revenues |
|
|
Revenue |
|
|
Rate |
|
|
Revenues |
|
|
Revenue |
|
|
Rate |
|
Vessel Type |
|
($000s) |
|
|
Days |
|
|
$ |
|
|
($000s) |
|
|
Days |
|
|
$ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Spot Fleet (1) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Suezmax Tankers |
|
|
22,557 |
|
|
|
1,215 |
|
|
|
18,562 |
|
|
|
37,815 |
|
|
|
1,237 |
|
|
|
30,563 |
|
Aframax Tankers |
|
|
24,384 |
|
|
|
1,827 |
|
|
|
13,345 |
|
|
|
42,192 |
|
|
|
2,194 |
|
|
|
19,231 |
|
Large/Medium Product Tankers/VLCC |
|
|
7,552 |
|
|
|
499 |
|
|
|
15,144 |
|
|
|
7,122 |
|
|
|
495 |
|
|
|
14,388 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other (2) |
|
|
494 |
|
|
|
|
|
|
|
|
|
|
|
(1,344 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Totals |
|
|
54,987 |
|
|
|
3,541 |
|
|
|
15,528 |
|
|
|
85,785 |
|
|
|
3,926 |
|
|
|
21,849 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(1) |
|
Spot fleet includes short-term time-charters and fixed-rate contracts of affreightment less
than one year. |
|
(2) |
|
Includes the cost of spot in-charter vessels servicing fixed-rate contract of affreightment
cargoes, the amortization of in-process revenue contracts and the cost of fuel while offhire. |
Average spot tanker TCE rates decreased for the three months ended March 31, 2011, compared to the
same period last year. The TCE rates for the three months ended March 31, 2011 generally reflect
continued weak global oil demand caused by the global economic slowdown. Partially in response to
this global economic slowdown, we reduced our exposure to the spot tanker market through the sale
of certain vessels that were trading on the spot market, entered into fixed-rate time charters for
certain tankers that were previously trading in the spot market, and re-delivered in-chartered
vessels. This shift away from our spot tanker employment to fixed-rate employment provided
increased cash flow stability through a volatile spot tanker market.
Net Revenues. Net revenues decreased for the three months ended March 31, 2011, compared to
the same period last year, primarily due to a decrease of $32.8 million primarily from decreases in our average spot
tanker TCE rates due to the relative weakening of the spot tanker market and a decrease in
the amortization of contract value liabilities relating to certain spot tanker contracts.
Vessel Operating Expenses. Vessel operating expenses decreased for the three months ended
March 31, 2011, compared to the same period last year, primarily due to:
|
|
|
a decrease of $5.4 million from lower crewing costs due to the positive impact of
foreign currency exchange rate fluctuations, a reduction in the number of crew on some
vessels, as well as lower repairs and maintenance and consumable costs resulting from the
review and renegotiation of several key supplier contracts in the prior periods; and |
|
|
|
a decrease of $2.2 million from the Net Spot Fleet Reductions. |
Time-Charter Hire Expense. Time-charter hire expense decreased for the three months ended
March 31, 2011, compared to the same period last year, primarily due to a decrease in the
in-charter contract hire rates.
Depreciation and Amortization. Depreciation and amortization expense decreased for the
three months ended March 31, 2011, compared to the same period last year, primarily due to:
|
|
|
a decrease of $2.2 million from a decrease of amortization of certain intangible
contracts which were fully amortized in 2010; |
|
|
|
a decrease of $1.5 million from the Net Spot Fleet Reductions; and |
|
|
|
a net decrease of $0.5 million from a decrease in amortization of capitalized vessels
and equipment costs, partially offset by an increase in amortization of capitalized
drydocking expenditures. |
Loss on Sale of Vessels and Equipment, Net of Write-downs of Vessels and Equipment. Loss on
sale of vessels and equipment for the three months ended March 31, 2011, relates primarily to a
$3.4 million write-down for impairment of a 1993-built Aframax tanker to its estimated fair value,
as the vessel carrying value exceeded the estimated fair value.
Restructuring Charges. Restructuring charges of $3.2 million for the three months ended
March 31, 2010, primarily relate to costs incurred for certain vessel crew changes.
