Sign In  |  Register  |  About Walnut Creek Guide  |  Contact Us

Walnut Creek, CA
September 01, 2020 1:43pm
7-Day Forecast | Traffic
  • Search Hotels in Walnut Creek Guide

  • CHECK-IN:
  • CHECK-OUT:
  • ROOMS:

Weston Announces Task Order Win for EV Charging Stations under the CEHNC FRR II Contract

By: Prodigy
07/19/2024, West Chester // PRODIGY: Feature Story //

West Chester, PA (July 16, 2024) — Weston Solutions, Inc. (Weston) wins a third task order (TO) under the U.S. Army Engineering and Support Center, Huntsville Facility Repair and Renewal (FRR) II Contract. This task is for the design and construction of electric vehicle charging stations (EVCSs) for U.S. Army Corps of Engineers (USACE) South Atlantic Division. Our efforts now extend to 118 charging stations at 11 different locations across the United States. Delivering this critical infrastructure in a consistent and secure manner across multiple facilities enables the efficient and effective transition of the USACE fleet.

This strategic mission directly supports the U.S. Army Climate Strategy and will be led by Weston staff with expertise in EVCS system design, construction, and commissioning. This Weston team is also experienced in performing logistically challenging concurrent projects across multiple sites and states. Our turnkey execution includes site assessment; design; permitting; equipment specification, acquisition, shipment, installation, commissioning, and optimization; facility construction; and post-installation maintenance and training.

Senior Vice President and Chief Strategy and Development Officer, Matthew Beatty, notes, “Building on nearly 20 years of design, construction, operations and maintenance of tactical and non-tactical fleet fueling system services for our clients, we are proud to lead the delivery of these new systems in support of their energy transition and the decarbonization of their transportation networks.”

The explosive growth of the global energy transition and resilience market has resulted in equally explosive growth in career opportunities. Upholding our mission for sustainable development, we share the social responsibility to “future-proof” infrastructure assets and remain committed to supporting the energy transition toward net-zero emissions. We are passionate about serving the needs of our customers to reach these goals.

About Weston Solutions, Inc.

Weston Solutions is a U.S.-based, 100% employee-owned environmental and infrastructure services firm committed to safety and delivering client value on every assignment. For over 65 years, we have solved our clients’ most difficult challenges while making a difference in the communities we serve.



Source: Prodigy.press

Release ID: 1073612

Original Source of the original story >> Weston Announces Task Order Win for EV Charging Stations under the CEHNC FRR II Contract


Data & News supplied by www.cloudquote.io
Stock quotes supplied by Barchart
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
 
 
Copyright © 2010-2020 WalnutCreekGuide.com & California Media Partners, LLC. All rights reserved.