Page 26 of 36
Other Operating Results
The following table compares our other operating results for the three months ended March 31, 2011
and 2010:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended |
|
|
|
|
|
|
March 31, |
|
|
|
|
(in thousands of U.S. dollars, except percentages) |
|
2011 |
|
|
2010 |
|
|
% Change |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
General and administrative |
|
|
(70,218 |
) |
|
|
(48,091 |
) |
|
|
46.0 |
|
Interest expense |
|
|
(32,794 |
) |
|
|
(32,152 |
) |
|
|
2.0 |
|
Interest income |
|
|
2,465 |
|
|
|
4,274 |
|
|
|
(42.3 |
) |
Realized and unrealized gains (losses) on non-designated derivative instruments |
|
|
23,257 |
|
|
|
(87,847 |
) |
|
|
(126.5 |
) |
Equity income (loss) from joint ventures |
|
|
6,394 |
|
|
|
(2,666 |
) |
|
|
(339.8 |
) |
Foreign exchange (loss) gain |
|
|
(20,340 |
) |
|
|
29,026 |
|
|
|
(170.1 |
) |
Loss on notes repurchase |
|
|
|
|
|
|
(12,108 |
) |
|
|
(100.0 |
) |
Other income |
|
|
94 |
|
|
|
2,422 |
|
|
|
(96.1 |
) |
Income tax (expense) recovery |
|
|
(811 |
) |
|
|
7,307 |
|
|
|
(111.1 |
) |
General and Administrative. General and administrative expense increased to $70.2 million
for the three months ended March 31, 2011, from $48.1 million for the same period last year,
primarily due to:
|
|
|
an increase of $15.1 million in salaries and benefits due primarily to a one-time
pension expense related to the retirement of our former President and Chief Executive
Officer on March 31, 2011 and an increase in the number of shore-based employees; |
|
|
|
an increase of $9.6 million in equity-based compensation for management primarily due to
the accelerated timing of accounting recognition of certain stock awards as a result of
certain management employees meeting retirement eligibility criteria; and |
|
|
|
an increase of $0.8 million from higher personnel expenses associated with corporate
education and training, employee relocation and hiring costs and from timing of other
corporate expenses which included increased business development activity compared to 2010; |
partially offset by
|
|
|
a decrease of $2.2 million due to a favorable increase in unrealized and realized gains
on foreign currency forward contracts; and |
|
|
|
a decrease of $1.2 million from our short-term incentive program for employees and
management. |
Interest Expense. Interest expense increased to $32.8 million for the three months ended
March 31, 2011, from $32.2 million for the same period last year, primarily due to:
|
|
|
an increase of $0.6 million due to an increase of EURIBOR rates relating our
Euro-denominated debt and from declining interest rates on our five Suezmax tanker capital
lease obligations; and |
|
|
|
an increase of $0.4 million primarily due to the effect of the January 2010 public
offering of our 8.5% senior unsecured notes due January 2020, with a principal amount of
$450 million, partially offset by the repurchase of a majority of our 8.875% senior notes
due July 2011; |
partially offset by
|
|
|
a decrease of $0.4 million from the scheduled loan payments on the LNG carrier, the
Catalunya Spirit, and scheduled capital lease repayments on the LNG carrier, the Madrid
Spirit (the Madrid Spirit is financed pursuant to a Spanish tax lease arrangement, under
which we borrowed under a term loan and deposited the proceeds into a restricted cash
account and entered into a capital lease for the vessel; as a result, this decrease in
interest expense from the capital lease is offset by a corresponding decrease in the
interest income from restricted cash). |
The debt repayments under long-term revolving credit facilities for the three months ended March
31, 2011 were primarily funded with net proceeds from the issuance of equity securities by our
publicly-listed subsidiaries and from the sale of assets to third parties. When one of our
publicly-listed subsidiaries acquires an asset from us, a significant portion of the acquisition
typically has been financed through the issuance to the public of equity securities by the
subsidiary. To the extent that there are no immediate investment opportunities, we have generally
applied the proceeds from the issuance of these equity offerings and from the sale of assets to
third parties towards debt reduction or increasing our cash balances.
Interest Income. Interest income decreased for the three months ended March 31, 2011,
compared to the same period last year, primarily due to lower interest income earned on our cash
account balances and scheduled capital lease repayment on one of our LNG carriers which was funded
from restricted cash deposits that earn interest.
Page 27 of 36
Realized and unrealized gains (losses) on non-designated derivative instruments. Realized
and unrealized gains (losses) related to derivative instruments that are not designated as hedges
for accounting purposes are included as a separate line item in the consolidated statements of
income (loss). The realized gains (losses) relate to the amounts we actually received or paid to
settle such derivative instruments
and the unrealized gains (losses) relate to the change in fair value of such derivative
instruments. For the three months ended March 31, 2011 and 2010, such realized and unrealized gains
(losses) on non-designated derivative instruments were as follows:
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended |
|
|
|
March 31, |
|
(in thousands of U.S. Dollars) |
|
2011 |
|
|
2010 |
|
|
|
|
|
|
|
|
|
|
Realized (losses) gains relating to: |
|
|
|
|
|
|
|
|
Interest rate swap agreements |
|
|
(33,997 |
) |
|
|
(38,586 |
) |
Interest rate swap agreement amendments |
|
|
(92,672 |
) |
|
|
|
|
Foreign currency forward contracts |
|
|
1,325 |
|
|
|
(323 |
) |
Forward freight agreements and bunker fuel swap contracts |
|
|
49 |
|
|
|
(2,149 |
) |
|
|
|
|
|
|
|
|
|
|
(125,295 |
) |
|
|
(41,058 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Unrealized gains (losses) relating to: |
|
|
|
|
|
|
|
|
Interest rate swap agreements |
|
|
141,859 |
|
|
|
(45,806 |
) |
Foreign currency forward contracts |
|
|
6,707 |
|
|
|
(3,217 |
) |
Forward freight agreements, bunker fuel swap contracts and other |
|
|
(14 |
) |
|
|
2,234 |
|
|
|
|
|
|
|
|
|
|
|
148,552 |
|
|
|
(46,789 |
) |
|
|
|
|
|
|
|
Total realized and unrealized gains (losses) on non-designated derivative instruments |
|
|
23,257 |
|
|
|
(87,847 |
) |
|
|
|
|
|
|
|
Foreign Exchange (Loss) Gain. The changes in foreign exchange (loss) gain for the three
months ended March 31, 2011, compared to the same period last year were primarily attributable to
the revaluation of our Euro-denominated term loans at the end of each period for financial
reporting purposes, and substantially all of the gains or losses are unrealized. Gains reflect a
stronger U.S. Dollar against the Euro on the date of revaluation. Losses reflect a weaker U.S.
Dollar against the Euro on the date of revaluation. Currently, our Euro-denominated revenues
generally approximate our Euro-denominated operating expenses and our Euro-denominated interest and
principal repayments.
Equity Income (Loss) from Joint Ventures. Our equity income (loss) from joint ventures was
an income of $6.4 million for the three months ended March 31, 2011, compared to a loss of $2.7
million for the same period last year. The income or loss was primarily comprised of our share of
the earnings (loss) from the Angola LNG Project, and from the Exmar and RasGas 3 Joint Ventures.
For the three months ended March 31, 2011, $4.2 million of the equity income relates to our share
of unrealized gains on interest rate swaps, compared to unrealized losses on interest rate swaps of
$6.1 million, included in equity income (loss) for the same period last year.
Income Tax (Expense) Recovery. The increase to income tax expense for the three months
ended March 31, 2011, compared to the same period last year were primarily due to an increase in
deferred income tax expense relating to unrealized foreign exchange translation gains.
LIQUIDITY AND CAPITAL RESOURCES
Liquidity and Cash Needs
Our primary sources of liquidity are cash and cash equivalents, cash flows provided by our
operations, our undrawn credit facilities, proceeds from the sale of vessels, and capital raised
through financing transactions by our subsidiaries. Our short-term liquidity requirements are for
the payment of operating expenses, debt servicing costs, dividends, scheduled repayments of
long-term debt, as well as funding our working capital requirements. As at March 31, 2011, our
total cash and cash equivalents totaled $567.3 million, compared to $779.7 million as at December
31, 2010. As at March 31, 2011, our total liquidity, including cash and undrawn credit facilities
was $2.2 billion, compared to $2.4 billion as at December 31, 2010.
Our spot tanker market operations contribute to the volatility of our net operating cash flow.
Historically, the tanker industry has been cyclical, experiencing volatility in profitability and
asset values resulting from changes in the supply of, and demand for, vessel capacity. In addition,
spot tanker markets historically have exhibited seasonal variations in charter rates. Spot tanker
markets are typically stronger in the winter months as a result of increased oil consumption in the
Northern Hemisphere and unpredictable weather patterns that tend to disrupt vessel scheduling.
As at March 31, 2011, we had $472.1 million of scheduled debt repayments and $270.9 million of
capital lease obligations coming due within the next 12 months, of which we are currently
negotiating a refinancing of $209 million of such debt. There is no assurance we will finalize
negotiations to refinance this debt. We believe that our existing cash and cash equivalents and
undrawn long-term borrowings, in addition to other sources of cash such as cash from operations,
will be sufficient to meet our existing liquidity needs for at least the next 12 months.
Our operations are capital intensive. We finance the purchase of our vessels primarily through a
combination of borrowings from commercial banks or our joint venture partners, the issuance of
equity securities and publicly traded debt instruments and cash generated from operations. In
addition, we may use sale and lease-back arrangements as a source of long-term liquidity.
Occasionally, we use our revolving credit facilities to temporarily finance capital expenditures
until longer-term financing is obtained, at which time we typically use all or a portion of the
proceeds from the longer-term financings to prepay outstanding amounts under the revolving credit
facilities. As of March 31, 2011, pre-arranged debt facilities were in place for a majority of our
then remaining capital commitments relating to our portion of newbuildings then on order. Our
pre-arranged newbuilding debt facilities are in addition to our undrawn credit facilities. We
continue to consider strategic opportunities, including the acquisition of additional vessels and
expansion into new markets. We may choose to pursue such opportunities through internal growth,
joint ventures or business acquisitions. We intend to finance any future acquisitions through
various sources of capital, including internally-generated cash flow, existing credit facilities,
additional debt borrowings, or the issuance of additional debt or equity securities or any
combination thereof.
Page 28 of 36
As at March 31, 2011, our revolving credit facilities provided for borrowings of up to $3.3
billion, of which $1.6 billion was undrawn. The amount available under these revolving credit
facilities reduces by $223.3 million (remainder of 2011), $353.3 million (2012), $760.2 million
(2013), $791.8 million (2014), $226.4 million (2015) and $930.4 million (thereafter). The revolving credit
facilities are collateralized by first-priority mortgages granted on 64 of our vessels, together
with other related security, and are guaranteed by Teekay or our subsidiaries.
Our outstanding term loans reduce in monthly, quarterly or semi-annual payments with varying
maturities through 2023. Some of the term loans also have bullet or balloon repayments at maturity
and are collateralized by first-priority mortgages granted on 29 of our vessels, together with
other related security, and are generally guaranteed by Teekay or our subsidiaries. Our unsecured
8.875% Senior Notes, amounting to $16.2 million at March 31, 2011, are due July 15, 2011.
Among other matters, our long-term debt agreements generally provide for the maintenance of certain
vessel market value-to-loan ratios and minimum consolidated financial covenants and prepayment
privileges, in some cases with penalties. Certain of the loan agreements require that we maintain a
minimum level of free cash and as at March 31, 2011, this amount was $100.0 million. Certain of the
loan agreements also require that we maintain an aggregate level of free liquidity and undrawn
revolving credit lines (with at least six months to maturity) of at least 7.5% of total debt and as
at March 31, 2011, this amount was $236.7 million. We were in compliance with all of our loan
covenants at March 31, 2011.
We conduct our funding and treasury activities within corporate policies designed to minimize
borrowing costs and maximize investment returns while maintaining the safety of the funds and
appropriate levels of liquidity for our purposes. We hold cash and cash equivalents primarily in
U.S. Dollars, with some balances held in Australian Dollars, British Pounds, Canadian Dollars,
Euros, Japanese Yen, Norwegian Kroner and Singapore Dollars.
We are exposed to market risk from foreign currency fluctuations and changes in interest rates,
spot tanker market rates for vessels and bunker fuel prices. We use forward foreign currency
contracts, cross currency and interest rate swaps, forward freight agreements and bunker fuel swap
contracts to manage currency, interest rate, spot tanker rates and bunker fuel price risks. With
the exception of some of our forward freight agreements, we do not use these financial instruments
for trading or speculative purposes. Please read Item 3 Quantitative and Qualitative Disclosures
About Market Risk.
Cash Flows
The following table summarizes our cash and cash equivalents provided by (used for) operating,
financing and investing activities for the years presented:
|
|
|
|
|
|
|
|
|
|
|
Three Months ended March 31, |
|
(in thousands of U.S. Dollars) |
|
2011 |
|
|
2010 |
|
Net operating cash flows |
|
|
(92,674 |
) |
|
|
94,781 |
|
Net financing cash flows |
|
|
20,208 |
|
|
|
151,621 |
|
Net investing cash flows |
|
|
(139,957 |
) |
|
|
(33,551 |
) |
Operating Cash Flows
Our net cash flow from operating activities fluctuates primarily as a result of changes in tanker
utilization and TCE rates, changes in interest rates, fluctuations in working capital balances, the
timing and amount of drydocking expenditures, repairs and maintenance activities, vessel additions
and dispositions, and foreign currency rates. Our exposure to the spot tanker market historically
has contributed significantly to fluctuations in operating cash flows as a result of highly
cyclical spot tanker rates.
Net cash flow from operating activities decreased to a net cash outflow of $85.0 million for the
three months ended March 31, 2011, from a net cash inflow $94.8 million for the three months ended
March 31, 2010. The net cash flow from operating activities in the three months ended March 31,
2011 decreased due to increases in working capital related to our vessel operations, an increase in
interest expense, restructuring charges in our shuttle tanker and FSO segment and a decrease from
our spot tanker sub-segment due to a reduction in the size of our spot tanker sub-segment fleet and
a reduction in the average TCE rate earned by these vessels during the three months ended March 31,
2011 compared to the same period last year. The restructuring charges were related to the sale of
an FSO unit, the Karratha Spirit, and the termination of the time-charter for a shuttle tanker, the
Basker Spirit. The net cash flow from operating activities in the three months ended March 31, 2011
also includes payments totaling $92.7 million to the counterparties of five interest rate swap
agreements in consideration for amending the terms of such agreements to reduce the weighted
average fixed interest rate from 5.1% to 2.5%. In the prior three month period ended March 31,
2010, our net cash flow from operating activities included $30.0 million related to the Foinaven
FPSO contract amendment.
The results of our four reportable segments are explained in further detail in Results of
Operations.
Financing Cash Flows
In October 2010, Teekay announced that management intended to commence repurchasing shares under
our $200 million share repurchase program. Shares will be repurchased in the open market at times
and prices considered appropriate by us. The timing of any purchases and the exact number of shares
to be purchased will be dependent on market conditions. During the three months ended March 31,
2011, we repurchased 0.6 million shares of our common stock for $19.9 million, at an average cost
of $34.14 per share, pursuant to the share repurchase program. The total remaining share repurchase
authorization at March 31, 2011, was $140 million. Please read Item 1 Financial Statements:
Note 9 Capital Stock.
During the three months ended March 31, 2011, our net proceeds from long-term debt net of debt
issuance costs were $225.7 million and our repayments and prepayments of long-term debt were $234.1
million.
In February 2011, Teekay Tankers completed a public offering of 9.9 million common shares of its
Class A Common Stock (including 1.3 million common shares issued upon the exercise of the
underwriters overallotment option) at a price of $11.33 per share, for gross proceeds of
approximately $112.1 million. Please read Item 1 Financial Statements: Note 6 Financing
Transactions.
Page 29 of 36
In April 2011, Teekay LNG completed a public offering of 4.3 million common units (including 0.6
million common units issued upon the partial exercise of the underwriters overallotment option) at
a price of $38.88 per unit, for gross proceeds (including the general partners proportionate
capital contribution) of approximately $168.7 million. Please read Item 1 Financial Statements:
Note 19 Subsequent Events.
Dividends paid during the three months ended March 31, 2011, were $23.2 million, or $0.3163 per
share. Subject to financial results and declaration by the Board of Directors, we currently intend
to continue to declare and pay a regular quarterly dividend in such amount per share on our common
stock. We have paid a quarterly dividend since 1995.
Distributions from subsidiaries to non-controlling interests during the three months ended March
31, 2011, were $48.1 million.
Investing Cash Flows
During the three months ended March 31, 2011, we:
|
|
|
incurred capital expenditures for vessels and equipment of $83.8 million, primarily for
capitalized vessel modifications and shipyard construction installment payments on our
newbuilding shuttle tankers and the conversion costs of an FPSO unit; |
|
|
|
invested in a term loan for $70.0 million that bears interest at an interest rate of 9%
per annum and has a fixed term of three years, repayable in full on maturity and is
collateralized by a first priority mortgage on a 2011-built VLCC; and |
|
|
|
received net proceeds of $5.1 million from the sale of a 1988-built FSO unit. |
CONTRACTUAL OBLIBATIONS AND CONTINGENCIES
The following table summarizes our long-term contractual obligations as at March 31, 2011:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Remainder of |
|
|
|
|
|
|
|
|
|
|
In millions of U.S. Dollars |
|
Total |
|
|
2011 |
|
|
2012 and 2013 |
|
|
2014 and 2015 |
|
|
Beyond 2015 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
U.S. Dollar-Denominated Obligations: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Long-term debt (1) |
|
|
4,060.4 |
|
|
|
212.2 |
|
|
|
762.2 |
|
|
|
1,112.2 |
|
|
|
1,973.8 |
|
Chartered-in vessels (operating leases) |
|
|
366.2 |
|
|
|
132.3 |
|
|
|
176.5 |
|
|
|
39.0 |
|
|
|
18.4 |
|
Commitments under capital leases (2) |
|
|
192.0 |
|
|
|
192.0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Commitments under capital leases (3) |
|
|
1,019.1 |
|
|
|
18.0 |
|
|
|
48.0 |
|
|
|
48.0 |
|
|
|
905.1 |
|
Commitments under operating leases (4) |
|
|
451.7 |
|
|
|
18.8 |
|
|
|
50.2 |
|
|
|
50.2 |
|
|
|
332.5 |
|
Newbuilding installments (5) (6) |
|
|
692.4 |
|
|
|
545.3 |
|
|
|
147.1 |
|
|
|
|
|
|
|
|
|
Asset retirement obligation |
|
|
24.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
24.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total U.S. Dollar-denominated obligations |
|
|
6,805.9 |
|
|
|
1,118.6 |
|
|
|
1,184.0 |
|
|
|
1,249.4 |
|
|
|
3,253.9 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Euro-Denominated Obligations: (7) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Long-term debt (8) |
|
|
391.5 |
|
|
|
10.4 |
|
|
|
226.0 |
|
|
|
17.3 |
|
|
|
137.8 |
|
Commitments under capital leases (2) (9) |
|
|
91.8 |
|
|
|
91.8 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Euro-denominated obligations |
|
|
483.3 |
|
|
|
102.2 |
|
|
|
226.0 |
|
|
|
17.3 |
|
|
|
137.8 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total |
|
|
7,289.2 |
|
|
|
1,220.8 |
|
|
|
1,410.0 |
|
|
|
1,266.7 |
|
|
|
3,391.7 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(1) |
|
Excludes expected interest payments of $88.7 million (remainder of 2011), $170.6
million (2012 and 2013), $133.6 million (2014 and 2015) and $245.6 million (beyond 2015).
Expected interest payments are based on the existing interest rates (fixed-rate loans) and
LIBOR plus margins that ranged up to 3.25% at March 31, 2011 (variable-rate loans). The
expected interest payments do not reflect the effect of related interest rate swaps that we
have used as an economic hedge of certain of our floating-rate debt. |
|
(2) |
|
Includes, in addition to lease payments, amounts we are required to pay to purchase
certain leased vessels at the end of the lease terms. We are obligated to purchase five of
our existing Suezmax tankers upon the termination of the related capital leases, which may
occur in 2011. The purchase price will be based on the unamortized portion of the vessel
construction financing costs for the vessels, which we expect to range from $31.7 million
to $39.2 million per vessel. We expect to satisfy the purchase price by assuming the
existing vessel financing, although we may be required to obtain separate debt or equity
financing to complete the purchases if the lenders do not consent to our assuming the
financing obligations. |
|
(3) |
|
Existing restricted cash deposits of $476.9 million, together with the interest earned
on the deposits, are expected to be sufficient to repay the remaining amounts we currently
owe under the lease arrangements. |
|
(4) |
|
We have corresponding leases whereby we are the lessor and expect to receive
approximately $411.9 million for these leases from 2011 to 2029. As at March 31, 2011, we
had received $98.5 million of lease receipts. |
|
(5) |
|
Represents remaining construction costs (excluding capitalized interest and
miscellaneous construction costs) for one FPSO unit, one LPG carrier, two multi-gas
carriers and two shuttle tankers as of March 31, 2011. Please read Item 1 Financial
Statements: Note 10(a) Commitments and Contingencies Vessels Under Construction. |
Page 30 of 36
|
|
|
(6) |
|
We have a 33% interest in a joint venture that has entered into agreements for the
construction of four LNG carriers and a 50% interest in a joint venture that has entered
into an agreement for the construction of a VLCC. As at March 31, 2011, the remaining
commitments on these vessels, excluding capitalized interest and other miscellaneous
construction costs, totaled $644.6 million of which our share is $226.1 million. Please read
Item 1 Financial Statements: Note 10(b) Commitments and Contingencies Joint
Ventures. |
|
(7) |
|
Euro-denominated obligations are presented in U.S. Dollars and have been converted
using the prevailing exchange rate as at March 31, 2011. |
|
(8) |
|
Excludes expected interest payments of $4.6 million (remainder of 2011), $6.8 million
(2012 and 2013), $4.6 million (2014 and 2015) and $11.4 million (beyond 2015). Expected
interest payments are based on EURIBOR at March 31, 2011, plus margins that ranged up to
0.66%, as well as the prevailing U.S. Dollar/Euro exchange rate as of March 31, 2011. The
expected interest payments do not reflect the effect of related interest rate swaps that we
have used as an economic hedge of certain of our floating-rate debt. |
|
(9) |
|
Existing restricted cash deposits of $88.4 million, together with the interest earned
on these deposits, are expected to equal the remaining amounts we owe under the lease
arrangement, including our obligation to purchase the vessel at the end of the lease term. |
Off-Balance Sheet Arrangements
We have no off-balance sheet arrangements that have or are reasonably likely to have, a current or
future material effect on our financial condition, changes in financial condition, revenues or
expenses, results of operations, liquidity, capital expenditures or capital resources.
CRITICAL ACCOUNTING ESTIMATES
We prepare our consolidated financial statements in accordance with GAAP, which require us to make
estimates in the application of our accounting policies based on our best assumptions, judgments
and opinions. On a regular basis, management reviews the accounting policies, assumptions,
estimates and judgments to ensure that our consolidated financial statements are presented fairly
and in accordance with GAAP. However, because future events and their effects cannot be determined
with certainty, actual results could differ from our assumptions and estimates, and such
differences could be material. Accounting estimates and assumptions that we consider to be the most
critical to an understanding of our financial statements because they inherently involve
significant judgments and uncertainties, are discussed in this section and Item 5 Operating and
Financial Review and Prospects in our Annual Report on Form 20-F for the year ended December 31,
2010.
FORWARD-LOOKING STATEMENTS
This Report on Form 6-K for the three months ended March 31, 2011, contains certain forward-looking
statements (as such term is defined in Section 21E of the Securities Exchange Act of 1934, as
amended) concerning future events and our operations, performance and financial condition,
including, in particular, statements regarding:
|
|
our future growth prospects; |
|
|
our ability to competitively pursue new FPSO projects; |
|
|
tanker market fundamentals, including the balance of supply and demand in the tanker market
and spot tanker charter rates; |
|
|
the expected return on our investment in first priority ship mortgage loans; |
|
|
the sufficiency of working capital for short-term liquidity requirements; |
|
|
future capital expenditure commitments and the financing requirements for such commitments; |
|
|
delivery dates of and financing for newbuildings, and the commencement of service of
newbuildings under long-term time-charter contracts; |
|
|
potential newbuilding order cancellations; |
|
|
the expected timing and costs of upgrades to any vessels; |
|
|
our ability to pay dividends on our common stock; |
|
|
the future valuation of goodwill; |
|
|
our compliance with covenants under our credit facilities; |
|
|
the outcome of our negotiations to refinance $209 million of debt; |
|
|
our hedging activities relating to foreign currency exchange and interest rate risks; |
|
|
the adequacy of restricted cash deposits to fund capital lease obligations; |
|
|
the effectiveness of our risk management policies and procedures and the ability of the
counter-parties to our derivative contracts to fulfill their contractual obligations; |
|
|
the condition of financial and economic markets, including interest rate volatility and the
availability and cost of capital; and |
|
|
the growth of global oil demand. |
Page 31 of 36
Forward-looking statements include, without limitation, any statement that may predict, forecast,
indicate or imply future results, performance or achievements, and may contain the words believe,
anticipate, expect, estimate, project, will be, will continue, will likely result, or
words or phrases of similar meanings. These statements involve known and unknown risks and are
based upon a number of assumptions and estimates that are inherently subject to significant
uncertainties and contingencies, many of which are beyond our control. Actual results may differ
materially from those expressed or implied by such forward-looking statements. Important factors
that could cause actual results to differ materially include, but are not limited to: changes in
production of oil from offshore oil fields; changes in the demand for offshore oil transportation,
processing and storage services; changes in demand for LNG and LPG; greater or less than
anticipated levels of vessel newbuilding orders or greater or less than anticipated rates of vessel
scrapping; changes in trading patterns; changes in volumes of oil purchased under the Foinaven
contract and the related price of oil; changes in applicable industry laws and regulations and the
timing of implementation of new laws and regulations; potential inability to implement our growth
strategy; competitive factors in the markets in which we operate; potential for early termination
of long-term contracts and our potential inability to renew or replace long-term contracts; loss of
any customer, time-charter or vessel; shipyard production or vessel delivery delays; our potential
inability to raise financing to purchase additional vessels; our exposure to foreign currency
exchange, interest rate and tanker spot market rate fluctuations; conditions in the public equity
markets; and other factors detailed from time to time in our periodic reports filed with the SEC,
including our Annual Report on Form 20-F for the year ended December 31, 2010. We do not intend to
release publicly any updates or revisions to any forward-looking statements contained herein to
reflect any change in our expectations with respect thereto or any change in events, conditions or
circumstances on which any such statement is based.
Page 32 of 36
TEEKAY CORPORATION AND SUBSIDIARIES
MARCH 31, 2011
PART I FINANCIAL INFORMATION
|
|
|
ITEM 3 - |
|
QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK |
We are exposed to market risk from foreign currency fluctuations and changes in interest rates,
bunker fuel prices and spot tanker market rates for vessels. We use foreign currency forward
contracts, cross currency and interest rate swaps, bunker fuel swap contracts and forward freight
agreements to manage currency, interest rate, bunker fuel price and spot tanker market rate risks
but do not use these financial instruments for trading or speculative purposes, except as noted
below under Spot Tanker Market Rate Risk. Please read Item 1 Financial Statements: Note 15
Derivative Instruments and Hedging Activities.
Foreign Currency Fluctuation Risk
Our primary economic environment is the international shipping market. Transactions in this market
generally utilize the U.S. Dollar. Consequently, a substantial majority of our revenues and most of
our operating costs are in U.S. Dollars. We incur certain voyage expenses, vessel operating
expenses, drydocking and overhead costs in foreign currencies, the most significant of which are
the Australian Dollar, British Pound, Canadian Dollar, Euro, Norwegian Kroner and Singapore Dollar.
There is a risk that currency fluctuations will have a negative effect on the value of cash flows.
We reduce our exposure by entering into foreign currency forward contracts. In most cases, we hedge
a substantial majority of our net foreign currency exposure for the following 12 months. We
generally do not hedge our net foreign currency exposure beyond three years forward.
As at March 31, 2011, we had the following foreign currency forward contracts:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Expected Maturity Date |
|
|
|
|
|
|
Remainder of |
|
|
|
|
|
|
|
|
|
|
|
|
2011 |
|
|
2012 |
|
|
Total |
|
|
Total |
|
|
|
Contract |
|
|
Contract |
|
|
Contract |
|
|
Fair value |
|
|
|
Amount (1) |
|
|
Amount (1) |
|
|
Amount (1) |
|
|
Asset (1) |
|
Norwegian Kroner: |
|
$ |
93.7 |
|
|
$ |
52.3 |
|
|
$ |
146.0 |
|
|
$ |
16.3 |
|
Average contractual exchange rate (2) |
|
|
6.15 |
|
|
|
6.34 |
|
|
|
6.24 |
|
|
|
|
|
Euro: |
|
$ |
39.9 |
|
|
$ |
16.2 |
|
|
$ |
56.1 |
|
|
$ |
2.9 |
|
Average contractual exchange rate (2) |
|
|
0.74 |
|
|
|
0.76 |
|
|
|
0.75 |
|
|
|
|
|
Canadian Dollar: |
|
$ |
14.3 |
|
|
$ |
7.5 |
|
|
$ |
21.8 |
|
|
$ |
1.3 |
|
Average contractual exchange rate (2) |
|
|
1.04 |
|
|
|
1.02 |
|
|
|
1.03 |
|
|
|
|
|
British Pounds: |
|
$ |
32.2 |
|
|
$ |
13.9 |
|
|
$ |
46.1 |
|
|
$ |
2.0 |
|
Average contractual exchange rate (2) |
|
|
0.65 |
|
|
|
0.66 |
|
|
|
0.65 |
|
|
|
|
|
|
|
|
(1) |
|
Contract amounts and fair value amounts in millions of U.S. Dollars. |
|
(2) |
|
Average contractual exchange rate represents the contractual amount of foreign currency one
U.S. Dollar will buy. |
Although the majority of our transactions, assets and liabilities are denominated in U.S. Dollars,
certain of our subsidiaries have foreign currency-denominated liabilities. There is a risk that
currency fluctuations will have a negative effect on the value of our cash flows. We have not
entered into any forward contracts to protect against the translation risk of our foreign
currency-denominated liabilities. As at March 31, 2011, we had Euro-denominated term loans of 276.5
million Euros ($391.5 million) included in long-term debt and Norwegian Kroner-denominated deferred
income taxes of approximately 59.7 million ($10.8 million). We receive Euro-denominated revenue
from certain of our time-charters. These Euro cash receipts generally are sufficient to pay the
principal and interest payments on our Euro-denominated term loans. Consequently, we have not
entered into any foreign currency forward contracts with respect to our Euro-denominated term
loans, although there is no assurance that our exposure to fluctuations in the Euro will not
increase in the future.
Interest Rate Risk
We are exposed to the impact of interest rate changes primarily through our borrowings that require
us to make interest payments based on LIBOR or EURIBOR. Significant increases in interest rates
could adversely affect our operating margins, results of operations and our ability to repay our
debt. We use interest rate swaps to reduce our exposure to market risk from changes in interest
rates. Generally our approach is to hedge a substantial majority of floating-rate debt associated
with our vessels that are operating on long-term fixed-rate contracts. We manage the rest of our
debt based on our outlook for interest rates and other factors.
In order to minimize counterparty risk, we only enter into derivative transactions with
counterparties that are rated A- or better by Standard & Poors or A3 or better by Moodys at the
time of the transaction. In addition, to the extent possible and practical, interest rate swaps are
entered into with different counterparties to reduce concentration risk.
Page 33 of 36
The table below provides information about our financial instruments at March 31, 2011, which are
sensitive to changes in interest rates, including our debt and capital lease obligations and
interest rate swaps. For long-term debt and capital lease obligations, the table presents principal
cash flows and related weighted-average interest rates by expected maturity dates. For interest
rate swaps, the table presents notional amounts and weighted-average interest rates by expected
contractual maturity dates.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fair |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Value |
|
|
|
|
|
|
Expected Maturity Date |
|
|
|
|
|
|
Asset / |
|
|
|
|
|
|
2011 |
|
|
2012 |
|
|
2013 |
|
|
2014 |
|
|
2015 |
|
|
Thereafter |
|
|
Total |
|
|
(Liability) |
|
|
Rate(1) |
|
|
|
(in millions of U.S. dollars, except percentages) |
|
Long-Term Debt: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Variable Rate ($U.S.) (2) |
|
|
162.8 |
|
|
|
262.3 |
|
|
|
411.2 |
|
|
|
860.0 |
|
|
|
163.6 |
|
|
|
1,318.3 |
|
|
|
3,178.1 |
|
|
|
(2,832.5 |
) |
|
|
1.2 |
% |
Variable Rate (Euro) (3) (4) |
|
|
10.4 |
|
|
|
218.3 |
|
|
|
7.7 |
|
|
|
8.3 |
|
|
|
8.9 |
|
|
|
137.9 |
|
|
|
391.5 |
|
|
|
(364.6 |
) |
|
|
1.6 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fixed-Rate Debt ($U.S.) |
|
|
60.6 |
|
|
|
44.4 |
|
|
|
44.3 |
|
|
|
44.3 |
|
|
|
44.3 |
|
|
|
655.5 |
|
|
|
882.3 |
|
|
|
(1,019.9 |
) |
|
|
7.0 |
% |
Average Interest Rate |
|
|
6.2 |
% |
|
|
5.2 |
% |
|
|
5.2 |
% |
|
|
5.2 |
% |
|
|
5.2 |
% |
|
|
7.5 |
% |
|
|
7.0 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Capital Lease Obligations (5) (6) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fixed-Rate ($U.S.) (7) |
|
|
183.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
183.1 |
|
|
|
(183.1 |
) |
|
|
7.4 |
% |
Average Interest Rate (8) |
|
|
7.4 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7.4 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Interest Rate Swaps: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Contract Amount ($U.S.) (6) (9) (10) |
|
|
143.0 |
|
|
|
276.3 |
|
|
|
82.5 |
|
|
|
96.4 |
|
|
|
68.5 |
|
|
|
2,791.3 |
|
|
|
3,457.9 |
|
|
|
(329.2 |
) |
|
|
4.2 |
% |
Average Fixed Pay Rate (2) |
|
|
3.2 |
% |
|
|
3.0 |
% |
|
|
4.6 |
% |
|
|
4.6 |
% |
|
|
4.6 |
% |
|
|
5.2 |
% |
|
|
4.2 |
% |
|
|
|
|
|
|
|
|
Contract Amount (Euro) (4) (9) |
|
|
10.4 |
|
|
|
218.3 |
|
|
|
7.7 |
|
|
|
8.3 |
|
|
|
8.9 |
|
|
|
138.0 |
|
|
|
391.6 |
|
|
|
(15.0 |
) |
|
|
3.8 |
% |
Average Fixed Pay Rate (3) |
|
|
3.8 |
% |
|
|
3.8 |
% |
|
|
3.7 |
% |
|
|
3.7 |
% |
|
|
3.7 |
% |
|
|
3.8 |
% |
|
|
3.8 |
% |
|
|
|
|
|
|
|
|
|
|
|
(1) |
|
Rate refers to the weighted-average effective interest rate for our long-term debt and
capital lease obligations, including the margin we pay on our floating-rate, which as of March
31, 2011, ranged from 0.3% to 3.25%. The average interest rate for our capital lease
obligations is the weighted-average interest rate implicit in our lease obligations at the
inception of the leases. |
|
(2) |
|
Interest payments on U.S. Dollar-denominated debt and interest rate swaps are based on LIBOR.
The average fixed pay rate for our interest rate swaps excludes the margin we pay on our
floating-rate debt. |
|
(3) |
|
Interest payments on Euro-denominated debt and interest rate swaps are based on EURIBOR. |
|
(4) |
|
Euro-denominated amounts have been converted to U.S. Dollars using the prevailing exchange
rate as of March 31, 2011. |
|
(5) |
|
Excludes capital lease obligations (present value of minimum lease payments) of 62.1 million
Euros ($87.9 million) on one of our existing LNG carriers with a weighted-average fixed
interest rate of 5.8%. Under the terms of this fixed-rate lease obligation, we are required to
have on deposit, subject to a weighted-average fixed interest rate of 5.1%, an amount of cash
that, together with the interest earned thereon, will fully fund the amount owing under the
capital lease obligation, including a vessel purchase obligation. As at March 31, 2011, the
amount on deposit was 62.5 million Euros ($88.4 million). Consequently, we are not subject to
interest rate risk from these obligations or deposits. |
|
(6) |
|
Under the terms of the capital leases for the RasGas II LNG Carriers (see Item 1 Financial
Statements: Note 5 Vessel Charters), we are required to have on deposit, subject to a
variable rate of interest, an amount of cash that, together with interest earned on the
deposit, will equal the remaining amounts owing under the variable-rate leases. The deposits,
which as at March 31, 2011 totaled $476.9 million, and the lease obligations, which as at
March 31, 2011 totaled $470.9 million, have been swapped for fixed-rate deposits and
fixed-rate obligations. Consequently, we are not subject to interest rate risk from these
obligations and deposits and, therefore, the lease obligations, cash deposits and related
interest rate swaps have been excluded from the table above. As at March 31, 2011, the
contract amount, fair value and fixed interest rates of these interest rate swaps related to
the RasGas II LNG Carriers capital lease obligations and restricted cash deposits were $433.7
million and $471.2 million, ($50.1) million and $55.0 million, and 4.9% and 4.8%,
respectively. |
|
(7) |
|
The amount of capital lease obligations represents the present value of minimum lease
payments together with our purchase obligation, as applicable. |
|
(8) |
|
The average interest rate is the weighted-average interest rate implicit in the capital lease
obligations at the inception of the leases. |
|
(9) |
|
The average variable receive rate for our interest rate swaps is set monthly at the 1-month
LIBOR or EURIBOR, quarterly at the 3-month LIBOR or semi-annually at the 6-month LIBOR. |
|
(10) |
|
Includes interest rate swaps of $200 million that commence in June 2011 and September 2011. |
Commodity Price Risk
From time to time we use bunker fuel swap contracts as economic hedges to protect against changes
in forecasted bunker fuel costs for certain vessels being time-chartered-out and for vessels
servicing certain contracts of affreightment. As at March 31, 2011, we have no bunker fuel swap
commitments.
Spot Tanker Market Rate Risk
We use forward freight agreements (or FFAs) as economic hedges to protect against changes in spot
tanker market rates earned by some of our vessels in our spot tanker segment. FFAs involve
contracts to move a theoretical volume of freight at fixed-rates. As at March 31, 2011, the FFAs
had a nominal net fair value liability. The FFAs expire between April 2011 and June 2011. We have
not designated these contracts as cash flow hedges for accounting purposes.
Page 34 of 36
TEEKAY CORPORATION AND SUBSIDIARIES
MARCH 31, 2011
PART II OTHER INFORMATION
|
|
|
Item 1 |
|
Legal Proceedings |
None
In addition to the other information set forth in this Report on Form 6-K, you should carefully
consider the risk factors discussed in Part I, Item 3. Key InformationRisk Factors in our
Annual Report on Form 20-F for the year ended December 31, 2010, which could materially affect
our business, financial condition or results of operations.
|
|
|
Item 2 |
|
Unregistered Sales of Equity Securities and Use of Proceeds |
None
|
|
|
Item 3 |
|
Defaults Upon Senior Securities |
None
None
|
|
|
Item 5 |
|
Other Information |
None
Exhibit 1.3 Amended and Restated Bylaws of Teekay Corporation
THIS REPORT ON FORM 6-K IS HEREBY INCORPORATED BY REFERENCE INTO THE FOLLOWING REGISTRATION
STATEMENTS OF THE COMPANY.
|
|
REGISTRATION STATEMENT ON FORM F-3 (FILE NO. 33-97746) FILED WITH THE SEC ON OCTOBER 4,
1995; |
|
|
|
REGISTRATION STATEMENT ON FORM S-8 (FILE NO. 333-42434) FILED WITH THE SEC ON JULY 28,
2000; |
|
|
|
REGISTRATION STATEMENT ON FORM S-8 (FILE NO. 333-119564) FILED WITH THE SEC ON OCTOBER 6,
2004; |
|
|
|
REGISTRATION STATEMENT ON FORM S-8 (FILE NO. 333-147683) FILED WITH THE SEC ON NOVEMBER 28,
2007; AND |
|
|
|
REGISTRATION STATEMENT ON FORM S-8 (FILE NO. 333-166523) FILED WITH THE SEC ON MAY 5, 2010. |
Page 35 of 36
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused
this report to be signed on its behalf by the undersigned, thereunto duly authorized.
|
|
|
|
|
|
TEEKAY CORPORATION
|
|
Date: May 31, 2011 |
By: |
/s/ Vincent Lok
|
|
|
|
Vincent Lok |
|
|
|
Executive Vice President and
Chief Financial Officer
(Principal Financial and Accounting Officer) |
|
Page 36 of 36